{"help": "https://ckan0.cf.opendata.inter.prod-toronto.ca/am/api/3/action/help_show?name=datastore_search", "success": true, "result": {"include_total": true, "limit": 100, "records_format": "objects", "resource_id": "40d94b5a-cbf2-4e04-8d48-24038d163d0c", "total_estimation_threshold": null, "records": [{"_id":1,"OBJECTID":132,"PROJ_NUM":"TS2023-13-146","LAST_UPDATED_DATE":"2025-06-13","PROJECT":"Laneway Reconstruction","LOCATION":"COATSWORTH ST&lt;br&gt; From: ONTARIO ST&lt;br&gt; To: MILAN ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2025 - Q3 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Newsha Roshani, Engineering and Construction Services","CONTACT_EMAIL":"nroshan@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3684011389528, 43.6584551847988], [-79.3678113567135, 43.658584897833]]}"},{"_id":2,"OBJECTID":241,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Rehabilitation","LOCATION":"WINONA DR&lt;br&gt; From: CLOVELLY AVE&lt;br&gt; To: [W] GLOUCESTER GRV [BRANCH] ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Cherry Chen, Engineering and Construction Services","CONTACT_EMAIL":"cchen9@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4380314984721, 43.6956078162082], [-79.4383663261139, 43.6964500228049]]}"},{"_id":3,"OBJECTID":398,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Reconstruction","LOCATION":"ST LEONARDS AVE&lt;br&gt; From: CITY LIMIT&lt;br&gt; To: [155 m W] MILDENHALL RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3892506862722, 43.7236794705932], [-79.3887718705558, 43.7237594047772], [-79.3868376928876, 43.7241643264962]]}"},{"_id":4,"OBJECTID":438,"PROJ_NUM":"TS2023-24-430","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Major Road Reconstruction","LOCATION":"SCARBOROUGH GOLF CLUB RD&lt;br&gt; From: LAWRENCE AVE E&lt;br&gt; To: BRIMORTON DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2025 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Mehrshad Rahimi, Engineering and Construction Services","CONTACT_EMAIL":"mrahimi@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2158381225919, 43.7618520399872], [-79.2158283938479, 43.7619500206472], [-79.2158324497454, 43.7620534722902], [-79.2158488834155, 43.7622025006728], [-79.2158485212682, 43.7623157526123], [-79.215853317446, 43.7624097548501], [-79.215862044374, 43.7625208330936], [-79.2158722099797, 43.7626349663102], [-79.2158872766935, 43.7627527211795], [-79.2159039642928, 43.7628665285559], [-79.2159326998846, 43.7629933005652], [-79.2159616928871, 43.7630971922094], [-79.2160035890775, 43.7632196943376], [-79.2160622047126, 43.7633968841341], [-79.2161691095797, 43.7636843322275], [-79.2162850242508, 43.7639235652656], [-79.2163939388603, 43.7641961481681], [-79.2164369250009, 43.7643170056035], [-79.2166796479402, 43.7648884981054], [-79.2177392105135, 43.7675540537845], [-79.2183042193101, 43.7688979362419], [-79.2186842194236, 43.7698112486013]]}"},{"_id":5,"OBJECTID":473,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"CARLTON ST&lt;br&gt; From: WOODSTOCK PL&lt;br&gt; To: BOWMAN ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Jessica Orjuela, Engineering and Construction Services","CONTACT_EMAIL":"jorjuel@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3645021603355, 43.6652537450132], [-79.3644791353226, 43.6652587854712], [-79.3644459003492, 43.6652660821547], [-79.3638396618719, 43.6654072497246]]}"},{"_id":6,"OBJECTID":493,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"REGENT ST&lt;br&gt; From: SUTTON AVE&lt;br&gt; To: ST DAVID WALK ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3637847232498, 43.6579141519399], [-79.3640219851897, 43.658529685528]]}"},{"_id":7,"OBJECTID":527,"PROJ_NUM":"TS2023-13-044","LAST_UPDATED_DATE":"2025-08-28","PROJECT":"Local Road Reconstruction","LOCATION":"SACKVILLE PL&lt;br&gt; From: WOODSTOCK PL&lt;br&gt; To: FLAGLER ST ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2025 - Q3 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Newsha Roshani, Engineering and Construction Services","CONTACT_EMAIL":"nroshan@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3647596583441, 43.6659572703185], [-79.3646466638657, 43.6659828713997]]}"},{"_id":8,"OBJECTID":748,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2025-08-21","PROJECT":"Local Road Reconstruction","LOCATION":"ST LEONARDS AVE&lt;br&gt; From: LEWES CRES&lt;br&gt; To: BAYVIEW AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3840849904893, 43.7247559652186], [-79.3821241676272, 43.7251647406227], [-79.3811784960871, 43.7253741475065], [-79.3811055684622, 43.7253902919103], [-79.3802036347488, 43.7255848031466]]}"},{"_id":9,"OBJECTID":1145,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-30","PROJECT":"Local Road Reconstruction","LOCATION":"[E-W] RIPLEY AVE [LEG]&lt;br&gt; From: SOUTH KINGSWAY&lt;br&gt; To: RIPLEY AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"&lt;Null&gt; Transportation Roads State of Good Repair","CONTACT_EMAIL":"RoadSOGR@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4752735067663, 43.6367801228756], [-79.4750956403653, 43.6368789644543], [-79.4747420400863, 43.6370114142297], [-79.4746954581377, 43.6370258151413], [-79.4746477322885, 43.6370488931129], [-79.474601858692, 43.6370880749489], [-79.4745885481266, 43.6371459598801], [-79.4745930690629, 43.637182047426]]}"},{"_id":10,"OBJECTID":1927,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-11-17","PROJECT":"Local Road Rehabilitation","LOCATION":"WALES AVE&lt;br&gt; From: LEONARD AVE&lt;br&gt; To: CARLYLE ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4042150511109, 43.652833894951], [-79.4046340390871, 43.6527447177591], [-79.4046965946901, 43.6527289365414], [-79.4047441872224, 43.652713043807], [-79.4048000409757, 43.6526783991049]]}"},{"_id":11,"OBJECTID":2688,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Laneway Reconstruction","LOCATION":"[46.30 m N] DUNDAS ST W&lt;br&gt; From: BEVERLEY ST&lt;br&gt; To: [42.70 m W] BEVERLEY ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3940517146883, 43.6542702749187], [-79.3945509554386, 43.6541713705789]]}"},{"_id":12,"OBJECTID":2799,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-07-14","PROJECT":"Laneway Reconstruction","LOCATION":"[195.70 m N] DAVENPORT RD&lt;br&gt; From: ST CLARENS AVE&lt;br&gt; To: [36.10 m W] ST CLARENS AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.448182713631, 43.6734808147367], [-79.4487804313447, 43.673349970823]]}"},{"_id":13,"OBJECTID":2800,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-07-14","PROJECT":"Laneway Reconstruction","LOCATION":"[87.20 m N] DAVENPORT RD&lt;br&gt; From: GREENLAW AVE&lt;br&gt; To: ST CLARENS AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4464401812318, 43.6729095345887], [-79.4464681359274, 43.6728510030618], [-79.4465036880802, 43.6728113868685], [-79.4465549637254, 43.6727870172607], [-79.4471822098812, 43.6726508216981], [-79.4478080640224, 