{"help": "https://ckan0.cf.opendata.inter.prod-toronto.ca/ca/api/3/action/help_show?name=datastore_search", "success": true, "result": {"include_total": true, "limit": 100, "records_format": "objects", "resource_id": "40d94b5a-cbf2-4e04-8d48-24038d163d0c", "total_estimation_threshold": null, "records": [{"_id":1,"OBJECTID":91,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Rehabilitation","LOCATION":"WINONA DR&lt;br&gt; From: BELVIDERE AVE&lt;br&gt; To: BUDE ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Cherry Chen, Engineering and Construction Services","CONTACT_EMAIL":"cchen9@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4372030869412, 43.6935452718115], [-79.4377070698746, 43.6947908537938]]}"},{"_id":2,"OBJECTID":156,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"CARLTON ST&lt;br&gt; From: RAWLINGS AVE&lt;br&gt; To: SUMACH ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Jessica Orjuela, Engineering and Construction Services","CONTACT_EMAIL":"jorjuel@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3632393117332, 43.6655390894353], [-79.3625174394227, 43.6656921436714]]}"},{"_id":3,"OBJECTID":236,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Rehabilitation","LOCATION":"WINONA DR&lt;br&gt; From: LANARK AVE&lt;br&gt; To: EGLINTON AVE W ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Cherry Chen, Engineering and Construction Services","CONTACT_EMAIL":"cchen9@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.438721019606, 43.6972723920108], [-79.4388960372676, 43.6977113929368], [-79.439054621064, 43.6981091760147]]}"},{"_id":4,"OBJECTID":249,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Rehabilitation","LOCATION":"WINONA DR&lt;br&gt; From: [E] GLOUCESTER GRV [BRANCH]&lt;br&gt; To: LANARK AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Cherry Chen, Engineering and Construction Services","CONTACT_EMAIL":"cchen9@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4384007794188, 43.6965537587194], [-79.438721019606, 43.6972723920108]]}"},{"_id":5,"OBJECTID":267,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Rehabilitation","LOCATION":"WINONA DR&lt;br&gt; From: BUDE ST&lt;br&gt; To: AVA RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Cherry Chen, Engineering and Construction Services","CONTACT_EMAIL":"cchen9@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4377070698746, 43.6947908537938], [-79.4378210729329, 43.6951081285457]]}"},{"_id":6,"OBJECTID":436,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Laneway Reconstruction","LOCATION":"[36 m W] HOPEDALE AVE&lt;br&gt; From: [81 m N] O&apos;CONNOR DR&lt;br&gt; To: [171 m N] O&apos;CONNOR DR ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3531025231468, 43.6935649128476], [-79.3536153141476, 43.6942004911605]]}"},{"_id":7,"OBJECTID":446,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"CARLTON ST&lt;br&gt; From: WOODSTOCK PL&lt;br&gt; To: BOWMAN ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Jessica Orjuela, Engineering and Construction Services","CONTACT_EMAIL":"jorjuel@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3645021590854, 43.6652537495124], [-79.3644791353327, 43.6652587809706], [-79.3644459028372, 43.6652660785571], [-79.3638396631037, 43.6654072533266]]}"},{"_id":8,"OBJECTID":447,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Reconstruction","LOCATION":"[S] HIGHLAND AVE [BRANCH]&lt;br&gt; From: HIGHLAND GDNS&lt;br&gt; To: [45.70 m E] HIGHLAND GDNS ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3815816319326, 43.6824393660884], [-79.3814447258037, 43.6824678015376], [-79.3813885925331, 43.6824748876452], [-79.3813334539154, 43.6824769736302], [-79.3812753746204, 43.6824733407027], [-79.3812202555661, 43.682466138202], [-79.38114841278, 43.6824510592442], [-79.3810608091521, 43.6824335694948]]}"},{"_id":9,"OBJECTID":478,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"CARLTON ST&lt;br&gt; From: METCALFE ST&lt;br&gt; To: DERMOTT PL ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Jessica Orjuela, Engineering and Construction Services","CONTACT_EMAIL":"jorjuel@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3667013421698, 43.6647859999478], [-79.3665810096809, 43.6648000780788]]}"},{"_id":10,"OBJECTID":481,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"COPPERFIELD RD&lt;br&gt; From: MANSE RD&lt;br&gt; To: [550 m E] MANSE RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.1717492025288, 43.7598266941598], [-79.1702954453143, 43.7601015590377], [-79.1690864585156, 43.7603231135549], [-79.1678579659028, 43.760562608152], [-79.1666351880858, 43.7607481018212], [-79.1658636208942, 43.7608898883774], [-79.1645153888148, 43.7611559833378], [-79.1640918001094, 43.7612537575918], [-79.1640467301174, 43.761262627204], [-79.1636322775794, 43.761340768032], [-79.1634380173713, 43.7613774097402], [-79.1632032854737, 43.761420288499], [-79.1627937603589, 43.7614963813335], [-79.1627117981359, 43.7615107502041], [-79.1625852313278, 43.7615193796121], [-79.1624423592323, 43.7615279616256], [-79.1624092435622, 43.7615264875376], [-79.1621883602568, 43.7615166645084]]}"},{"_id":11,"OBJECTID":486,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Laneway Reconstruction","LOCATION":"[195.70 m N] DAVENPORT RD&lt;br&gt; From: ST CLARENS AVE&lt;br&gt; To: [36.10 m W] ST CLARENS AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4481827185954, 43.6734808102383], [-79.4487804363014, 43.6733499753259]]}"},{"_id":12,"OBJECTID":639,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Laneway Reconstruction","LOCATION":"[79 m N] O&apos;CONNOR DR&lt;br&gt; From: HOPEDALE AVE&lt;br&gt; To: [35 m W] HOPEDALE AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3525191549885, 43.6936711609227], [-79.3531025231468, 43.6935649128476]]}"},{"_id":13,"OBJECTID":1568,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Laneway Reconstruction","LOCATION":"[40 m S] ST CLAIR AVE W&lt;br&gt; From: [39 m E] LANSDOWNE AVE (TO)&lt;br&gt; To: LANSDOWNE AVE (TO) ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4503959602035, 43.6758632648315], [-79.4499284342664, 43.6759758574483]]}"},{"_id":14,"OBJECTID":2152,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-11-17","PROJECT":"Local Road Rehabilitation","LOCATION":"WALES AVE&lt;br&gt; From: AUGUSTA AVE&lt;br&gt; To: DENISON AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4015688258877, 43.6533468153691], [-79.4026878065616, 43.6531114634911]]}"},{"_id":15,"OBJECTID":2510,"PROJ_NUM":"TS2024-02-033","LAST_UPDATED_DATE":"2026-01-14","PROJECT":"Major Road Reconstruction","LOCATION":"RATHBURN RD&lt;br&gt; From: ELMCREST RD&lt;br&gt; To: MILL RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Brian Nolan, Engineering and