{"help": "https://ckan0.cf.opendata.inter.prod-toronto.ca/de/api/3/action/help_show?name=datastore_search", "success": true, "result": {"include_total": true, "limit": 100, "records_format": "objects", "resource_id": "40d94b5a-cbf2-4e04-8d48-24038d163d0c", "total_estimation_threshold": null, "records": [{"_id":1,"OBJECTID":93,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Rehabilitation","LOCATION":"WINONA DR&lt;br&gt; From: LANARK AVE&lt;br&gt; To: EGLINTON AVE W ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Cherry Chen, Engineering and Construction Services","CONTACT_EMAIL":"cchen9@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4387210208475, 43.6972723911113], [-79.4388960360233, 43.6977113965367], [-79.4390546198234, 43.6981091760141]]}"},{"_id":2,"OBJECTID":130,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Rehabilitation","LOCATION":"WINONA DR&lt;br&gt; From: BELVIDERE AVE&lt;br&gt; To: BUDE ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Cherry Chen, Engineering and Construction Services","CONTACT_EMAIL":"cchen9@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4372030906581, 43.6935452763142], [-79.4377070748369, 43.6947908537966]]}"},{"_id":3,"OBJECTID":231,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"CARLTON ST&lt;br&gt; From: PARLIAMENT ST&lt;br&gt; To: BROADCAST LANE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Jessica Orjuela, Engineering and Construction Services","CONTACT_EMAIL":"jorjuel@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3680570983726, 43.6644634364699], [-79.3674857180327, 43.664599388843]]}"},{"_id":4,"OBJECTID":273,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Laneway Reconstruction","LOCATION":"[195.70 m N] DAVENPORT RD&lt;br&gt; From: ST CLARENS AVE&lt;br&gt; To: [36.10 m W] ST CLARENS AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.448182713631, 43.6734808147367], [-79.4487804313447, 43.673349970823]]}"},{"_id":5,"OBJECTID":407,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"CARLTON ST&lt;br&gt; From: WOODSTOCK PL&lt;br&gt; To: BOWMAN ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Jessica Orjuela, Engineering and Construction Services","CONTACT_EMAIL":"jorjuel@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3645021603355, 43.6652537450132], [-79.3644791353226, 43.6652587854712], [-79.3644459003492, 43.6652660821547], [-79.3638396618719, 43.6654072497246]]}"},{"_id":6,"OBJECTID":408,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"REGENT ST&lt;br&gt; From: SUTTON AVE&lt;br&gt; To: ST DAVID WALK ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3637847232498, 43.6579141519399], [-79.3640219851897, 43.658529685528]]}"},{"_id":7,"OBJECTID":430,"PROJ_NUM":"TS2023-24-430","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Major Road Reconstruction","LOCATION":"SCARBOROUGH GOLF CLUB RD&lt;br&gt; From: LAWRENCE AVE E&lt;br&gt; To: BRIMORTON DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Mehrshad Rahimi, Engineering and Construction Services","CONTACT_EMAIL":"mrahimi@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2158381225919, 43.7618520399872], [-79.2158283938479, 43.7619500206472], [-79.2158324497454, 43.7620534722902], [-79.2158488834155, 43.7622025006728], [-79.2158485212682, 43.7623157526123], [-79.215853317446, 43.7624097548501], [-79.215862044374, 43.7625208330936], [-79.2158722099797, 43.7626349663102], [-79.2158872766935, 43.7627527211795], [-79.2159039642928, 43.7628665285559], [-79.2159326998846, 43.7629933005652], [-79.2159616928871, 