43.6725149190985]]}"},{"_id":14,"OBJECTID":3056,"PROJ_NUM":"TS2023-18-207","LAST_UPDATED_DATE":"2026-08-28","PROJECT":"Local Road Reconstruction","LOCATION":"LAILEY CRES&lt;br&gt; From: [100 m W] HIGHGATE AVE [CUL-DE-SAC]&lt;br&gt; To: HIGHGATE AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2026 - 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"&lt;Null&gt; Transportation Roads State of Good Repair","CONTACT_EMAIL":"RoadSOGR@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3980907773587, 43.7773277311669], [-79.3968946527875, 43.7776027959757]]}"},{"_id":15,"OBJECTID":3445,"PROJ_NUM":"TS2023-08-114","LAST_UPDATED_DATE":"2026-08-11","PROJECT":"Laneway Reconstruction","LOCATION":"[37 m N] BEDFORD PARK AVE&lt;br&gt; From: AVENUE RD&lt;br&gt; To: GREY RD ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2026 - Q3 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fulvio Naccarato, Engineering and Construction Services","CONTACT_EMAIL":"fnaccar@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4167171152926, 43.7249710133473], [-79.4195982658871, 43.7243612797743]]}"},{"_id":16,"OBJECTID":3654,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-19","PROJECT":"Local Road Reconstruction","LOCATION":"RIDELLE AVE&lt;br&gt; From: MANITOU BLVD&lt;br&gt; To: LAWNHURST BLVD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4285835799934, 43.7067692746395], [-79.4306603407718, 43.7063224609686]]}"},{"_id":17,"OBJECTID":3860,"PROJ_NUM":"TS2023-10_11-435","LAST_UPDATED_DATE":"2025-09-05","PROJECT":"Local Road Reconstruction","LOCATION":"AUGUSTA AVE&lt;br&gt; From: DUNDAS ST W&lt;br&gt; To: WALES AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4011469042311, 43.6522746030286], [-79.4012953966375, 43.6526519332204], [-79.401310162027, 43.6526894546233], [-79.4014380266513, 43.6530143608951], [-79.401568830851, 43.653346812673]]}"},{"_id":18,"OBJECTID":3862,"PROJ_NUM":"TS2023-10_11-435","LAST_UPDATED_DATE":"2025-09-05","PROJECT":"Local Road Reconstruction","LOCATION":"AUGUSTA AVE&lt;br&gt; From: OXFORD ST (TO)&lt;br&gt; To: COLLEGE ST (TO) ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4026845921798, 43.6560924157577], [-79.4032003101603, 43.6573828821898]]}"},{"_id":19,"OBJECTID":3878,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Rehabilitation","LOCATION":"WINONA DR&lt;br&gt; From: BELVIDERE AVE&lt;br&gt; To: BUDE ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Cherry Chen, Engineering and Construction Services","CONTACT_EMAIL":"cchen9@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4372030906581, 43.6935452763142], [-79.4377070748369, 43.6947908537966]]}"},{"_id":20,"OBJECTID":3886,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-12-03","PROJECT":"Laneway Reconstruction","LOCATION":"FITZROY TER&lt;br&gt; From: [50 m W] KENSINGTON AVE (TO)&lt;br&gt; To: [52 m W] KENSINGTON AVE (TO) [END] ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027 - 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4007953113944, 43.6533083653234], [-79.4009283435397, 43.6532792262868]]}"},{"_id":21,"OBJECTID":3892,"PROJ_NUM":"TS2023-11-101","LAST_UPDATED_DATE":"2025-09-05","PROJECT":"Local Road Reconstruction","LOCATION":"KENSINGTON AVE (TO)&lt;br&gt; From: FITZROY TER&lt;br&gt; To: KENSINGTON PL ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4001992261045, 43.6534389242195], [-79.4002799986347, 43.6536457378447], [-79.4003105523648, 43.6537239592681], [-79.4003885376461, 43.6539374403798]]}"},{"_id":22,"OBJECTID":3909,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"GLOS RD&lt;br&gt; From: [217 m E] CRENDON DR&lt;br&gt; To: [102 m E] CRENDON DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Completed","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5710472360338, 43.6461883366375], [-79.5705531345606, 43.6463074246984], [-79.5700184387569, 43.6464403345883], [-79.5696500583489, 43.6465228501257], [-79.5696184821238, 43.6465299174304], [-79.5695556518524, 43.6465332321744], [-79.5695018433243, 43.6465344980888], [-79.5694553119934, 43.6465257770406]]}"},{"_id":23,"OBJECTID":3920,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"CRENDON DR&lt;br&gt; From: RENFORTH DR&lt;br&gt; To: ULVERSTON RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Completed","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5735472787101, 43.6450960147083], [-79.5734067342066, 43.645183733373], [-79.5726480940779, 43.6456264282527], [-79.5725401743782, 43.6457056368159], [-79.5724136255698, 43.6458069554373], [-79.5722825017378, 43.645928439874], [-79.5721590625895, 43.6460601988693], [-79.5720382815079, 43.6461865462313], [-79.5719765759243, 43.6463008664614], [-79.5719517447579, 43.6463818043856], [-79.5719331878501, 43.6464852597759], [-79.571934293423, 43.6465807185777], [-79.5719553689536, 43.6467076155854], [-79.5719819640141, 43.6468165153791], [-79.5722359350537, 43.6473590385427], [-79.5724221361956, 43.6478042722849], [-79.5724750679686, 43.6478976999113], [-79.5725259658131, 43.6479592729722], [-79.5725810591525, 43.6480151364809], [-79.572626602396, 43.6480563788126], [-79.5726967035134, 43.6481088752199], [-79.57274736223, 43.6481465857148], [-79.5728347010313, 43.6482047869322]]}"},{"_id":24,"OBJECTID":3922,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"ELDERFIELD (W) CRES&lt;br&gt; From: [214 m S] INTERSECTION OF GLOS RD&lt;br&gt; To: INTERSECTION OF GLOS RD (WEST) ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Completed","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5705531345606, 43.6463074246984], [-79.5699644486175, 43.6449820559555], [-79.569950975184, 43.6449503613773], [-79.5699256532528, 43.6448986009911], [-79.5699001594552, 43.6448696231707], [-79.5698584622288, 43.6448490535255], [-79.5698102179532, 43.6448479038179], [-79.5697497136972, 43.644856672079], [-79.5692202089961, 43.6449668736471]]}"},{"_id":25,"OBJECTID":3925,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-09-01","PROJECT":"Laneway Reconstruction","LOCATION":"[27.40 m W] BAY ST&lt;br&gt; From: TEMPERANCE ST&lt;br&gt; To: RICHMOND ST W ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2025","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Gabor Szakter, Engineering and Construction Services","CONTACT_EMAIL":"gszakte@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3815384546847, 43.6504649376741], [-79.3817994165711, 43.6510645453407]]}"},{"_id":26,"OBJECTID":3940,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Laneway Reconstruction","LOCATION":"[37 m N] WOBURN AVE&lt;br&gt; From: LEDBURY ST&lt;br&gt; To: [43 m W] LEDBURY ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4239127572605, 43.7243788422202], [-79.4244787396344, 43.7242666840196]]}"},{"_id":27,"OBJECTID":3958,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-07-12","PROJECT":"Local Road Rehabilitation","LOCATION":"CARLING AVE&lt;br&gt; From: IRENE AVE&lt;br&gt; To: LEEDS ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2024 - Q2 