Construction Services","CONTACT_EMAIL":"bnolan3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5868317826081, 43.6475271143042], [-79.5874367656735, 43.6471609078845], [-79.5874991567889, 43.6471217186069], [-79.5894788287718, 43.6458786051533], [-79.5900293986254, 43.6455330874282], [-79.5900630207061, 43.6455117727079]]}"},{"_id":16,"OBJECTID":2884,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-02","PROJECT":"Local Road Reconstruction","LOCATION":"DOVER AVE&lt;br&gt; From: BROWNS LINE&lt;br&gt; To: LLOYD GEORGE AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Nicholas Mah, Engineering and Construction Services","CONTACT_EMAIL":"nmah@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5425605950632, 43.5957686235557], [-79.5429486575409, 43.5956784261486], [-79.5430568545606, 43.5956595238175], [-79.5445517101717, 43.595319512755]]}"},{"_id":17,"OBJECTID":3087,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-01","PROJECT":"Local Road Rehabilitation","LOCATION":"PENROSE RD&lt;br&gt; From: DE-SAVERY CRES&lt;br&gt; To: MOUNT PLEASANT RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"&lt;Null&gt; Transportation Roads State of Good Repair","CONTACT_EMAIL":"RoadSOGR@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3895303356371, 43.7030380540573], [-79.3881569271875, 43.7032932683942]]}"},{"_id":18,"OBJECTID":3233,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-20","PROJECT":"Local Road Reconstruction","LOCATION":"CHEMICAL CRT&lt;br&gt; From: [305 m S] CORONATION DR [CUL-DE-SAC]&lt;br&gt; To: CORONATION DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.1620622871605, 43.7627011717355], [-79.1622774220258, 43.7632646970804], [-79.1625531024077, 43.7639405985815], [-79.1629828782256, 43.7649679518757], [-79.1632110474337, 43.7655356839205]]}"},{"_id":19,"OBJECTID":3362,"PROJ_NUM":"TS2023-10_11-435","LAST_UPDATED_DATE":"2025-09-05","PROJECT":"Local Road Reconstruction","LOCATION":"AUGUSTA AVE&lt;br&gt; From: OXFORD ST (TO)&lt;br&gt; To: COLLEGE ST (TO) ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.40268459094, 43.6560924157566], [-79.4032003064351, 43.6573828857872]]}"},{"_id":20,"OBJECTID":3393,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-02-11","PROJECT":"Local Road Reconstruction","LOCATION":"QUEEN ELIZABETH BLVD&lt;br&gt; From: ROYAL YORK RD&lt;br&gt; To: CANMOTOR AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q3 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Nicholas Mah, Engineering and Construction Services","CONTACT_EMAIL":"nmah@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5024114897152, 43.62332421573], [-79.50238831985, 43.623231465748], [-79.5023765482619, 43.6231957871272], [-79.5023476768618, 43.6230885242889], [-79.502391564286, 43.6230560292091], [-79.5024931686164, 43.6230238542183], [-79.5059383076482, 43.6222961012901], [-79.5086603410743, 43.6217266767635], [-79.5104959110868, 43.6213926562924], [-79.5115732591841, 43.6211650507351], [-79.5117278712598, 43.6211414440896], [-79.5120476160102, 43.6211074512303], [-79.512187063814, 43.6211063553806], [-79.5122988421262, 43.621098267347], [-79.5125856955201, 43.6211110406292], [-79.5126262010587, 43.6211211699473], [-79.5127254676382, 43.6211613169201], [-79.5127903514855, 43.6212174982648], [-79.5128860912137, 43.6213816974857], [-79.5129525632846, 43.6215272517268], [-79.5129642841548, 43.6217029542579], [-79.5129053071663, 43.6218943803404], [-79.5128157886533, 43.6220136095358], [-79.5126016104699, 43.6222467337542], [-79.5125470483571, 43.6223629839086], [-79.5125368398686, 43.6224478349775], [-79.5125415420439, 43.6225485079798], [-79.5125764302078, 43.6226699961131], [-79.5127198820854, 43.6230366155614], [-79.5127314291368, 43.623095064896], [-79.5127345171743, 43.6231841361487], [-79.5127067126589, 43.6232585304477], [-79.5126600556551, 43.6232997503533], [-79.5126288101257, 43.6233273233097], [-79.5125609765848, 43.6233615613223], [-79.5124218206509, 43.6234032863331], [-79.5123754563584, 43.6234171796277], [-79.511436969647, 43.6236306790489]]}"},{"_id":21,"OBJECTID":3399,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Laneway Reconstruction","LOCATION":"[33.20 m N] DOUGLAS AVE&lt;br&gt; From: JEDBURGH RD&lt;br&gt; To: GREER RD ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2024 - Q3 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4063354943867, 43.7262409379777], [-79.4095119643438, 43.725568889742]]}"},{"_id":22,"OBJECTID":3516,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-07-12","PROJECT":"Local Road Rehabilitation","LOCATION":"HENNING AVE&lt;br&gt; From: EGLINTON AVE W&lt;br&gt; To: [107 m N] EGLINTON AVE W [END] ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4014521157876, 43.7061002196874], [-79.4018118861901, 43.7071266382737]]}"},{"_id":23,"OBJECTID":3653,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-07-22","PROJECT":"Laneway Reconstruction","LOCATION":"[116.70 m W] RONCESVALLES AVE&lt;br&gt; From: GEOFFREY ST&lt;br&gt; To: GRENADIER RD ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4514451805993, 43.6476871556254], [-79.4515951399121, 43.6480977804842], [-79.4517427017002, 43.6485017971034]]}"},{"_id":24,"OBJECTID":3662,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-08-29","PROJECT":"Laneway Reconstruction","LOCATION":"[30.50 m W] OSSINGTON AVE&lt;br&gt; From: BADEN ST&lt;br&gt; To: [30.20 m N] BADEN ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4216355315554, 43.6500756097822], [-79.421591252616, 43.6500841307132], [-79.4217053489407, 43.6503902461918]]}"},{"_id":25,"OBJECTID":3675,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-08-31","PROJECT":"Local Road Rehabilitation","LOCATION":"FERNWOOD PARK AVE&lt;br&gt; From: FIR AVE&lt;br&gt; To: HAZEL AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2881650445252, 43.6703271470925], [-79.28817907089, 43.6704078969828], [-79.288402242705, 43.6709805696214], [-79.2884127267979, 43.6710213830359], [-79.2883999949919, 43.6710697145906], [-79.2883572749416, 43.6711330318403], [-79.2883355382896, 43.6711677547129], [-79.2883289174626, 43.6711991660805], [-79.2884618675573, 43.671481396703]]}"},{"_id":26,"OBJECTID":3677,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-08-29","PROJECT":"Laneway Reconstruction","LOCATION":"[33.50 m E] EMERSON AVE&lt;br&gt; From: [30.50 m N] WALLACE AVE&lt;br&gt; To: ARMSTRONG AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4419968763231, 43.6632356139409], [-79.4420207671826, 43.6633025150236], [-79.4421819084151, 43.6637535367856]]}"},{"_id":27,"OBJECTID":3702,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-09-27","PROJECT":"Laneway Reconstruction","LOCATION":"[28.60 m W] YORK ST&lt;br&gt; From: [52 m S] RICHMOND ST W&lt;br&gt; To: RICHMOND ST W ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3851110950526, 43.6503416018767], [-79.3848953663775, 43.64980495776]]}"},{"_id":28,"OBJECTID":3787,"PROJ_NUM":"TS2023-09-011","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"ASCOT AVE&lt;br&gt; From: EARLSCOURT AVE&lt;br&gt; To: NAIRN AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4483381993882, 43.6791741606789], [-79.4495473959531, 43.6789139380522]]}"},{"_id":29,"OBJECTID":3795,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"MACPHERSON AVE&lt;br&gt; From: SPADINA RD (TO)&lt;br&gt; To: WALMER RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4074931331635, 43.6758691741159], [-79.4080897468529, 43.6757501952466], [-79.4086770638926, 43.6756331312167]]}"},{"_id":30,"OBJECTID":4579,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-12-06","PROJECT":"Local Road Rehabilitation","LOCATION":"SNOOKER ST&lt;br&gt; From: HANNA AVE&lt;br&gt; To: ATLANTIC AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4210127872498, 43.6394728683129], [-79.4205072940313, 43.6395829324299], [-79.4201913818353, 43.6396517204814], [-79.4201884569874, 43.6396515564146], [-79.4200008345386, 43.6396856350069]]}"},{"_id":31,"OBJECTID":4591,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-12-08","PROJECT":"Laneway Reconstruction","LOCATION":"[27.40 m S] COLLEGE ST (TO)&lt;br&gt; From: BEATRICE ST&lt;br&gt; To: [30.50 m W] BEATRICE ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2025 - Q2 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Amran Durrani, Engineering and Construction Services","CONTACT_EMAIL":"adurran2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4166022309284, 43.6547698076285], [-79.4171087607406, 43.6546673031688]]}"},{"_id":32,"OBJECTID":4639,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"ST LEONARDS CRES&lt;br&gt; From: ST LEONARDS AVE&lt;br&gt; To: DAWLISH AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3887718742843, 43.7237594020805], [-79.3887339277786, 43.7237414616731], [-79.3886770081116, 43.723713854342], [-79.3885830754939, 43.723666937445], [-79.3884872590131, 43.7236186405419], [-79.3883819533554, 43.723559991862], [-79.3882425397906, 43.7234751692258], [-79.3881239918271, 43.723389637742], [-79.3880118406689, 43.7233156790014], [-79.3878695675333, 43.7232141098886], [-79.3876617295223, 43.7230827441636], [-79.3875622437126, 43.72301967183], [-79.3874907278577, 43.7229994827745], [-79.3874814849419, 43.722996863315], [-79.3873757562745, 43.7229736520902]]}"},{"_id":33,"OBJECTID":4708,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-05","PROJECT":"Local Road Rehabilitation","LOCATION":"EUCLID AVE (TO)&lt;br&gt; From: ROBINSON ST&lt;br&gt; To: DUNDAS ST W ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Angela Au, Engineering and Construction Services","CONTACT_EMAIL":"aau2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4083232928497, 43.648086892589], [-79.4083917325098, 43.6482331071066], [-79.409208592822, 43.6502714737392], [-79.4093284605902, 43.650570899226], [-79.4097223439915, 43.6515546833211]]}"},{"_id":34,"OBJECTID":4717,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"ST AUBYNS CRES&lt;br&gt; From: BAYVIEW WOOD&lt;br&gt; To: LEWES CRES ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027 - 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Andrea Ramsay, Engineering and Construction Services","CONTACT_EMAIL":"aramsay@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3831977340256, 43.7259497608385], [-79.3830039406515, 43.7263523942656], [-79.3829824627989, 43.7264154016645], [-79.3829747617392, 43.7264551981646], [-79.3829761906555, 43.7265060665356], [-79.3829898337214, 43.7265503035951], [-79.3830186945982, 43.7266000928908], [-79.3830584921605, 43.7266504226414], [-79.3831346403131, 43.7267090886923], [-79.3832249519043, 43.7267621973951], [-79.3833231755616, 43.7268183457203], [-79.3834168364114, 43.7268598901964], [-79.3835078225155, 43.7268911974603], [-79.3835897492007, 43.7269089206562], [-79.3836793197926, 43.7269213318399]]}"},{"_id":35,"OBJECTID":4718,"PROJ_NUM":"TS2023-15-290","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"[E] WANLESS CRES [BRANCH]&lt;br&gt; From: BUCKINGHAM AVE&lt;br&gt; To: LAWRENCE AVE E ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3898692280134, 43.7268063967709], [-79.3898606757624, 43.7268139450712], [-79.3898435058525, 43.7268295096713], [-79.389826323171, 43.7268445881895], [-79.3898086797449, 43.7268611514654], [-79.3897915144474, 43.7268809556458], [-79.3897766920917, 43.7269023823061], [-79.3897282049896, 43.7269651002821], [-79.3896618767372, 43.7270370371875], [-79.3896140512742, 43.7271110883124], [-79.3895651208084, 43.7272061832458], [-79.3895301386397, 43.7273029577674], [-79.3895110684864, 43.7273865509427], [-79.3895042047883, 43.7274950632417], [-79.3895074426673, 43.7275844837754], [-79.3895222931819, 43.7276701179098], [-79.3895314578623, 43.7277907163564]]}"},{"_id":36,"OBJECTID":4838,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"HASLEMERE RD&lt;br&gt; From: LANGTON AVE&lt;br&gt; To: BRAESIDE RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3920647101273, 43.7297043106476], [-79.3908941022949, 43.7299304336252]]}"},{"_id":37,"OBJECTID":4854,"PROJ_NUM":"TS2023-13-049","LAST_UPDATED_DATE":"2024-04-25","PROJECT":"Local Road Rehabilitation","LOCATION":"ST PAUL ST&lt;br&gt; From: RAY LANE&lt;br&gt; To: QUEEN ST E ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2024 - Q4 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Javier Saborio, Engineering and Construction Services","CONTACT_EMAIL":"jsabori@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.360355685286, 43.6560617016883], [-79.3603641264084, 43.6560838463216], [-79.3605137833925, 43.6564794961722]]}"},{"_id":38,"OBJECTID":5008,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-10-28","PROJECT":"Laneway Reconstruction","LOCATION":"[40.20 m S] INNES AVE&lt;br&gt; From: HABIBI LANE&lt;br&gt; To: [40.2 m N] NORMAN AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Amran Durrani, Engineering and Construction Services","CONTACT_EMAIL":"adurran2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4566428105757, 43.6780566539711], [-79.4576392528267, 43.6804243690658]]}"},{"_id":39,"OBJECTID":5060,"PROJ_NUM":"TS2023-04-223","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Rehabilitation","LOCATION":"MARGDON RD&lt;br&gt; From: KENNEDY PARK RD&lt;br&gt; To: GLENDONWYNNE RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4732038861529, 43.6527118143564], [-79.4732867723957, 43.6526117962668], [-79.4733498847216, 43.6525856764555], [-79.473418683022, 43.6525690633652], [-79.474381054799, 