43.7630971922094], [-79.2160035890775, 43.7632196943376], [-79.2160622047126, 43.7633968841341], [-79.2161691095797, 43.7636843322275], [-79.2162850242508, 43.7639235652656], [-79.2163939388603, 43.7641961481681], [-79.2164369250009, 43.7643170056035], [-79.2166796479402, 43.7648884981054], [-79.2177392105135, 43.7675540537845], [-79.2183042193101, 43.7688979362419], [-79.2186842194236, 43.7698112486013]]}"},{"_id":8,"OBJECTID":681,"PROJ_NUM":"TS2023-10_11-435","LAST_UPDATED_DATE":"2025-09-05","PROJECT":"Local Road Reconstruction","LOCATION":"AUGUSTA AVE&lt;br&gt; From: WALES AVE&lt;br&gt; To: DENISON SQ ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.401568830851, 43.653346812673], [-79.4017770609106, 43.6538823474021]]}"},{"_id":9,"OBJECTID":707,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-18","PROJECT":"Local Road Reconstruction","LOCATION":"MILITARY TRL&lt;br&gt; From: ELLESMERE RD&lt;br&gt; To: EAST HIGHLAND CREEK ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2022 - Q4 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2021","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2171425869619, 43.7797525911282], [-79.2172054231109, 43.7798897801554], [-79.2172618651669, 43.7800130195448], [-79.2172988800767, 43.7800935003898], [-79.2173281899266, 43.7801560948803], [-79.2173465622082, 43.7802276814674], [-79.2173509875124, 43.7802904214334], [-79.2173631522376, 43.7803532345448], [-79.217363693422, 43.7804071347747], [-79.2173571682356, 43.7804789568231], [-79.2173460391378, 43.7805417663338], [-79.217326417551, 43.7805955716908], [-79.2173114170927, 43.7806494514819], [-79.2172956333036, 43.7807034643501], [-79.217279836596, 43.7807575761964], [-79.2172578276505, 43.780811789687], [-79.2172388999469, 43.7808659477879], [-79.2172160375246, 43.7809378014119], [-79.2171947165617, 43.7810094428172], [-79.2171733827846, 43.781081156195], [-79.2171615422584, 43.7811261506452], [-79.2171426645277, 43.7811802098381], [-79.2171345648972, 43.7812433418581], [-79.2171280731657, 43.7812974497034], [-79.2171239299592, 43.7813514553467], [-79.2171236450957, 43.7814145076927], [-79.2171311248896, 43.7814775792555], [-79.2171339213066, 43.7815405852192], [-79.2171382641291, 43.7815944408408], [-79.2171433293577, 43.7816663545543], [-79.2171569664363, 43.7817383704903], [-79.2171721795321, 43.7817923250184], [-79.2171893778909, 43.7818547275337], [-79.2172072972751, 43.7819170418184], [-79.2172370969877, 43.7819707623922], [-79.2172779767934, 43.782024888415], [-79.2173119417115, 43.7820700321761], [-79.2173405515638, 43.7821152796981], [-79.217378526901, 43.7821425030698], [-79.2174474764815, 43.7821878053032], [-79.2174954482687, 43.7822239554838], [-79.2175449539182, 43.7822509822707], [-79.2175834411329, 43.7822777117756], [-79.2176093076736, 43.7823040500395], [-79.2176428898198, 43.7823302993451], [-79.2176824875901, 43.7823929821442], [-79.2177006729781, 43.7824200305062], [-79.2177267546203, 43.7824561265182], [-79.2177400525552, 43.7824921459481], [-79.2177549791368, 43.7825464147242], [-79.2177566352935, 43.7825931437707], [-79.2177474628607, 43.7826388109434], [-79.2177256224113, 43.7826729973695], [-79.217703832437, 43.7826990918845], [-79.2176712122783, 43.782735015899], [-79.2176277659243, 43.7827799143043], [-79.2175847526409, 43.7828251738087], [-79.2175221614293, 43.7828910785477], [-79.2174727102193, 43.7829262498139], [-79.2173183468634, 43.783033593854], [-79.2172000006983, 43.7831249687629], [-79.2171161885595, 43.7832066987883], [-79.2170426411407, 43.7832694077385], [-79.2169586073026, 