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Dennis Coronel, Engineering and Construction Services","CONTACT_EMAIL":"dcorone@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4248969649302, 43.6628446316204], [-79.4252099904837, 43.6636456591171], [-79.4254609709207, 43.6643217516281]]}"},{"_id":28,"OBJECTID":4010,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-02-22","PROJECT":"Local Road Rehabilitation","LOCATION":"DOROTHY ST&lt;br&gt; From: HILTZ AVE&lt;br&gt; To: GREENWOOD AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.326923741667, 43.665894202187], [-79.3260210547978, 43.6660953799296]]}"},{"_id":29,"OBJECTID":4023,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-07-12","PROJECT":"Local Road Rehabilitation","LOCATION":"HENNING AVE&lt;br&gt; From: EGLINTON AVE W&lt;br&gt; To: [107 m N] EGLINTON AVE W [END] ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4014521157876, 43.7061002196874], [-79.4018118861901, 43.7071266382737]]}"},{"_id":30,"OBJECTID":4140,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-07-14","PROJECT":"Local Road Reconstruction","LOCATION":"[36.60 m W] PAPE AVE&lt;br&gt; From: DINGWALL AVE&lt;br&gt; To: FRIZZELL AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3432662187502, 43.6735457288467], [-79.3435691388047, 43.674269292031]]}"},{"_id":31,"OBJECTID":4166,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-08-29","PROJECT":"Laneway Reconstruction","LOCATION":"[30.50 m N] WALLACE AVE&lt;br&gt; From: [33.50 m E] EMERSON AVE&lt;br&gt; To: EMERSON AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4425523348517, 43.6631192100523], [-79.4419968763231, 43.6632356139409]]}"},{"_id":32,"OBJECTID":4168,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-09-27","PROJECT":"Laneway Reconstruction","LOCATION":"[28.60 m W] YORK ST&lt;br&gt; From: [52 m S] RICHMOND ST W&lt;br&gt; To: RICHMOND ST W ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3851110950526, 43.6503416018767], [-79.3848953663775, 43.64980495776]]}"},{"_id":33,"OBJECTID":4277,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"MACPHERSON AVE&lt;br&gt; From: MADISON AVE&lt;br&gt; To: SPADINA RD (TO) ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Adrian Viegas, Engineering and Construction Services","CONTACT_EMAIL":"aviegas@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4063298357469, 43.6761221369325], [-79.4066741597226, 43.6760507050471], [-79.4068049027407, 43.676016777722], [-79.4069870353744, 43.6759529176771], [-79.4071208602984, 43.6759146808652], [-79.4073791400346, 43.6758583981421], [-79.4074931331621, 43.675869175016]]}"},{"_id":34,"OBJECTID":4279,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-03-24","PROJECT":"Major Road Reconstruction","LOCATION":"BLOOR ST W&lt;br&gt; From: BEDFORD RD&lt;br&gt; To: DEVONSHIRE PL ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2023 - Q2 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Gabor Szakter, Engineering and Construction Services","CONTACT_EMAIL":"gszakte@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2023","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3973807918684, 43.668033224743], [-79.3983645780234, 43.6678316276818]]}"},{"_id":35,"OBJECTID":4325,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-05-19","PROJECT":"Local Road Reconstruction","LOCATION":"HOPEWELL AVE&lt;br&gt; From: Jimmy Wisdom Way&lt;br&gt; To: DUFFERIN ST ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4485519819516, 43.6993205124111], [-79.4500749112928, 43.6990174843923], [-79.4502373228659, 43.6989758432608], [-79.4503977100484, 43.6989214552011], [-79.4505394822046, 43.6988579765666], [-79.4506672631372, 43.6988203344061], [-79.450925662867, 43.6987636295258], [-79.4513054333962, 43.6986934739017]]}"},{"_id":36,"OBJECTID":5111,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"DANESWOOD RD&lt;br&gt; From: DAWLISH AVE&lt;br&gt; To: GLENALLAN RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3816147983447, 43.7231452442143], [-79.3816913440446, 43.7235596147733], [-79.3817351408656, 43.7236940486788], [-79.3818625936904, 43.7239984765425], [-79.3819177659893, 43.7241363696007]]}"},{"_id":37,"OBJECTID":5118,"PROJ_NUM":" 1","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"CHELTENHAM AVE&lt;br&gt; From: ST IVES CRES&lt;br&gt; To: MILDENHALL RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3896602348663, 43.7256736510194], [-79.3895327515411, 43.7257001265533], [-79.3892730708008, 43.7257582753453], [-79.3866603195922, 43.7263022428091], [-79.3857736588881, 43.7264958679796]]}"},{"_id":38,"OBJECTID":5145,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"ST LEONARDS CRES&lt;br&gt; From: ST LEONARDS AVE&lt;br&gt; To: DAWLISH AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3887718705558, 43.7237594047772], [-79.3887339240501, 43.7237414643698], [-79.3886770056259, 43.7237138561398], [-79.3885830742477, 43.7236669401441], [-79.3884872590048, 43.7236186450425], [-79.3883819558427, 43.7235599891641], [-79.3882425447552, 43.7234751692306], [-79.3881239868574, 43.7233896404375], [-79.3880118369522, 43.7233156753973], [-79.3878695662921, 43.7232141098874], [-79.387661732013, 43.7230827396654], [-79.3875622474411, 43.7230196691332], [-79.3874907328257, 43.7229994809791], [-79.387481491151, 43.7229968615209], [-79.3873757513116, 43.7229736511852]]}"},{"_id":39,"OBJECTID":5208,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"BUCKINGHAM AVE&lt;br&gt; From: ST IVES AVE&lt;br&gt; To: [32.60 m] ST IVES AVE [CITY LIMITS] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3904034001557, 43.7265557765058], [-79.3901317615295, 43.7266286147983], [-79.3898757841263, 43.7266959947802]]}"},{"_id":40,"OBJECTID":5262,"PROJ_NUM":"TS2023-08-230","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Reconstruction","LOCATION":"NEW HAVEN DR&lt;br&gt; From: [49.80 m E] GILGORM RD [END]&lt;br&gt; To: GILGORM RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2024 - Q3 2024","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4174086090252, 43.706130919282], [-79.4179105055736, 43.7060097546394]]}"},{"_id":41,"OBJECTID":5292,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-12","PROJECT":"Major Road Rehabilitation","LOCATION":"DUPONT ST&lt;br&gt; From: MADISON AVE&lt;br&gt; To: [21.30 m E] SPADINA RD (TO) ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2027 - Q3 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Shahid Virk, Engineering and Construction Services","CONTACT_EMAIL":"svirk@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4059769610946, 43.6751085685439], [-79.406863209931, 43.6749142174187]]}"},{"_id":42,"OBJECTID":5297,"PROJ_NUM":"TS2023-13-049","LAST_UPDATED_DATE":"2024-04-25","PROJECT":"Local Road Rehabilitation","LOCATION":"ST PAUL ST&lt;br&gt; From: [E-W] SACKVILLE ST [LEG]&lt;br&gt; To: RAY LANE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2024 - Q4 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Javier