43.6523617954893]]}"},{"_id":40,"OBJECTID":5092,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Laneway Reconstruction","LOCATION":"BARBARA BARRETT LANE&lt;br&gt; From: BRUNSWICK AVE&lt;br&gt; To: BORDEN ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2024 - Q3 2024","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4073084436925, 43.665493580025], [-79.4078890606607, 43.665356231679], [-79.4085026766956, 43.6652318318183]]}"},{"_id":41,"OBJECTID":5163,"PROJ_NUM":"TS2023-15-006","LAST_UPDATED_DATE":"2024-06-28","PROJECT":"Local Road Reconstruction","LOCATION":"BRIDLE PATH THE&lt;br&gt; From: [350 m E] BAYVIEW AVE&lt;br&gt; To: BAYVIEW AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2024 - Q1 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Matthew McAinsh, Engineering and Construction Services","CONTACT_EMAIL":"mmcains@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3822969117696, 43.7385257312075], [-79.3809399577641, 43.7388084673418], [-79.3781692763482, 43.739368560522], [-79.3780820753087, 43.7393863376641]]}"},{"_id":42,"OBJECTID":5298,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-06-28","PROJECT":"Major Road Rehabilitation","LOCATION":"WELLESLEY ST E&lt;br&gt; From: JARVIS ST&lt;br&gt; To: WELLESLEY PL ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Rooban Markandu, Engineering and Construction Services","CONTACT_EMAIL":"rmarkan2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3783470452101, 43.6662853080065], [-79.3774153017427, 43.6664850775114], [-79.3773127709555, 43.6665039729333], [-79.3772673732739, 43.6665060593174], [-79.3771889515577, 43.6665157901478], [-79.376986444433, 43.6664726333384], [-79.3768000444419, 43.6664473341763], [-79.3766627877851, 43.666432284456], [-79.3765008836219, 43.6664289195821]]}"},{"_id":43,"OBJECTID":5518,"PROJ_NUM":"TS2023-06_07-301","LAST_UPDATED_DATE":"2024-06-21","PROJECT":"Local Road Reconstruction","LOCATION":"SENTINEL RD&lt;br&gt; From: STILECROFT DR&lt;br&gt; To: GRANDRAVINE DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2024 - Q4 2025","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4941939944994, 43.7504412017151], [-79.4942774937375, 43.750585732842], [-79.4943385959284, 43.7507088768396], [-79.4943879517114, 43.75080465567], [-79.4944753552535, 43.7509159003885], [-79.4946241992533, 43.7510625874774], [-79.4947527429424, 43.7511657778305], [-79.4948499703961, 43.7512267950997], [-79.4949186879399, 43.7512713919295], [-79.4950927175776, 43.7513727926704], [-79.4952344757438, 43.7514490226441], [-79.4956576797227, 43.7516805909094]]}"},{"_id":44,"OBJECTID":5784,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-08-13","PROJECT":"Local Road Rehabilitation","LOCATION":"REDPATH AVE&lt;br&gt; From: EGLINTON AVE E&lt;br&gt; To: ROEHAMPTON AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Bill Dakogiannis, Engineering and Construction Services","CONTACT_EMAIL":"bdakogi@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3928193662151, 43.7078611540079], [-79.3932944623297, 43.709071936103]]}"},{"_id":45,"OBJECTID":6051,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-10-03","PROJECT":"Local Road Rehabilitation","LOCATION":"MONOGRAM PL&lt;br&gt; From: [329 m W] ISLINGTON AVE&lt;br&gt; To: [389 m W] ISLINGTON AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"&lt;Null&gt; Transportation Roads State of Good Repair","CONTACT_EMAIL":"RoadSOGR@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5542971690567, 43.7039904367322], [-79.5549610701561, 43.703837696326]]}"},{"_id":46,"OBJECTID":6134,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-10-03","PROJECT":"Local Road Rehabilitation","LOCATION":"MONOGRAM PL&lt;br&gt; From: [389 m W] ISLINGTON AVE&lt;br&gt; To: [504 m W] ISLINGTON AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"&lt;Null&gt; Transportation Roads State of Good Repair","CONTACT_EMAIL":"RoadSOGR@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5549610701561, 43.703837696326], [-79.5555025161576, 43.7037098704109]]}"},{"_id":47,"OBJECTID":6148,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-08-14","PROJECT":"Major Road Rehabilitation","LOCATION":"GREENWOOD AVE&lt;br&gt; From: SPRINGDALE BLVD&lt;br&gt; To: QUEENSDALE AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Promil Sarkar, Engineering and Construction Services","CONTACT_EMAIL":"psarkar@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3340637582019, 43.6854622211506], [-79.3344095530242, 43.6862688982361]]}"},{"_id":48,"OBJECTID":6149,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-08-14","PROJECT":"Major Road Rehabilitation","LOCATION":"GREENWOOD AVE&lt;br&gt; From: SAMMON AVE&lt;br&gt; To: MORTIMER AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Promil Sarkar, Engineering and Construction Services","CONTACT_EMAIL":"psarkar@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3346688950647, 43.6868847097714], [-79.3355044691125, 43.6886606926582]]}"},{"_id":49,"OBJECTID":6208,"PROJ_NUM":"TS2024-10_11-027","LAST_UPDATED_DATE":"2025-03-19","PROJECT":"Major Road Rehabilitation","LOCATION":"[E] UNIVERSITY AVE [BRANCH]&lt;br&gt; From: DUNDAS ST W&lt;br&gt; To: EDWARD ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2027 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Manveer Ramburrun, Engineering and Construction Services","CONTACT_EMAIL":"mrambur@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3881457854229, 43.6548243888577], [-79.3882868802567, 43.6551417615196], [-79.3884527451187, 43.6555123732583]]}"},{"_id":50,"OBJECTID":6248,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Reconstruction","LOCATION":"RIPLEY AVE&lt;br&gt; From: [E-W] RIPLEY AVE [LEG]&lt;br&gt; To: ORMSKIRK AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4745930727818, 43.6371820456265], [-79.4745961015679, 43.6372062159108], [-79.4746219600916, 43.6372650825915], [-79.4749660380039, 43.6377761731919], [-79.4752688187965, 43.6381989808467], [-79.4756074787958, 43.6385754715282], [-79.4759083851249, 43.6388873368296], [-79.4761854910703, 43.639134154202]]}"},{"_id":51,"OBJECTID":6279,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-11-17","PROJECT":"Local Road Rehabilitation","LOCATION":"WALES AVE&lt;br&gt; From: LEONARD AVE&lt;br&gt; To: CARLYLE ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4042150473904, 43.652833895848], [-79.4046340427991, 43.6527447222629], [-79.4046965971638, 43.652728940144], [-79.4047441896975, 43.6527130465095], [-79.4048000422126, 43.6526784009062]]}"},{"_id":52,"OBJECTID":6296,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"CARLTON ST&lt;br&gt; From: PARLIAMENT ST&lt;br&gt; To: BROADCAST LANE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Jessica Orjuela, Engineering and Construction