43.7833137733392], [-79.2168539815298, 43.783385577366], [-79.2167740877602, 43.7834213749942], [-79.2166983141484, 43.7834660219047], [-79.2166161545103, 43.783510661932], [-79.2164667188975, 43.7835920487226], [-79.2163552888671, 43.783654870268], [-79.2162462067663, 43.7837176885321], [-79.2161471429247, 43.7837821427778], [-79.216059960995, 43.78383510499], [-79.2156789478982, 43.7840665583619]]}"},{"_id":10,"OBJECTID":1246,"PROJ_NUM":"TS2023-13-146","LAST_UPDATED_DATE":"2025-06-13","PROJECT":"Laneway Reconstruction","LOCATION":"COATSWORTH ST&lt;br&gt; From: ONTARIO ST&lt;br&gt; To: MILAN ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2025 - Q3 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Newsha Roshani, Engineering and Construction Services","CONTACT_EMAIL":"nroshan@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3684011389528, 43.6584551847988], [-79.3678113567135, 43.658584897833]]}"},{"_id":11,"OBJECTID":2091,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-02-11","PROJECT":"Local Road Reconstruction","LOCATION":"QUEEN ELIZABETH BLVD&lt;br&gt; From: ROYAL YORK RD&lt;br&gt; To: CANMOTOR AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2026 - Q3 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Nicholas Mah, Engineering and Construction Services","CONTACT_EMAIL":"nmah@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5024114847587, 43.6233242121296], [-79.502388322328, 43.6232314621474], [-79.5023765495012, 43.6231957898276], [-79.5023476743835, 43.6230885206883], [-79.5023915618077, 43.6230560247085], [-79.5024931661381, 43.623023851518], [-79.5059383051704, 43.6222961048907], [-79.5086603410738, 43.621726673163], [-79.5104959098479, 43.6213926571927], [-79.5115732653795, 43.6211650516346], [-79.5117278700206, 43.6211414431896], [-79.5120476135314, 43.62110744763], [-79.5121870687697, 43.6211063526797], [-79.512298842126, 43.6210982664469], [-79.512585697999, 43.6211110442295], [-79.5126262047751, 43.6211211663464], [-79.5127254614435, 43.6211613196212], [-79.5127903502467, 43.6212174991651], [-79.5128860899754, 43.6213817010864], [-79.5129525595682, 43.6215272553277], [-79.5129642816763, 43.6217029524579], [-79.5129053059278, 43.621894383041], [-79.5128157836966, 43.6220136077361], [-79.5126016092305, 43.6222467319541], [-79.512547052074, 43.6223629821079], [-79.5125368349113, 43.6224478304773], [-79.5125415395663, 43.6225485106805], [-79.5125764326865, 43.6226699988133], [-79.5127198845644, 43.6230366191617], [-79.5127314328539, 43.6230950639955], [-79.5127345122172, 43.6231841325487], [-79.512706710181, 43.6232585322483], [-79.5126600544169, 43.6232997548541], [-79.5126288101251, 43.6233273206092], [-79.5125609765846, 43.6233615604222], [-79.5124218218904, 43.6234032881332], [-79.5123754575981, 43.6234171823279], [-79.5114369659292, 43.6236306763488]]}"},{"_id":12,"OBJECTID":2519,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-02-18","PROJECT":"Local Road Reconstruction","LOCATION":"HASLEMERE RD&lt;br&gt; From: KAPPELE AVE&lt;br&gt; To: LANGTON AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027 - 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.39372291358, 43.729331976542], [-79.3920647113751, 43.7297043070483]]}"},{"_id":13,"OBJECTID":2954,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Laneway Reconstruction","LOCATION":"[24.90 m E] HURON ST&lt;br&gt; From: [23.80 m N] DUNDAS ST W&lt;br&gt; To: [44.30 m N] DUNDAS ST W ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3958991799977, 43.6539042939077], [-79.3958250734784, 