Saborio, Engineering and Construction Services","CONTACT_EMAIL":"jsabori@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3601728114032, 43.65555203136], [-79.3601904349407, 43.6556400591316], [-79.3603190377211, 43.6559653901647], [-79.3603520870802, 43.6560522395732], [-79.3603556852797, 43.6560617043887]]}"},{"_id":43,"OBJECTID":5446,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Laneway Reconstruction","LOCATION":"POULTER&apos;S LANE&lt;br&gt; From: MARKHAM ST&lt;br&gt; To: [55.50 m E] MARKHAM ST [CUL-DE-SAC] ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2024 - Q3 2024","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4120663187757, 43.6654395872989], [-79.4120217079474, 43.6654884032296], [-79.4120743341529, 43.6656059291682]]}"},{"_id":44,"OBJECTID":6185,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"JIMMY WISDOM WAY&lt;br&gt; From: WHITMORE AVE&lt;br&gt; To: HOPEWELL AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4482622761439, 43.6985974885059], [-79.4485519819516, 43.6993205124111]]}"},{"_id":45,"OBJECTID":6240,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-08-14","PROJECT":"Major Road Rehabilitation","LOCATION":"GREENWOOD AVE&lt;br&gt; From: SPRINGDALE BLVD&lt;br&gt; To: QUEENSDALE AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Promil Sarkar, Engineering and Construction Services","CONTACT_EMAIL":"psarkar@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.334063761933, 43.6854622175555], [-79.3344095554926, 43.6862689027403]]}"},{"_id":46,"OBJECTID":6365,"PROJ_NUM":"TS2024-10_11-027","LAST_UPDATED_DATE":"2025-03-19","PROJECT":"Major Road Rehabilitation","LOCATION":"[E] UNIVERSITY AVE [BRANCH]&lt;br&gt; From: DUNDAS ST W&lt;br&gt; To: EDWARD ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2027 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Newsha Roshani, Engineering and Construction Services","CONTACT_EMAIL":"nroshan@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3881457916216, 43.6548243888637], [-79.3882868814965, 43.6551417615208], [-79.3884527438773, 43.6555123741572]]}"},{"_id":47,"OBJECTID":6564,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-08-14","PROJECT":"Major Road Rehabilitation","LOCATION":"GREENWOOD AVE&lt;br&gt; From: STRATHMORE BLVD&lt;br&gt; To: GLEBEHOLME BLVD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Promil Sarkar, Engineering and Construction Services","CONTACT_EMAIL":"psarkar@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3327160504071, 43.6822768331387], [-79.333418931461, 43.6839276552859]]}"},{"_id":48,"OBJECTID":6617,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"CARLTON ST&lt;br&gt; From: RAWLINGS AVE&lt;br&gt; To: SUMACH ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Jessica Orjuela, Engineering and Construction Services","CONTACT_EMAIL":"jorjuel@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3632393067794, 43.665539086729], [-79.3625174332228, 43.6656921436639]]}"},{"_id":49,"OBJECTID":6658,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"CARLTON ST&lt;br&gt; From: BROADCAST LANE&lt;br&gt; To: METCALFE ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Jessica Orjuela, Engineering and Construction Services","CONTACT_EMAIL":"jorjuel@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3674857180327, 43.664599388843], [-79.3667013483655, 43.6647860017553]]}"},{"_id":50,"OBJECTID":6659,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Reconstruction","LOCATION":"[S] HIGHLAND AVE [BRANCH]&lt;br&gt; From: HIGHLAND GDNS&lt;br&gt; To: [45.70 m E] HIGHLAND GDNS ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3815816306994, 43.6824393624866], [-79.3814447307685, 43.6824677997424], [-79.3813885925313, 43.6824748885453], [-79.381333456396, 43.6824769736327], [-79.3812753795835, 43.6824733398077], [-79.381220261773, 43.682466135508], [-79.3811484152677, 43.6824510556462], [-79.381060809161, 43.6824335649941]]}"},{"_id":51,"OBJECTID":6670,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Reconstruction","LOCATION":"HIGHLAND AVE&lt;br&gt; From: [289.60 m E] HIGHLAND GDNS&lt;br&gt; To: ROXBOROUGH DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3785435132965, 43.6817156199135], [-79.3776022587117, 43.681900321977], [-79.3775600049071, 43.681904777381], [-79.3771063514825, 43.681989803011]]}"},{"_id":52,"OBJECTID":6675,"PROJ_NUM":"TS2023-24-430","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Major Road Reconstruction","LOCATION":"SCARBOROUGH GOLF CLUB RD&lt;br&gt; From: BRIMORTON DR&lt;br&gt; To: ELLESMERE RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2025 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Mehrshad Rahimi, Engineering and Construction Services","CONTACT_EMAIL":"mrahimi@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2186842194236, 43.7698112486013], [-79.2194785911463, 43.7717858786051], [-79.2200726425321, 43.7732636699038], [-79.2206551360403, 43.7747141379738], [-79.2210528104115, 43.7756809876262], [-79.2214293877347, 43.776605838924], [-79.2214704721378, 43.7766988849992], [-79.2222172150957, 43.7785568936147]]}"},{"_id":53,"OBJECTID":6677,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Rehabilitation","LOCATION":"WINONA DR&lt;br&gt; From: [W] GLOUCESTER GRV [BRANCH]&lt;br&gt; To: [E] GLOUCESTER GRV [BRANCH] ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Cherry Chen, Engineering and Construction Services","CONTACT_EMAIL":"cchen9@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4383663261139, 43.6964500228049], [-79.4384007831452, 43.6965537542208]]}"},{"_id":54,"OBJECTID":6689,"PROJ_NUM":"TS2023-08-414","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Local Road Rehabilitation","LOCATION":"ORIOLE PKWY&lt;br&gt; From: ELWOOD BLVD&lt;br&gt; To: ROSELAWN AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4072101067263, 43.7074777687889], [-79.407275975189, 43.7077883570623], [-79.4073372688808, 43.7080404423215], [-79.4074163524951, 43.7083195367536], [-79.407481149389, 43.7085536222121], [-79.4075478534244, 43.708814712972], [-79.4076250544965, 43.7090442987254], [-79.4076714141013, 43.7091568520302]]}"},{"_id":55,"OBJECTID":6714,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"CARLTON ST&lt;br&gt; From: METCALFE ST&lt;br&gt; To: DERMOTT PL ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Jessica Orjuela, Engineering and Construction Services","CONTACT_EMAIL":"jorjuel@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3667013483655, 43.6647860017553], [-79.3665810047291, 43.6648000744724]]}"},{"_id":56,"OBJECTID":6776,"PROJ_NUM":"TS2023-13-044","LAST_UPDATED_DATE":"2025-03-24","PROJECT":"Local Road Reconstruction","LOCATION":"SACKVILLE PL&lt;br&gt; From: BOWMAN ST&lt;br&gt; To: RAWLINGS AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2025 - Q3 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Newsha Roshani, Engineering and Construction Services","CONTACT_EMAIL":"nroshan@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3641587818997, 