Services","CONTACT_EMAIL":"jorjuel@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3680571008485, 43.664463438273], [-79.3674857192746, 43.6645993879443]]}"},{"_id":53,"OBJECTID":6330,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-08-14","PROJECT":"Major Road Rehabilitation","LOCATION":"GREENWOOD AVE&lt;br&gt; From: MILVERTON BLVD&lt;br&gt; To: [34.60 m N] MILVERTON BLVD [CITY LIMITS] ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Promil Sarkar, Engineering and Construction Services","CONTACT_EMAIL":"psarkar@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3337588108849, 43.6847137012434], [-79.3339042258784, 43.6850841471032]]}"},{"_id":54,"OBJECTID":6336,"PROJ_NUM":"TS2023-24-430","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Major Road Reconstruction","LOCATION":"SCARBOROUGH GOLF CLUB RD&lt;br&gt; From: LAWRENCE AVE E&lt;br&gt; To: BRIMORTON DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Mehrshad Rahimi, Engineering and Construction Services","CONTACT_EMAIL":"mrahimi@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2158381238168, 43.7618520435907], [-79.215828397595, 43.761950016156], [-79.2158324447904, 43.7620534695775], [-79.2158488821821, 43.7622024988695], [-79.2158485237521, 43.7623157526185], [-79.2158533224095, 43.7624097557626], [-79.2158620406353, 43.7625208357846], [-79.2158722112088, 43.7626349690136], [-79.2158872729591, 43.7627527229704], [-79.2159039667724, 43.7628665294621], [-79.2159326974007, 43.762993300559], [-79.2159616966173, 43.7630971913185], [-79.216003587844, 43.7632196925343], [-79.21606220225, 43.7633968796273], [-79.2161691132971, 43.763684334037], [-79.2162850205334, 43.7639235634562], [-79.2163939438197, 43.7641961499806], [-79.2164369274849, 43.7643170056097], [-79.2166796504369, 43.7648884954113], [-79.2177392055452, 43.7675540537722], [-79.2183042255374, 43.7688979326568], [-79.2186842206825, 43.7698112450039]]}"},{"_id":55,"OBJECTID":6365,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-08-14","PROJECT":"Major Road Rehabilitation","LOCATION":"GREENWOOD AVE&lt;br&gt; From: [34.60 m N] MILVERTON BLVD&lt;br&gt; To: SPRINGDALE BLVD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Promil Sarkar, Engineering and Construction Services","CONTACT_EMAIL":"psarkar@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3339042258784, 43.6850841471032], [-79.3340637582019, 43.6854622211506]]}"},{"_id":56,"OBJECTID":6373,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-12-03","PROJECT":"Laneway Reconstruction","LOCATION":"FITZROY TER&lt;br&gt; From: [50 m W] KENSINGTON AVE (TO)&lt;br&gt; To: [52 m W] KENSINGTON AVE (TO) [END] ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027 - 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4007953113884, 43.6533083689239], [-79.4009283472529, 43.6532792298905]]}"},{"_id":57,"OBJECTID":6374,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Rehabilitation","LOCATION":"BOSWELL AVE&lt;br&gt; From: [240.80 m E] BEDFORD RD [END]&lt;br&gt; To: BEDFORD RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Angela Au, Engineering and Construction Services","CONTACT_EMAIL":"aau2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3959798989538, 43.6726076617825], [-79.3988644329508, 43.6720084791832]]}"},{"_id":58,"OBJECTID":6519,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Rehabilitation","LOCATION":"WINONA DR&lt;br&gt; From: AVA RD&lt;br&gt; To: CLOVELLY AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Cherry Chen, Engineering and Construction Services","CONTACT_EMAIL":"cchen9@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4378210729329, 43.6951081285457], [-79.4380315034335, 43.6956078171111]]}"},{"_id":59,"OBJECTID":6546,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2025-08-21","PROJECT":"Local Road Reconstruction","LOCATION":"ST LEONARDS AVE&lt;br&gt; From: LEWES CRES&lt;br&gt; To: BAYVIEW AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027 - 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Andrea Ramsay, Engineering and Construction Services","CONTACT_EMAIL":"aramsay@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3840849904927, 43.7247559634183], [-79.3821241626606, 43.7251647415177], [-79.3811784911169, 43.7253741502017], [-79.3811055734359, 43.7253902874149], [-79.380203634747, 43.7255848040467]]}"},{"_id":60,"OBJECTID":6554,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Local Road Reconstruction","LOCATION":"DEWBOURNE AVE&lt;br&gt; From: BATHURST ST&lt;br&gt; To: CHILTERN HILL RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4247659211015, 43.6990228426484], [-79.4250754201436, 43.6988465982607], [-79.4252296354115, 43.6987770211974], [-79.4256101198034, 43.6986053269079], [-79.4258025337746, 43.6985525046097], [-79.426880109488, 43.6983304531931]]}"},{"_id":61,"OBJECTID":6555,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Laneway Reconstruction","LOCATION":"[87.20 m N] DAVENPORT RD&lt;br&gt; From: GREENLAW AVE&lt;br&gt; To: ST CLARENS AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4464401861922, 43.672909534591], [-79.4464681309669, 43.6728510030595], [-79.4465036843606, 43.6728113859667], [-79.4465549600059, 43.6727870163589], [-79.4471822074002, 43.6726508225971], [-79.44780806402, 43.6725149217989]]}"},{"_id":62,"OBJECTID":6567,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"REGENT ST&lt;br&gt; From: SHUTER ST&lt;br&gt; To: SUTTON AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3635196654214, 43.6572869062608], [-79.3636245791047, 43.6575166189766], [-79.3637305759413, 43.6577737410838], [-79.3637847207681, 43.6579141528371]]}"},{"_id":63,"OBJECTID":6568,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Reconstruction","LOCATION":"HIGHLAND GDNS&lt;br&gt; From: [73 m W] HIGHLAND AVE [END]&lt;br&gt; To: [73 m W] HIGHLAND AVE [END] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3815816319326, 43.6824393660884], [-79.3816929377368, 43.6824116177864], [-79.3817923972122, 43.6824002890171], [-79.3818622678438, 43.682416079336], [-79.3819005532954, 43.6824732763137], [-79.3818797874033, 43.6825196953142], [-79.381833453308, 43.6825510844999], [-79.3817536679897, 43.6825710074052], [-79.3816679835857, 43.6825859230207], [-79.3815842743853, 43.6825979809021], [-79.3815104376598, 43.6825957602774]]}"},{"_id":64,"OBJECTID":6569,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Reconstruction","LOCATION":"HIGHLAND AVE&lt;br&gt; From: [289.60 m E] HIGHLAND GDNS&lt;br&gt; To: ROXBOROUGH DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3785435145386, 43.6817156190147], [-79.3776022649132, 43.6819003219836], [-79.3775600098701, 43.6819047764862], [-79.3771063502459, 43.6819898012094]]}"},{"_id":65,"OBJECTID":6571,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"CARLTON