43.6537224620337]]}"},{"_id":14,"OBJECTID":3689,"PROJ_NUM":"TS2023-13-044","LAST_UPDATED_DATE":"2025-08-28","PROJECT":"Local Road Reconstruction","LOCATION":"SACKVILLE PL&lt;br&gt; From: WOODSTOCK PL&lt;br&gt; To: FLAGLER ST ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2025 - Q3 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Newsha Roshani, Engineering and Construction Services","CONTACT_EMAIL":"nroshan@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3647596583441, 43.6659572703185], [-79.3646466638657, 43.6659828713997]]}"},{"_id":15,"OBJECTID":3690,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Laneway Reconstruction","LOCATION":"[40 m S] ST CLAIR AVE W&lt;br&gt; From: [39 m E] LANSDOWNE AVE (TO)&lt;br&gt; To: LANSDOWNE AVE (TO) ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4503959589611, 43.6758632675313], [-79.4499284293042, 43.6759758592464]]}"},{"_id":16,"OBJECTID":3732,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Laneway Reconstruction","LOCATION":"[32 m E] ST CLARENS AVE&lt;br&gt; From: COLLEGE ST (TO)&lt;br&gt; To: [27.80 m N] COLLEGE ST (TO) ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4382658698794, 43.6514385788415], [-79.4383769880856, 43.6517237208411]]}"},{"_id":17,"OBJECTID":3733,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"GLOS RD&lt;br&gt; From: [217 m E] CRENDON DR&lt;br&gt; To: [102 m E] CRENDON DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5710472360338, 43.6461883366375], [-79.5705531345606, 43.6463074246984], [-79.5700184387569, 43.6464403345883], [-79.5696500583489, 43.6465228501257], [-79.5696184821238, 43.6465299174304], [-79.5695556518524, 43.6465332321744], [-79.5695018433243, 43.6465344980888], [-79.5694553119934, 43.6465257770406]]}"},{"_id":18,"OBJECTID":3738,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"CRENDON DR&lt;br&gt; From: RENFORTH DR&lt;br&gt; To: ULVERSTON RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5735472787101, 43.6450960147083], [-79.5734067342066, 43.645183733373], [-79.5726480940779, 43.6456264282527], [-79.5725401743782, 43.6457056368159], [-79.5724136255698, 43.6458069554373], [-79.5722825017378, 43.645928439874], [-79.5721590625895, 43.6460601988693], [-79.5720382815079, 43.6461865462313], [-79.5719765759243, 43.6463008664614], [-79.5719517447579, 43.6463818043856], [-79.5719331878501, 43.6464852597759], [-79.571934293423, 43.6465807185777], [-79.5719553689536, 43.6467076155854], [-79.5719819640141, 43.6468165153791], [-79.5722359350537, 43.6473590385427], [-79.5724221361956, 43.6478042722849], [-79.5724750679686, 43.6478976999113], [-79.5725259658131, 43.6479592729722], [-79.5725810591525, 43.6480151364809], [-79.572626602396, 43.6480563788126], [-79.5726967035134, 43.6481088752199], [-79.57274736223, 43.6481465857148], [-79.5728347010313, 43.6482047869322]]}"},{"_id":19,"OBJECTID":3748,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Laneway Reconstruction","LOCATION":"[37 m N] WOBURN AVE&lt;br&gt; From: LEDBURY ST&lt;br&gt; To: [43 m W] LEDBURY ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4239127572605, 43.7243788422202], [-79.4244787396344, 43.7242666840196]]}"},{"_id":20,"OBJECTID":3754,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"ALLONSIUS DR&lt;br&gt; From: RENFORTH DR&lt;br&gt; To: RENFORTH DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5744237759871, 43.6454488051814], [-79.5744594704086, 43.6453546636253], [-79.5744864647004, 43.6453019610272], [-79.5745135220258, 43.6452300944663], [-79.5745265555738, 