43.6660933151454], [-79.3635261310157, 43.6662363399215]]}"},{"_id":57,"OBJECTID":7659,"PROJ_NUM":"TS2023-11-145","LAST_UPDATED_DATE":"2026-07-14","PROJECT":"Local Road Reconstruction","LOCATION":"CLIFTON RD&lt;br&gt; From: [73 m S] GLENROSE AVE [END]&lt;br&gt; To: GLENROSE AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Hazel Breton, Engineering and Construction Services","CONTACT_EMAIL":"hbreton@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.383481848753, 43.688549726741], [-79.3835885031877, 43.6885746879966], [-79.383651213714, 43.6885971380767], [-79.3836898413836, 43.6886162331393], [-79.3837153778152, 43.6886441271447], [-79.3837418307788, 43.6886920229647], [-79.3838774970561, 43.6889819036982], [-79.3839793741641, 43.6892205415758]]}"},{"_id":58,"OBJECTID":7718,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-02","PROJECT":"Local Road Reconstruction","LOCATION":"DOVER AVE&lt;br&gt; From: BROWNS LINE&lt;br&gt; To: LLOYD GEORGE AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Nicholas Mah, Engineering and Construction Services","CONTACT_EMAIL":"nmah@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5425606012546, 43.5957686217531], [-79.5429486563024, 43.595678426149], [-79.5430568533247, 43.5956595274185], [-79.5445517076927, 43.5953195100556]]}"},{"_id":59,"OBJECTID":7722,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-11","PROJECT":"Laneway Reconstruction","LOCATION":"Alan Borovoy Lane&lt;br&gt; From: [39.3 m E] GRACE ST (TO)&lt;br&gt; To: JERSEY AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adrian Viegas, Engineering and Construction Services","CONTACT_EMAIL":"aviegas@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4152006202104, 43.6554195698455], [-79.4164095679113, 43.6585765587381], [-79.4163697556904, 43.658595495459]]}"},{"_id":60,"OBJECTID":7781,"PROJ_NUM":"TS2024-02-033","LAST_UPDATED_DATE":"2026-01-14","PROJECT":"Major Road Reconstruction","LOCATION":"RATHBURN RD&lt;br&gt; From: ELMCREST RD&lt;br&gt; To: MILL RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Brian Nolan, Engineering and Construction Services","CONTACT_EMAIL":"bnolan3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5868317875613, 43.6475271106999], [-79.5874367619522, 43.6471609060871], [-79.5874991555519, 43.6471217204081], [-79.5894788287678, 43.6458786024529], [-79.5900293973818, 43.6455330847288], [-79.5900630194625, 43.6455117700085]]}"},{"_id":61,"OBJECTID":7815,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2026-03-11","PROJECT":"Local Road Reconstruction","LOCATION":"BRAESIDE CRES&lt;br&gt; From: BRAESIDE RD&lt;br&gt; To: [1 m E] BRAESIDE RD [CITY LIMITS] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3905438770258, 43.7291351168728], [-79.3904295300146, 43.7291558091729]]}"},{"_id":62,"OBJECTID":7839,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Laneway Reconstruction","LOCATION":"[43.30 m N] DUNDAS ST W&lt;br&gt; From: HURON ST&lt;br&gt; To: [79.20 m W] HURON ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3963577254249, 43.6538134548248], [-79.397450075485, 43.6535784964466]]}"},{"_id":63,"OBJECTID":7955,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Laneway Reconstruction","LOCATION":"[34 m N] FLORENCE AVE&lt;br&gt; From: [54 m E] EILEEN AVE&lt;br&gt; To: EILEEN AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2027 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4949862032113, 43.669597367554], [-79.4946385497765, 43.6699354237542], [-79.4945038551906, 43.6700663867132]]}"},{"_id":64,"OBJECTID":7957,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Local Road Reconstruction","LOCATION":"WEST HILL DR&lt;br&gt; From: LAWRENCE AVE E&lt;br&gt; To: KINGSTON RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2027 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.1798927836686, 43.7698408565419], [-79.1809212501835, 43.7722488434674], [-79.1816823570359, 43.774018334711], [-79.1817310031122, 43.7741562779365], [-79.181742446584, 43.7742377432909], [-79.181755967497, 43.7743163160543]]}"},{"_id":65,"OBJECTID":8091,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-19","PROJECT":"Local Road Reconstruction","LOCATION":"RIDELLE AVE&lt;br&gt; From: BURMONT RD&lt;br&gt; To: OLD PARK RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4318104813828, 43.7060823778297], [-79.4329630666137, 43.7058561014957]]}"},{"_id":66,"OBJECTID":8168,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-11","PROJECT":"Laneway Reconstruction","LOCATION":"LEADER LANE&lt;br&gt; From: COLBORNE ST&lt;br&gt; To: KING ST E ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3754504279513, 43.6489765546027], [-79.3755293619994, 43.649171232027], [-79.3755633085676, 43.6492526322964], [-79.3757196322858, 43.6496404279949]]}"},{"_id":67,"OBJECTID":8188,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-07-14","PROJECT":"Laneway Reconstruction","LOCATION":"[33.50 m W] DUFFERIN ST&lt;br&gt; From: WALLACE AVE&lt;br&gt; To: ARMSTRONG AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4375930489394, 43.6637435715708], [-79.4377521932244, 43.6641522741532], [-79.4379324125262, 43.6646151669866]]}"},{"_id":68,"OBJECTID":8421,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-19","PROJECT":"Local Road Reconstruction","LOCATION":"RIDELLE AVE&lt;br&gt; From: OVERDALE RD&lt;br&gt; To: MARWOOD RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4340824128994, 43.705597533802], [-79.4352586991205, 43.705352876365]]}"},{"_id":69,"OBJECTID":8440,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-19","PROJECT":"Local Road Reconstruction","LOCATION":"RIDELLE AVE&lt;br&gt; From: OLD PARK RD&lt;br&gt; To: OVERDALE RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4329630666137, 43.7058561014957], [-79.4340824128994, 43.705597533802]]}"},{"_id":70,"OBJECTID":8441,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-19","PROJECT":"Local Road Reconstruction","LOCATION":"RIDELLE AVE&lt;br&gt; From: MARWOOD RD&lt;br&gt; To: FERNWOOD RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4352586991205, 43.705352876365], [-79.4364077221742, 43.7051021787966]]}"},{"_id":71,"OBJECTID":8470,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-07-12","PROJECT":"Local Road Rehabilitation","LOCATION":"RAMPART RD&lt;br&gt; From: MARTIN GROVE RD&lt;br&gt; To: [105 m E] MARTIN GROVE RD [CUL-DE-SAC] ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2024 - Q4 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5903711963217, 43.7340113037318], [-79.5899604928695, 43.7341152948613], [-79.5891731945518, 43.7343146319075], [-79.5891327342896, 43.7343373645631], [-79.5890449793373, 43.7343866786798]]}"},{"_id":72,"OBJECTID":8479,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-07-30","PROJECT":"Laneway Rehabilitation","LOCATION":"[84.40 m W] CHRISTIE ST&lt;br&gt; From: [39 m N] TYRREL AVE&lt;br&gt; To: ILFORD RD ","DETAILS":"Replacement of partial or entire laneway pavement structure for