ST&lt;br&gt; From: SACKVILLE ST&lt;br&gt; To: WOODSTOCK PL ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Jessica Orjuela, Engineering and Construction Services","CONTACT_EMAIL":"jorjuel@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3650544654706, 43.6651339478541], [-79.3645021590854, 43.6652537495124]]}"},{"_id":66,"OBJECTID":6922,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-11","PROJECT":"Laneway Reconstruction","LOCATION":"LEADER LANE&lt;br&gt; From: COLBORNE ST&lt;br&gt; To: KING ST E ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3754504316776, 43.6489765510062], [-79.3755293657239, 43.6491712293307], [-79.3755633110524, 43.6492526295987], [-79.3757196347688, 43.6496404261973]]}"},{"_id":67,"OBJECTID":7441,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-02-18","PROJECT":"Local Road Reconstruction","LOCATION":"LANGTON AVE&lt;br&gt; From: HASLEMERE RD&lt;br&gt; To: BRAESIDE RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027 - 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3920647101273, 43.7297043106476], [-79.3923982481767, 43.7305233036032]]}"},{"_id":68,"OBJECTID":7491,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-11-17","PROJECT":"Local Road Rehabilitation","LOCATION":"WALES AVE&lt;br&gt; From: DENISON AVE&lt;br&gt; To: BELLEVUE AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4026878065616, 43.6531114634911], [-79.4029094143391, 43.6530886876627]]}"},{"_id":69,"OBJECTID":7812,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2026-03-11","PROJECT":"Local Road Reconstruction","LOCATION":"BRAESIDE CRES&lt;br&gt; From: BRAESIDE RD&lt;br&gt; To: [1 m E] BRAESIDE RD [CITY LIMITS] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3905438757911, 43.7291351132711], [-79.3904295275255, 43.729155812771]]}"},{"_id":70,"OBJECTID":7838,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-19","PROJECT":"Local Road Reconstruction","LOCATION":"RIDELLE AVE&lt;br&gt; From: LAWNHURST BLVD&lt;br&gt; To: BURMONT RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4306603358075, 43.7063224618657], [-79.4318104838685, 43.7060823742306]]}"},{"_id":71,"OBJECTID":7873,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Local Road Reconstruction","LOCATION":"ZAPH AVE&lt;br&gt; From: ELLESMERE RD&lt;br&gt; To: [762 m N] ELLESMERE AVE [CUL-DE-SAC] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.1667276247241, 43.7917396982679], [-79.1673478521731, 43.7930824701267], [-79.1677442462625, 43.793940627809], [-79.1678281423517, 43.7941287117041], [-79.1683264158111, 43.7952195732394], [-79.1687670413371, 43.7961779281127], [-79.1688008359139, 43.796251440119], [-79.1692238860574, 43.7971715413646], [-79.1698651130894, 43.7985584204752], [-79.170003313288, 43.7988717327379], [-79.1700847528557, 43.7990317890393], [-79.1700913760179, 43.7990386652109]]}"},{"_id":72,"OBJECTID":7881,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Local Road Reconstruction","LOCATION":"ORCHARD PARK DR&lt;br&gt; From: KINGSTON RD&lt;br&gt; To: WEST HILL DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.1793273630366, 43.7746799814392], [-79.1793724937866, 43.7747707128139], [-79.1794136503585, 43.7748287408155], [-79.1794531636817, 43.7748595347893], [-79.1795028874367, 43.7748832464663], [-79.1795664299426, 43.7748966815375], [-79.1796418076897, 43.7748990774229], [-79.1798225588095, 43.7749044031346], [-79.1804253829807, 43.7748996607445], [-79.1810603904613, 43.7749045237125], [-79.1817180624308, 43.7749199236184]]}"},{"_id":73,"OBJECTID":7884,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Laneway Reconstruction","LOCATION":"[43.30 m N] DUNDAS ST W&lt;br&gt; From: HURON ST&lt;br&gt; To: [79.20 m W] HURON ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3963577279059, 43.6538134539269], [-79.3974500705277, 43.653578495542]]}"},{"_id":74,"OBJECTID":7907,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-19","PROJECT":"Local Road Reconstruction","LOCATION":"RIDELLE AVE&lt;br&gt; From: MANITOU BLVD&lt;br&gt; To: LAWNHURST BLVD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4285835861986, 43.7067692737433], [-79.4306603358075, 43.7063224618657]]}"},{"_id":75,"OBJECTID":7916,"PROJ_NUM":"TS2023-20-173","LAST_UPDATED_DATE":"2026-03-19","PROJECT":"Local Road Reconstruction","LOCATION":"PARKCREST DR&lt;br&gt; From: HILL CRES&lt;br&gt; To: 126 m S KINGSTON RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Gabor Szakter, Engineering and Construction Services","CONTACT_EMAIL":"gszakte@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2160018111796, 43.7326164714789], [-79.2163601447073, 43.7334635133611], [-79.2168030130416, 43.7344996613504], [-79.2168560133695, 43.7346168004549], [-79.2168920696714, 43.7347068956969], [-79.2169281959793, 43.7347789895541], [-79.2169760113981, 43.7348421120208], [-79.2170331385244, 43.7349052575197], [-79.2170709850669, 43.7349413623993], [-79.2171204895772, 43.7349774772163], [-79.2171629914554, 43.735013583685], [-79.2172542159454, 43.7350858128629], [-79.2173153276073, 43.7351219653079], [-79.2174346218274, 43.7351672591917], [-79.2175228666099, 43.7352124780208], [-79.2176344434893, 43.735248761302], [-79.2177204380888, 43.7352759638739], [-79.2178103182339, 43.7353031939763], [-79.2178677350827, 43.7353033231135], [-79.2179391175277, 43.7353034965873], [-79.2180096346661, 43.7353216694256], [-79.2180972756157, 43.7353308832327], [-79.2181763745795, 43.7353400759115], [-79.2182368948968, 43.7353402224167], [-79.2183215155728, 43.7353314261625], [-79.2184014685945, 43.7353226183462], [-79.2185365579262, 43.7353049423375], [-79.2186973301611, 43.7352693260355], [-79.2188441885773, 43.7352246839619], [-79.2189389312257, 43.7352069010244], [-79.2190492752979, 43.7351711620143]]}"},{"_id":76,"OBJECTID":7961,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Local Road Rehabilitation","LOCATION":"WALES AVE&lt;br&gt; From: BELLEVUE AVE&lt;br&gt; To: LEONARD AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4029094143391, 43.6530886876627], [-79.403221472379, 43.6530196310293], [-79.4033423418426, 43.6529970309717], [-79.4042150473904, 43.652833895848]]}"},{"_id":77,"OBJECTID":8085,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-05-19","PROJECT":"Local Road Reconstruction","LOCATION":"AMHERST AVE&lt;br&gt; From: LAUDER AVE&lt;br&gt; To: NORTHCLIFFE BLVD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2028 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4446388111249, 43.6907330363232], [-79.44575001914, 43.6904886833956]]}"},{"_id":78,"OBJECTID":8086,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-03-24","PROJECT":"Major Road Reconstruction","LOCATION":"BLOOR ST W&lt;br&gt; From: MADISON AVE&lt;br&gt; To: SPADINA RD (TO) ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2023 - Q2 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Ahmed Bhabha, Engineering and Construction Services","CONTACT_EMAIL":"abhabha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2023","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4027071807526, 43.6669054451141], [-79.4038707403777, 43.6666572968697]]}"},{"_id":79,"OBJECTID":8090,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-03-24","PROJECT":"Major Road Reconstruction","LOCATION":"BLOOR ST W&lt;br&gt; From: DEVONSHIRE PL&lt;br&gt; To: ST GEORGE ST (TO) ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2023 - Q2 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Ahmed Bhabha, Engineering and Construction Services","CONTACT_EMAIL":"abhabha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2023","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3983645805034, 43.667831627684], [-79.3998364722679, 43.6675168783568]]}"},{"_id":80,"OBJECTID":8106,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"BRIDGMAN AVE&lt;br&gt; From: DARTNELL AVE&lt;br&gt; To: [15 m W] DARTNELL AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4115365763733, 43.6750145911824], [-79.4117988856133, 43.6749637113763]]}"},{"_id":81,"OBJECTID":8115,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Laneway Reconstruction","LOCATION":"[33.50 m W] YONGE ST&lt;br&gt; From: WELLINGTON ST W&lt;br&gt; To: MELINDA ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3778722643263, 43.6477124723191], [-79.3781701427466, 43.6484220499392]]}"},{"_id":82,"OBJECTID":8164,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-02-22","PROJECT":"Local Road Rehabilitation","LOCATION":"DOROTHY ST&lt;br&gt; From: HILTZ AVE&lt;br&gt; To: GREENWOOD AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.326923741667, 43.665894202187], [-79.3260210547978, 43.6660953799296]]}"},{"_id":83,"OBJECTID":8191,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-05-05","PROJECT":"Laneway Reconstruction","LOCATION":"[30.50 m S] QUEEN ST E&lt;br&gt; From: WINNIFRED AVE&lt;br&gt; To: CAROLINE AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Shahid Virk, Engineering and Construction Services","CONTACT_EMAIL":"svirk@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.336150518089, 43.6615353680845], [-79.3356450503918, 43.6616500378625], [-79.3351735966844, 43.6617449271971]]}"},{"_id":84,"OBJECTID":8193,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-05-19","PROJECT":"Local Road Reconstruction","LOCATION":"AMHERST AVE&lt;br&gt; From: WESTMOUNT AVE&lt;br&gt; To: NORTHCLIFFE BLVD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2028 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.44575001914, 43.6904886833956], [-79.4468253424522, 43.6902652579895]]}"},{"_id":85,"OBJECTID":8274,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-10-31","PROJECT":"Laneway Reconstruction","LOCATION":"[30.20 m N] BADEN ST&lt;br&gt; From: [30.50 m W] OSSINGTON AVE&lt;br&gt; To: [67.10 m W] OSSINGTON AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4217053427412, 43.6503902470876], [-79.4221133490483, 43.6503136226759]]}"},{"_id":86,"OBJECTID":8389,"PROJ_NUM":"TS2023-12-084","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"COLLEGE VIEW AVE&lt;br&gt; From: ORIOLE PKWY&lt;br&gt; To: HIGHBOURNE RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4050543772978, 43.7023348701479], [-79.4063385693134, 43.7020610206571]]}"},{"_id":87,"OBJECTID":8720,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-12","PROJECT":"Major Road Rehabilitation","LOCATION":"DUPONT ST&lt;br&gt; From: ST GEORGE ST (TO)&lt;br&gt; To: HURON ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q4 2026 - Q3 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Shahid Virk, Engineering and Construction Services","CONTACT_EMAIL":"svirk@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.403600319043, 43.675594773861], [-79.4041738521104, 43.6754803452256], [-79.4047887916673, 43.6753576543882]]}"},{"_id":88,"OBJECTID":8736,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"MILDENHALL RD&lt;br&gt; From: BLYTHWOOD RD&lt;br&gt; To: LAWRENCE AVE E ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3832254686457, 43.7201223674845], [-79.3835472674394, 43.7208965323133], [-79.3838624792093, 43.721721433073], [-79.3842067678901, 43.7226071675237], [-79.3846013974838, 43.7235922398659], [-79.3849823905845, 43.7245527091598], [-79.3853886041248, 43.7255219245174], [-79.3857736626135, 43.7264958670832], [-79.386156918345, 43.7274497588323], [-79.3865424099046, 43.72839676001]]}"},{"_id":89,"OBJECTID":8806,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"ROCHESTER AVE&lt;br&gt; From: MILDENHALL RD&lt;br&gt; To: LEWES CRES ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Rachele Joseph, Engineering and Construction Services","CONTACT_EMAIL":"rgjoseph@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3853886041248, 43.7255219245174], [-79.3839519974445, 43.7258025955114]]}"},{"_id":90,"OBJECTID":8951,"PROJ_NUM":"TS2023-13-097","LAST_UPDATED_DATE":"2024-04-16","PROJECT":"Local Road Rehabilitation","LOCATION":"SEATON ST&lt;br&gt; From: SHUTER ST&lt;br&gt; To: DUNDAS ST E ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Angela Au, Engineering and Construction Services","CONTACT_EMAIL":"aau2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.36862064895, 43.6563200859519], [-79.3686234388019, 43.6564347933699], [-79.3688276628731, 43.6569945761227], [-79.3688343056921, 43.6570127934754], [-79.3688388176363, 43.6570251665069], [-79.3688460151363, 43.6570448688177], [-79.3689648016937, 43.6573329654098], [-79.3693147465043, 43.6581815495749], [-79.3693565848024, 43.6582829993802], [-79.3695116514794, 43.6586590313533]]}"},{"_id":91,"OBJECTID":9046,"PROJ_NUM":"TS2023-13-001","LAST_UPDATED_DATE":"2024-04-25","PROJECT":"Major Road Reconstruction","LOCATION":"GERRARD ST E&lt;br&gt; From: SHERBOURNE ST&lt;br&gt; To: CENTRAL HOSPITAL LANE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2027 - Q3 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marilia Cimini, Engineering and Construction Services","CONTACT_EMAIL":"mcimini@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3722361254016, 43.6612269152213], [-79.3714388008979, 43.6614023360052]]}"},{"_id":92,"OBJECTID":9068,"PROJ_NUM":"TS2023-13-001","LAST_UPDATED_DATE":"2024-04-25","PROJECT":"Major Road Reconstruction","LOCATION":"GERRARD ST E&lt;br&gt; From: [N] GERRARD ST E [BRANCH]&lt;br&gt; To: PARLIAMENT ST ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2027 - Q3 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marilia Cimini, Engineering and Construction