43.64514461797], [-79.574536590233, 43.6450598275304], [-79.5745394241968, 43.6449658873912], [-79.574531126229, 43.6448612428788], [-79.5744932061988, 43.6447489124981], [-79.5744387869837, 43.6446055831276], [-79.5741796343683, 43.6439888336521], [-79.574166706919, 43.643939091462], [-79.574167311334, 43.6438863160307], [-79.574215119858, 43.6438361203611], [-79.5743069193835, 43.643796418688], [-79.5746933562852, 43.6437098346937], [-79.5748828258402, 43.6436673952917], [-79.5749952568853, 43.6436529824038], [-79.5750906026741, 43.6436447735729], [-79.5751673461089, 43.6436587022671], [-79.5752199178081, 43.6436816121833], [-79.5752598149424, 43.6437289151354], [-79.5757850794124, 43.6448973870836], [-79.5758012460665, 43.644939223732], [-79.5758181382911, 43.6450060296954], [-79.5758156397722, 43.6450891409958], [-79.5757958671727, 43.6451665478801], [-79.5757736431486, 43.6452265657398], [-79.5755487436262, 43.6456849292658]]}"},{"_id":21,"OBJECTID":3756,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Laneway Reconstruction","LOCATION":"NICHOLSON LANE&lt;br&gt; From: PRINCESS ST&lt;br&gt; To: BERKELEY ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.363853361954, 43.6508503853498], [-79.3665079581504, 43.6502499569073]]}"},{"_id":22,"OBJECTID":3765,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-07-12","PROJECT":"Local Road Rehabilitation","LOCATION":"CARLING AVE&lt;br&gt; From: BLOOR ST W&lt;br&gt; To: IRENE AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2024 - Q2 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Dennis Coronel, Engineering and Construction Services","CONTACT_EMAIL":"dcorone@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4246453518478, 43.6621985657573], [-79.4248081618785, 43.6626166142716], [-79.4248969649302, 43.6628446316204]]}"},{"_id":23,"OBJECTID":3767,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-09-01","PROJECT":"Laneway Reconstruction","LOCATION":"[27.40 m W] BAY ST&lt;br&gt; From: TEMPERANCE ST&lt;br&gt; To: RICHMOND ST W ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2025","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Gabor Szakter, Engineering and Construction Services","CONTACT_EMAIL":"gszakte@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3815384546847, 43.6504649376741], [-79.3817994165711, 43.6510645453407]]}"},{"_id":24,"OBJECTID":3856,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-02-22","PROJECT":"Local Road Rehabilitation","LOCATION":"DOROTHY ST&lt;br&gt; From: HILTZ AVE&lt;br&gt; To: GREENWOOD AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.326923741667, 43.665894202187], [-79.3260210547978, 43.6660953799296]]}"},{"_id":25,"OBJECTID":3975,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-07-22","PROJECT":"Laneway Reconstruction","LOCATION":"[116.70 m W] RONCESVALLES AVE&lt;br&gt; From: GEOFFREY ST&lt;br&gt; To: GRENADIER RD ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4514451805993, 43.6476871556254], [-79.4515951399121, 43.6480977804842], [-79.4517427017002, 43.6485017971034]]}"},{"_id":26,"OBJECTID":3978,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-08-29","PROJECT":"Laneway Reconstruction","LOCATION":"[33.50 m E] EMERSON AVE&lt;br&gt; From: [30.50 m N] WALLACE AVE&lt;br&gt; To: ARMSTRONG AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4419968763231, 43.6632356139409], [-79.4420207671826, 43.6633025150236], [-79.4421819084151, 43.6637535367856]]}"},{"_id":27,"OBJECTID":3982,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-08-29","PROJECT":"Laneway