either partial or full laneway width. This could include the asphalt, concrete and underlying support materials. Repair, improvement or replacement of laneway drainage, curbs and associated areas. Work may include the closure of individual lanes or the entire laneway.","DURATION/ Construction Timeline":"Q4 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4255867536006, 43.678411215879], [-79.4257995807273, 43.678881537981]]}"},{"_id":73,"OBJECTID":8489,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"ENDWOOD RD&lt;br&gt; From: HERNSHAW CRES&lt;br&gt; To: CARSBROOKE RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Completed","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5744847640319, 43.6473063416176], [-79.5750229731508, 43.6471893769751], [-79.5751702051006, 43.6471444264485], [-79.5752968173529, 43.6471052861951], [-79.5754251607403, 43.6470430381521], [-79.5755554509572, 43.6469815447924], [-79.5756538246005, 43.6469224217669], [-79.5757335629652, 43.6468698549968], [-79.5758793483591, 43.6467403006679]]}"},{"_id":74,"OBJECTID":8525,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-06-30","PROJECT":"Local Road Reconstruction","LOCATION":"TOFFEE CRT&lt;br&gt; From: NEW TORONTO ST&lt;br&gt; To: [128 m S] NEW TORONTO ST [CUL-DE-SAC] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Amran Durrani, Engineering and Construction Services","CONTACT_EMAIL":"adurran2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5071503852705, 43.605371828385], [-79.5076735613341, 43.6065277763077]]}"},{"_id":75,"OBJECTID":8530,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-07-12","PROJECT":"Local Road Rehabilitation","LOCATION":"CARLING AVE&lt;br&gt; From: BLOOR ST W&lt;br&gt; To: IRENE AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2024 - Q2 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Dennis Coronel, Engineering and Construction Services","CONTACT_EMAIL":"dcorone@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4246453518478, 43.6621985657573], [-79.4248081618785, 43.6626166142716], [-79.4248969649302, 43.6628446316204]]}"},{"_id":76,"OBJECTID":8626,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"CASTLEFIELD AVE&lt;br&gt; From: YONGE ST&lt;br&gt; To: DUPLEX AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3994765853598, 43.7118389681081], [-79.3999992591552, 43.7117357590166], [-79.4012583561257, 43.7114871495535]]}"},{"_id":77,"OBJECTID":8643,"PROJ_NUM":"TS2023-09-011","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"ASCOT AVE&lt;br&gt; From: DUFFERIN ST&lt;br&gt; To: ST CLAIR GDNS ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Adrian Viegas, Engineering and Construction Services","CONTACT_EMAIL":"aviegas@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4439547809527, 43.6801495447553], [-79.4454150086383, 43.679822891565], [-79.4459694918064, 43.6796988558402]]}"},{"_id":78,"OBJECTID":8887,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"MACPHERSON AVE&lt;br&gt; From: [15.20 m W] DAVENPORT RD&lt;br&gt; To: HURON ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Adrian Viegas, Engineering and Construction Services","CONTACT_EMAIL":"aviegas@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4040959591214, 43.6765933129411], [-79.4051682329097, 43.6763638637588]]}"},{"_id":79,"OBJECTID":8890,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"CORTLEIGH BLVD&lt;br&gt; From: AVENUE RD&lt;br&gt; To: MONA DR ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4117758992924, 43.7130486490807], [-79.4135913428226, 43.7126674822445], [-79.4156786708608, 43.7122280062308], [-79.4162892463394, 43.7120934360664]]}"},{"_id":80,"OBJECTID":8901,"PROJ_NUM":"TS2023-09-011","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"ASCOT AVE&lt;br&gt; From: ST CLAIR GDNS&lt;br&gt; To: BOON AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Adrian Viegas, Engineering and Construction Services","CONTACT_EMAIL":"aviegas@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4459694918064, 43.6796988558402], [-79.446508364338, 43.6795814980961], [-79.4471291691785, 43.6794463081232]]}"},{"_id":81,"OBJECTID":8902,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"BRIDGMAN AVE&lt;br&gt; From: DARTNELL AVE&lt;br&gt; To: [15 m W] DARTNELL AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Adrian Viegas, Engineering and Construction Services","CONTACT_EMAIL":"aviegas@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4115365800885, 43.6750145947858], [-79.4117988868482, 43.6749637149778]]}"},{"_id":82,"OBJECTID":9008,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"MACPHERSON AVE&lt;br&gt; From: WALMER RD&lt;br&gt; To: KENDAL AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Adrian Viegas, Engineering and Construction Services","CONTACT_EMAIL":"aviegas@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4086770688533, 43.6756331312206], [-79.4092068145149, 43.6755228459601], [-79.4095428699455, 43.675452857072], [-79.4096177186593, 43.6754334014128], [-79.4096551328811, 43.67542628394], [-79.409678105805, 43.6754229716053], [-79.4097122214199, 43.6754239526964]]}"},{"_id":83,"OBJECTID":9172,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-05","PROJECT":"Local Road Rehabilitation","LOCATION":"FORD ST&lt;br&gt; From: CONNOLLY ST&lt;br&gt; To: ST CLAIR AVE W ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q4 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Matthew McAinsh, Engineering and Construction Services","CONTACT_EMAIL":"mmcains@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.461764733777, 43.6718978806116], [-79.4625167888972, 43.6736548284331]]}"},{"_id":84,"OBJECTID":9561,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-16","PROJECT":"Local Road Rehabilitation","LOCATION":"SEATON ST&lt;br&gt; From: GERRARD ST E&lt;br&gt; To: CARLTON ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Angela Au, Engineering and Construction Services","CONTACT_EMAIL":"aau2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3707022076572, 43.66156440883], [-79.3708667412278, 43.6619573863827], [-79.3708772636857, 43.6619825030113], [-79.3713166724287, 43.6630318617638], [-79.3713360896058, 43.6630782585248], [-79.3715181245111, 43.6635129849435]]}"},{"_id":85,"OBJECTID":9580,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-12-06","PROJECT":"Local Road Rehabilitation","LOCATION":"SNOOKER ST&lt;br&gt; From: HANNA AVE&lt;br&gt; To: ATLANTIC AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.421012790974, 43.6394728638148], [-79.4205072927907, 43.6395829333292], [-79.4201913818388, 43.639651717781], [-79.4201884569909, 43.6396515537142], [-79.4200008357756, 43.639685636808]]}"},{"_id":86,"OBJECTID":9602,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"STRATHEDEN RD&lt;br&gt; From: MILDENHALL RD&lt;br&gt; To: DANESWOOD RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3838624742361, 43.7217214375686], [-79.3814786554225, 