Services","CONTACT_EMAIL":"mcimini@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3681759581657, 43.6621129619358], [-79.3670355355869, 43.6619503721934]]}"},{"_id":93,"OBJECTID":9121,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"PEMBURY AVE&lt;br&gt; From: ST LEONARDS AVE&lt;br&gt; To: LAWRENCE BAYVIEW S [RAMP] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027 - 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Andrea Ramsay, Engineering and Construction Services","CONTACT_EMAIL":"aramsay@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3811784911169, 43.7253741502017], [-79.3813193309742, 43.7259049593112], [-79.3813273725343, 43.7259176594103], [-79.3813346688747, 43.7259306107699], [-79.3813410972023, 43.7259437691566], [-79.3813467790345, 43.7259571959051], [-79.3813516042565, 43.7259707117765], [-79.3813556484378, 43.7259843897594], [-79.3813589837494, 43.7259981381162], [-79.3813613133955, 43.726012030349], [-79.3813628982468, 43.7260259569136], [-79.3813636153853, 43.7260399365849], [-79.381363586412, 43.7260539883918], [-79.3813626888584, 43.7260679033785], [-79.3813609223651, 43.7260818633695], [-79.3813582884783, 43.7260957135451], [-79.3813549087439, 43.7261095008379], [-79.3813515297026, 43.7261229361828], [-79.3813473504182, 43.7261393420064]]}"},{"_id":94,"OBJECTID":9153,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"[N-S] BRAESIDE RD [BRANCH]&lt;br&gt; From: HASLEMERE RD&lt;br&gt; To: BRAESIDE CRES ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3908941022949, 43.7299304336252], [-79.3905438757911, 43.7291351132711]]}"},{"_id":95,"OBJECTID":9270,"PROJ_NUM":"TS2023-19-440","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Rehabilitation","LOCATION":"BARKER AVE (E YK)&lt;br&gt; From: CEDARVALE AVE&lt;br&gt; To: KING EDWARD AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3146759823346, 43.6947314523992], [-79.3145799908176, 43.6947620820384], [-79.3134045612865, 43.6950339831121]]}"},{"_id":96,"OBJECTID":9276,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-10","PROJECT":"Major Road Reconstruction","LOCATION":"STEELES AVE E&lt;br&gt; From: BRIMLEY RD&lt;br&gt; To: MIDLAND AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2024 - Q4 2025","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Brian Nolan, Engineering and Construction Services","CONTACT_EMAIL":"bnolan3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2973325250841, 43.8259504750552], [-79.2965905096487, 43.8261287202774], [-79.2965858186382, 43.8261298460644], [-79.2959933857037, 43.826272150295], [-79.2954561631618, 43.8263959252406], [-79.2941324768324, 43.8267008885968], [-79.2939728335849, 43.8267377861768], [-79.2931126512135, 43.826936523393], [-79.2917460839233, 43.8272522790495], [-79.2913492036578, 43.8273439593373], [-79.2894795688682, 43.8277725977523], [-79.2875393354156, 43.828201042818], [-79.287202145524, 43.8282949348903]]}"},{"_id":97,"OBJECTID":9454,"PROJ_NUM":"TS2023-08-230","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Reconstruction","LOCATION":"NEW HAVEN DR&lt;br&gt; From: [49.80 m E] GILGORM RD [END]&lt;br&gt; To: GILGORM RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2024 - Q3 2024","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.417408604062, 43.7061309192784], [-79.4179105080564, 43.7060097537411]]}"},{"_id":98,"OBJECTID":9497,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-12-08","PROJECT":"Laneway Reconstruction","LOCATION":"[30.50 m W] BEATRICE ST&lt;br&gt; From: [36.60 m N] DUNDAS ST W&lt;br&gt; To: [30.50 m S] COLLEGE ST (TO) ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2025 - Q2 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Amran Durrani, Engineering and Construction Services","CONTACT_EMAIL":"adurran2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4155810547327, 43.6508007945212], [-79.4171087607406, 43.6546673031688], [-79.4171565928882, 43.6547878740736]]}"},{"_id":99,"OBJECTID":9504,"PROJ_NUM":"TS2023-04-089","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Rehabilitation","LOCATION":"EVANS AVE (TO)&lt;br&gt; From: ARDAGH ST&lt;br&gt; To: ANNETTE ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4850005380202, 43.6561965500742], [-79.4853256417031, 43.6569701684169], [-79.4858924359026, 43.6583188841092], [-79.486049605417, 43.6586927663044]]}"},{"_id":100,"OBJECTID":9588,"PROJ_NUM":"TS2023-08-169\n","LAST_UPDATED_DATE":"2024-04-25","PROJECT":"Local Road Reconstruction","LOCATION":"ELM RIDGE DR&lt;br&gt; From: [W] WILLIAM R ALLEN RD [BRIDGE]&lt;br&gt; To: [163.50 m] ROSELAWN AVE [CITY LIMITS] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2025 - 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adel Roufail, Engineering and Construction Services","CONTACT_EMAIL":"aroufai@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4378387212772, 43.7029345485977], [-79.438994439253, 43.7026791478934]]}"}], "fields": [{"id": "_id", "type": "int"}, {"id": "OBJECTID", "type": "int4", "info": {"notes": "Unique row identifier"}}, {"id": "PROJ_NUM", "type": "text", "info": {"notes": ""}}, {"id": "LAST_UPDATED_DATE", "type": "date", "info": {"notes": "The most recent date on which the project information was revised or updated"}}, {"id": "PROJECT", "type": "text", "info": {"notes": "Road Construction"}}, {"id": "LOCATION", "type": "text", "info": {"notes": "The name, beginning and end of the street where the road reconstruction project is located"}}, {"id": "DETAILS", "type": "text", "info": {"notes": "Project scope summary"}}, {"id": "DURATION/ Construction Timeline", "type": "text", "info": {"notes": "The year in which the project begins and ends"}}, {"id": "STATUS", "type": "text", "info": {"notes": "The status of the project"}}, {"id": "INV_PRIORITY", "type": "text", "info": {"notes": ""}}, {"id": "OWNER", "type": "text", "info": {"notes": "Owner of all road reconstruction projects is Transportation Services"}}, {"id": "CONTACT_NAME", "type": "text", "info": {"notes": "Contact person information"}}, {"id": "CONTACT_EMAIL", "type": "text", "info": {"notes": "Contact email address"}}, {"id": "INV_WEB_SITE", "type": "text", "info": {"notes": ""}}, {"id": "INV_DISPLAY_PROGRAM", "type": "text", "info": {"notes": ""}}, {"id": "INV_DISPLAY_SYMBOL", "type": "text", "info": {"notes": ""}}, {"id": "START_YEAR", "type": "text", "info": {"notes": "The year in which the project begins"}}, {"id": "CONTR_NUMBER", "type": "text", "info": {"notes": ""}}, {"id": "geometry", "type": "text", "info": {"notes": ""}}], "_links": {"start": "/api/action/datastore_search?resource_id=40d94b5a-cbf2-4e04-8d48-24038d163d0c", "next": "/api/action/datastore_search?resource_id=40d94b5a-cbf2-4e04-8d48-24038d163d0c&offset=100"}, "total": 324, "total_was_estimated": false}}