Reconstruction","LOCATION":"[30.50 m W] OSSINGTON AVE&lt;br&gt; From: BADEN ST&lt;br&gt; To: [30.20 m N] BADEN ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4216355315554, 43.6500756097822], [-79.421591252616, 43.6500841307132], [-79.4217053489407, 43.6503902461918]]}"},{"_id":28,"OBJECTID":4033,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-09-27","PROJECT":"Laneway Reconstruction","LOCATION":"[28.60 m W] YORK ST&lt;br&gt; From: [52 m S] RICHMOND ST W&lt;br&gt; To: RICHMOND ST W ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3851110950526, 43.6503416018767], [-79.3848953663775, 43.64980495776]]}"},{"_id":29,"OBJECTID":4101,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Laneway Reconstruction","LOCATION":"[25 m N] ADELAIDE ST W&lt;br&gt; From: DUNCAN ST&lt;br&gt; To: [27.40 m W] DUNCAN ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3888050908619, 43.6485070685875], [-79.3892446723688, 43.6484187418791]]}"},{"_id":30,"OBJECTID":4122,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"MACPHERSON AVE&lt;br&gt; From: SPADINA RD (TO)&lt;br&gt; To: WALMER RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4074931331621, 43.675869175016], [-79.4080897418853, 43.6757501997433], [-79.4086770688533, 43.6756331312206]]}"},{"_id":31,"OBJECTID":4166,"PROJ_NUM":"TS2023-14-293","LAST_UPDATED_DATE":"2023-09-25","PROJECT":"Laneway Reconstruction","LOCATION":"[26.20 m E] LOGAN AVE&lt;br&gt; From: LANGLEY AVE&lt;br&gt; To: RIVERDALE AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Newsha Roshani, Engineering and Construction Services","CONTACT_EMAIL":"nroshan@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3456804918087, 43.6694958153715], [-79.3458495644248, 43.6699107707335], [-79.3460254911172, 43.6703425495291]]}"},{"_id":32,"OBJECTID":4192,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-05-05","PROJECT":"Laneway Reconstruction","LOCATION":"[30 m E] WINNIFRED AVE&lt;br&gt; From: [33.50 m N] EASTERN AVE&lt;br&gt; To: [35.10 m S] QUEEN ST E ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Shahid Virk, Engineering and Construction Services","CONTACT_EMAIL":"svirk@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3348009845398, 43.6596999376606], [-79.3356450466796, 43.6616500351567]]}"},{"_id":33,"OBJECTID":4988,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-12","PROJECT":"Major Road Rehabilitation","LOCATION":"DUPONT ST&lt;br&gt; From: MADISON AVE&lt;br&gt; To: [21.30 m E] SPADINA RD (TO) ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2027 - Q3 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Shahid Virk, Engineering and Construction Services","CONTACT_EMAIL":"svirk@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4059769610946, 43.6751085685439], [-79.406863209931, 43.6749142174187]]}"},{"_id":34,"OBJECTID":5014,"PROJ_NUM":"TS2024-07-026","LAST_UPDATED_DATE":"2024-04-25","PROJECT":"Major Road Rehabilitation","LOCATION":"YORK GATE BLVD&lt;br&gt; From: FINCH AVE (N YK)&lt;br&gt; To: [90 m S] HULLMAR DR ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q4 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Tazeen Fatema, Engineering and Construction Services","CONTACT_EMAIL":"tfatema@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5207024203373, 43.756732130905], [-79.5214560787221, 43.7582764974333], [-79.5214689045848, 43.758303507598], [-79.5214813330506, 43.7583304998336], [-79.5214933765473, 43.7583575011413], [-79.5215042526885, 43.7583845116684], [-79.521514357253, 43.758407003742], [-79.5215236702495, 43.7584385061552], [-79.5215322224784, 