43.7222201350774]]}"},{"_id":87,"OBJECTID":9621,"PROJ_NUM":"TS2023-13-001","LAST_UPDATED_DATE":"2024-04-25","PROJECT":"Major Road Reconstruction","LOCATION":"GERRARD ST E&lt;br&gt; From: SEATON ST&lt;br&gt; To: ONTARIO ST ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2027 - Q1 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marilia Cimini, Engineering and Construction Services","CONTACT_EMAIL":"mcimini@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3707022076572, 43.66156440883], [-79.369717270556, 43.6617810420143]]}"},{"_id":88,"OBJECTID":9627,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-05","PROJECT":"Laneway Reconstruction","LOCATION":"[38.10 m N] BLOOR ST W&lt;br&gt; From: DORVAL RD&lt;br&gt; To: INDIAN RD ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2024 - Q3 2025","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Amran Durrani, Engineering and Construction Services","CONTACT_EMAIL":"adurran2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4544593664064, 43.6563821692756], [-79.4569734038607, 43.6558233040778]]}"},{"_id":89,"OBJECTID":9636,"PROJ_NUM":"TS2024-07-026","LAST_UPDATED_DATE":"2024-04-25","PROJECT":"Major Road Rehabilitation","LOCATION":"YORK GATE BLVD&lt;br&gt; From: FINCH AVE (N YK)&lt;br&gt; To: [90 m S] HULLMAR DR ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q4 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Tazeen Fatema, Engineering and Construction Services","CONTACT_EMAIL":"tfatema@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5207024203373, 43.756732130905], [-79.5214560787221, 43.7582764974333], [-79.5214689045848, 43.758303507598], [-79.5214813330506, 43.7583304998336], [-79.5214933765473, 43.7583575011413], [-79.5215042526885, 43.7583845116684], [-79.521514357253, 43.758407003742], [-79.5215236702495, 43.7584385061552], [-79.5215322224784, 43.7584610075205], [-79.521539993941, 43.7584880096273], [-79.5215469970569, 43.7585195124736], [-79.5215532145609, 43.758542014277], [-79.5215586529131, 43.7585735174173], [-79.5215637046697, 43.7586005200349], [-79.5215672040715, 43.7586275229452], [-79.5215707283142, 43.7586545258505], [-79.5215726753615, 43.7586815290533], [-79.5215742374248, 43.7587085323286], [-79.5215746321132, 43.7587355358241], [-79.521574655852, 43.7587670399844], [-79.5215738691275, 43.7587895431077], [-79.5215723405014, 43.7588210475607], [-79.521570027865, 43.7588480515667], [-79.5215665354284, 43.758875055795], [-79.5215622730214, 43.7589020781708], [-79.5215576256106, 43.7589290646141], [-79.5215522098462, 43.7589605788004], [-79.5215456234616, 43.7589830830162], [-79.5215382687114, 43.7590100879711], [-79.5215301315601, 43.7590370930727], [-79.5215215969946, 43.7590640982485], [-79.5215022006568, 43.7591046072515], [-79.5214816477205, 43.7591406248748], [-79.5214606973454, 43.7591766245665], [-79.5214389769707, 43.7592126333997], [-79.5214161016058, 43.7592486514461], [-79.5213928271984, 43.7592801599667], [-79.5213687719734, 43.7593161782241], [-79.5213439467367, 43.7593521876188], [-79.5213179648992, 43.7593836876279], [-79.5212915748053, 43.7594196973027], [-79.5212640421274, 43.7594557071837], [-79.5212361104182, 43.7594872255388], [-79.5212073962757, 43.7595187350309], [-79.5211779137085, 43.7595547452523], [-79.5211476719571, 43.759586255012], [-79.521116635356, 43.7596177739116], [-79.5210961647338, 43.7596418018641], [-79.5210859852883, 43.7596537753232], [-79.5210561160116, 43.7596852849895], [-79.5210274141022, 43.7597168034341], [-79.520999098726, 43.7597528133935], [-79.5209715533009, 43.7597888232043], [-79.5209443928356, 43.7598248329376], [-79.5209184105871, 43.7598563418546], [-79.5208928024515, 43.7598923512912], [-79.5208679766913, 43.759928360579], [-79.5208439333079, 43.7599643697185], [-79.520836460855, 43.7599755415553], [-79.5208198774765, 43.7600003788549], [-79.5208039499327, 43.760018384131], [-79.5207888311836, 43.7600408898518], [-79.5207740834411, 43.760058894909], [-79.5207605030923, 43.7600768997522], [-79.5207473356785, 43.7601039057066], [-79.5207349227148, 43.7601219103348], [-79.5207236662847, 43.7601444243469], [-79.5207128072572, 43.7601669292846], [-79.5207027290792, 43.7601849334859], [-79.5206934100177, 43.7602074381427], [-79.5206852831929, 43.7602299425828], [-79.5206775304916, 43.7602569565496], [-79.5206705446696, 43.7602749511871], [-79.5206647278023, 43.7602974552078], [-79.5206592959266, 43.7603199591585], [-79.5206550438768, 43.7603424718967], [-79.5206515493909, 43.7603649664956], [-79.5206484538689, 43.760391970617], [-79.5206465366249, 43.7604144739317], [-79.5206453769537, 43.7604369771095], [-79.520645243208, 43.760445312233], [-79.5206700571445, 43.7605543211263], [-79.5206867284808, 43.7606399644048]]}"},{"_id":90,"OBJECTID":9645,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"CHELTENHAM AVE&lt;br&gt; From: ST IVES AVE&lt;br&gt; To: [20.30 m E] ST IVES AVE [CITY LIMITS] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3900333592237, 43.725609705729], [-79.3898172073601, 43.7256413709687], [-79.3896602348663, 43.7256736510194]]}"},{"_id":91,"OBJECTID":9665,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-12","PROJECT":"Major Road Rehabilitation","LOCATION":"DUPONT ST&lt;br&gt; From: ST GEORGE ST (TO)&lt;br&gt; To: HURON ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2027 - Q3 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Shahid Virk, Engineering and Construction Services","CONTACT_EMAIL":"svirk@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4036003140794, 43.6755947756571], [-79.4041738533477, 43.6754803470269], [-79.4047887879525, 43.6753576507846]]}"},{"_id":92,"OBJECTID":9673,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-12","PROJECT":"Major Road Rehabilitation","LOCATION":"DUPONT ST&lt;br&gt; From: HURON ST&lt;br&gt; To: MADISON AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2027 - Q3 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Shahid Virk, Engineering and Construction Services","CONTACT_EMAIL":"svirk@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4047887879525, 43.6753576507846], [-79.4059769610946, 43.6751085685439]]}"},{"_id":93,"OBJECTID":9685,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"ROTHMERE DR&lt;br&gt; From: BRAESIDE RD&lt;br&gt; To: MILDENHALL RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3902974325337, 43.728442046429], [-79.3902137740732, 43.7284405619134], [-79.3886777086639, 43.7287698536664], [-79.3885095242974, 43.7288058117051], [-79.3883398247123, 43.7288421280654], [-79.3881624247943, 43.7288873928696], [-79.3879871415136, 43.7289490237201], [-79.3878278974914, 43.7290094008682], [-79.3868903124324, 43.7293062828007]]}"},{"_id":94,"OBJECTID":9697,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-12","PROJECT":"Major Road Rehabilitation","LOCATION":"KEELE ST&lt;br&gt; From: FINCH AVE W&lt;br&gt; To: STEELES AVE W ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2028 - Q4 2029","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Adel Roufail, Engineering and Construction Services","CONTACT_EMAIL":"aroufai@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4910534106917, 43.7635021618319], [-79.4916590072426, 43.7657154539496], [-79.4917365780998, 43.7660340923094], [-79.4918108229598, 43.76633904857], [-79.4920120363848, 43.7671656499246], [-79.4920222654122, 43.7672076501293], [-79.492047900111, 43.7673129206751], [-79.493239882162, 43.7719900697569], [-79.4939610215053, 43.7748195549116], [-79.4940388244767, 43.77516887618], [-79.4940486709766, 43.7752130724083], [-79.4940587288638, 43.7752553153938], [-79.4945741214528, 43.7774193374244], [-79.4946234878624, 43.7775764820146], [-79.494644673321, 43.7776642533217], [-79.4946494140464, 43.7777179724668], [-79.4946566120021, 43.7777997663438], [-79.4946727146158, 43.7779103103387], [-79.494673539604, 43.7779930400352], [-79.4946836080556, 43.7780664809643], [-79.4946870671965, 43.7781438190865], [-79.4946807377352, 43.7782137307961], [-79.4946841951784, 43.778310286391], [-79.4946792674925, 43.7784027370656], [-79.4946799162283, 43.7785119301534], [-79.4946774356893, 43.7786062171749], [-79.4946752401325, 43.7787088392807], [-79.4946483309748, 43.7788578882043], [-79.4945988005041, 43.7789927862305], [-79.4945677570928, 43.7791091067226], [-79.4945386905206, 43.7792069659241], [-79.49451858256, 43.7792871832778], [-79.4944932934262, 43.7793745742997], [-79.4944589457507, 43.7794832346104], [-79.4944443892125, 43.7795802213718], [-79.4944246656825, 43.7796651553286], [-79.4944073020011, 43.779755589103], [-79.4943710517996, 43.779879083193], [-79.4943572643785, 43.7799855211886], [-79.4943428945869, 43.7800752620069], [-79.4943343861934, 43.7801901253394], [-79.4943094544153, 43.7803014774016], [-79.4943066133911, 43.7803910297595], [-79.494303645952, 43.7805034630471], [-79.494314355508, 43.7806284176209], [-79.4943282711087, 43.7807454513334], [-79.4943429597538, 43.7808334833586], [-79.4943600083897, 43.7809269972003], [-79.4943742215297, 43.7810523839874], [-79.4944003842973, 43.7811979159398], [-79.4944274198736, 43.7813108097397], [-79.4944517339498, 43.7814327315563], [-79.4945063595238, 43.7815790749568]]}"},{"_id":95,"OBJECTID":9801,"PROJ_NUM":"TS2023-04-223","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Rehabilitation","LOCATION":"MARGDON RD&lt;br&gt; From: KENNEDY PARK RD&lt;br&gt; To: GLENDONWYNNE RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4732038824349, 43.6527118116551], [-79.4732867761136, 43.6526117989681], [-79.4733498884419, 43.6525856737559], [-79.4734186867408, 43.6525690642662], [-79.4743810547998, 43.652361793689]]}"},{"_id":96,"OBJECTID":9802,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Laneway Reconstruction","LOCATION":"[23.20 m N] QUEEN ST E&lt;br&gt; From: JONES AVE&lt;br&gt; To: [30.50 m E] JONES AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2023 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Jessica Orjuela, Engineering and Construction Services","CONTACT_EMAIL":"jorjuel@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2023","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3329504401, 43.662990911481], [-79.3324316797541, 43.6631086278506]]}"},{"_id":97,"OBJECTID":9832,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Laneway Reconstruction","LOCATION":"[30.50 m E] JONES AVE&lt;br&gt; From: [23.20 m N] QUEEN ST E&lt;br&gt; To: [115.10 m N] QUEEN ST E ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2023 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Jessica Orjuela, Engineering and Construction Services","CONTACT_EMAIL":"jorjuel@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2023","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3324316797541, 43.6631086278506], [-79.332737304553, 43.6638731180819]]}"},{"_id":98,"OBJECTID":9834,"PROJ_NUM":"TS2023-12-009","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Rehabilitation","LOCATION":"ARCHER RD&lt;br&gt; From: DUNLOE RD&lt;br&gt; To: BROWSIDE AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2024 - Q3 2024","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4139535117975, 43.6965057499073], [-79.4150224213017, 43.6962829755516]]}"},{"_id":99,"OBJECTID":9896,"PROJ_NUM":"TS2023-13-001","LAST_UPDATED_DATE":"2024-04-25","PROJECT":"Major Road Reconstruction","LOCATION":"GERRARD ST E&lt;br&gt; From: ONTARIO ST&lt;br&gt; To: BERKELEY ST ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2027 - Q1 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marilia Cimini, Engineering and Construction Services","CONTACT_EMAIL":"mcimini@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.369717270556, 43.6617810420143], [-79.3685391004844, 43.6620435135146]]}"},{"_id":100,"OBJECTID":9950,"PROJ_NUM":"TS2023-11-029","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Rehabilitation","LOCATION":"HERRICK ST&lt;br&gt; From: MARKHAM ST&lt;br&gt; To: PALMERSTON BLVD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2024 - Q3 2024","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4114576674163, 43.6624292946305], [-79.4126645565832, 43.6621692831635]]}"}], "fields": [{"id": "_id", "type": "int"}, {"id": "OBJECTID", "type": "int4", "info": {"notes": "Unique row identifier"}}, {"id": "PROJ_NUM", "type": "text", "info": {"notes": ""}}, {"id": "LAST_UPDATED_DATE", "type": "date", "info": {"notes": "The most recent date on which the project information was revised or updated"}}, {"id": "PROJECT", "type": "text", "info": {"notes": "Road Construction"}}, {"id": "LOCATION", "type": "text", "info": {"notes": "The name, beginning and end of the street where the road reconstruction project is located"}}, {"id": "DETAILS", "type": "text", "info": {"notes": "Project scope summary"}}, {"id": "DURATION/ Construction Timeline", "type": "text", "info": {"notes": "The year in which the project begins and ends"}}, {"id": "STATUS", "type": "text", "info": {"notes": "The status of the project"}}, {"id": "INV_PRIORITY", "type": "text", "info": {"notes": ""}}, {"id": "OWNER", "type": "text", "info": {"notes": "Owner of all road reconstruction projects is Transportation Services"}}, {"id": "CONTACT_NAME", "type": "text", "info": {"notes": "Contact person information"}}, {"id": "CONTACT_EMAIL", "type": "text", "info": {"notes": "Contact email address"}}, {"id": "INV_WEB_SITE", "type": "text", "info": {"notes": ""}}, {"id": "INV_DISPLAY_PROGRAM", "type": "text", "info": {"notes": ""}}, {"id": "INV_DISPLAY_SYMBOL", "type": "text", "info": {"notes": ""}}, {"id": "START_YEAR", "type": "text", "info": {"notes": "The year in which the project begins"}}, {"id": "CONTR_NUMBER", "type": "text", "info": {"notes": ""}}, {"id": "geometry", "type": "text", "info": {"notes": ""}}], "_links": {"start": "/api/action/datastore_search?resource_id=40d94b5a-cbf2-4e04-8d48-24038d163d0c", "next": "/api/action/datastore_search?resource_id=40d94b5a-cbf2-4e04-8d48-24038d163d0c&offset=100"}, "total": 335, "total_was_estimated": false}}