43.7584610075205], [-79.521539993941, 43.7584880096273], [-79.5215469970569, 43.7585195124736], [-79.5215532145609, 43.758542014277], [-79.5215586529131, 43.7585735174173], [-79.5215637046697, 43.7586005200349], [-79.5215672040715, 43.7586275229452], [-79.5215707283142, 43.7586545258505], [-79.5215726753615, 43.7586815290533], [-79.5215742374248, 43.7587085323286], [-79.5215746321132, 43.7587355358241], [-79.521574655852, 43.7587670399844], [-79.5215738691275, 43.7587895431077], [-79.5215723405014, 43.7588210475607], [-79.521570027865, 43.7588480515667], [-79.5215665354284, 43.758875055795], [-79.5215622730214, 43.7589020781708], [-79.5215576256106, 43.7589290646141], [-79.5215522098462, 43.7589605788004], [-79.5215456234616, 43.7589830830162], [-79.5215382687114, 43.7590100879711], [-79.5215301315601, 43.7590370930727], [-79.5215215969946, 43.7590640982485], [-79.5215022006568, 43.7591046072515], [-79.5214816477205, 43.7591406248748], [-79.5214606973454, 43.7591766245665], [-79.5214389769707, 43.7592126333997], [-79.5214161016058, 43.7592486514461], [-79.5213928271984, 43.7592801599667], [-79.5213687719734, 43.7593161782241], [-79.5213439467367, 43.7593521876188], [-79.5213179648992, 43.7593836876279], [-79.5212915748053, 43.7594196973027], [-79.5212640421274, 43.7594557071837], [-79.5212361104182, 43.7594872255388], [-79.5212073962757, 43.7595187350309], [-79.5211779137085, 43.7595547452523], [-79.5211476719571, 43.759586255012], [-79.521116635356, 43.7596177739116], [-79.5210961647338, 43.7596418018641], [-79.5210859852883, 43.7596537753232], [-79.5210561160116, 43.7596852849895], [-79.5210274141022, 43.7597168034341], [-79.520999098726, 43.7597528133935], [-79.5209715533009, 43.7597888232043], [-79.5209443928356, 43.7598248329376], [-79.5209184105871, 43.7598563418546], [-79.5208928024515, 43.7598923512912], [-79.5208679766913, 43.759928360579], [-79.5208439333079, 43.7599643697185], [-79.520836460855, 43.7599755415553], [-79.5208198774765, 43.7600003788549], [-79.5208039499327, 43.760018384131], [-79.5207888311836, 43.7600408898518], [-79.5207740834411, 43.760058894909], [-79.5207605030923, 43.7600768997522], [-79.5207473356785, 43.7601039057066], [-79.5207349227148, 43.7601219103348], [-79.5207236662847, 43.7601444243469], [-79.5207128072572, 43.7601669292846], [-79.5207027290792, 43.7601849334859], [-79.5206934100177, 43.7602074381427], [-79.5206852831929, 43.7602299425828], [-79.5206775304916, 43.7602569565496], [-79.5206705446696, 43.7602749511871], [-79.5206647278023, 43.7602974552078], [-79.5206592959266, 43.7603199591585], [-79.5206550438768, 43.7603424718967], [-79.5206515493909, 43.7603649664956], [-79.5206484538689, 43.760391970617], [-79.5206465366249, 43.7604144739317], [-79.5206453769537, 43.7604369771095], [-79.520645243208, 43.760445312233], [-79.5206700571445, 43.7605543211263], [-79.5206867284808, 43.7606399644048]]}"},{"_id":35,"OBJECTID":5043,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"DANESWOOD RD&lt;br&gt; From: DAWLISH AVE&lt;br&gt; To: GLENALLAN RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3816147983447, 43.7231452442143], [-79.3816913440446, 43.7235596147733], [-79.3817351408656, 43.7236940486788], [-79.3818625936904, 43.7239984765425], [-79.3819177659893, 43.7241363696007]]}"},{"_id":36,"OBJECTID":5074,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-12","PROJECT":"Major Road Rehabilitation","LOCATION":"KEELE ST&lt;br&gt; From: FINCH AVE W&lt;br&gt; To: STEELES AVE W ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2028 - Q4 2029","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Adel Roufail, Engineering and Construction Services","CONTACT_EMAIL":"aroufai@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4910534106917, 43.7635021618319], [-79.4916590072426, 43.7657154539496], [-79.4917365780998, 43.7660340923094], [-79.4918108229598, 43.76633904857], [-79.4920120363848, 43.7671656499246], [-79.4920222654122, 43.7672076501293], [-79.492047900111, 43.7673129206751], [-79.493239882162, 43.7719900697569], [-79.4939610215053, 43.7748195549116], [-79.4940388244767, 43.77516887618], [-79.4940486709766, 43.7752130724083], [-79.4940587288638, 43.7752553153938], [-79.4945741214528, 43.7774193374244], [-79.4946234878624, 43.7775764820146], [-79.494644673321, 43.7776642533217], [-79.4946494140464, 43.7777179724668], [-79.4946566120021, 43.7777997663438], [-79.4946727146158, 43.7779103103387], [-79.494673539604, 43.7779930400352], [-79.4946836080556, 43.7780664809643], [-79.4946870671965, 43.7781438190865], [-79.4946807377352, 43.7782137307961], [-79.4946841951784, 43.778310286391], [-79.4946792674925, 43.7784027370656], [-79.4946799162283, 43.7785119301534], [-79.4946774356893, 43.7786062171749], [-79.4946752401325, 43.7787088392807], [-79.4946483309748, 43.7788578882043], [-79.4945988005041, 43.7789927862305], [-79.4945677570928, 43.7791091067226], [-79.4945386905206, 43.7792069659241], [-79.49451858256, 43.7792871832778], [-79.4944932934262, 43.7793745742997], [-79.4944589457507, 43.7794832346104], [-79.4944443892125, 43.7795802213718], [-79.4944246656825, 43.7796651553286], [-79.4944073020011, 43.779755589103], [-79.4943710517996, 43.779879083193], [-79.4943572643785, 43.7799855211886], [-79.4943428945869, 43.7800752620069], [-79.4943343861934, 43.7801901253394], [-79.4943094544153, 43.7803014774016], [-79.4943066133911, 43.7803910297595], [-79.494303645952, 43.7805034630471], [-79.494314355508, 43.7806284176209], [-79.4943282711087, 43.7807454513334], [-79.4943429597538, 43.7808334833586], [-79.4943600083897, 43.7809269972003], [-79.4943742215297, 43.7810523839874], [-79.4944003842973, 43.7811979159398], [-79.4944274198736, 43.7813108097397], [-79.4944517339498, 43.7814327315563], [-79.4945063595238, 43.7815790749568]]}"},{"_id":37,"OBJECTID":5108,"PROJ_NUM":"TS2023-13-001","LAST_UPDATED_DATE":"2024-04-25","PROJECT":"Major Road Reconstruction","LOCATION":"[N] GERRARD ST E [BRANCH]&lt;br&gt; From: GERRARD ST E&lt;br&gt; To: PARLIAMENT ST ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2027 - Q1 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marilia Cimini, Engineering and Construction Services","CONTACT_EMAIL":"mcimini@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3681759569219, 43.6621129637347], [-79.3671914128856, 43.6623343372957]]}"},{"_id":38,"OBJECTID":5273,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-16","PROJECT":"Local Road Rehabilitation","LOCATION":"SEATON ST&lt;br&gt; From: DUNDAS ST E&lt;br&gt; To: GERRARD ST E ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Angela Au, Engineering and Construction Services","CONTACT_EMAIL":"aau2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3695116514755, 43.6586590331536], [-79.3696886692746, 43.6590910476874], [-79.3701539004833, 43.6602263587056], [-79.3705442807723, 43.6611790626332], [-79.3707022076572, 43.66156440883]]}"},{"_id":39,"OBJECTID":5338,"PROJ_NUM":"TS2023-12-106","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Rehabilitation","LOCATION":"WINONA DR&lt;br&gt; From: [9.80 m N] BARRIE AVE&lt;br&gt; To: WATFORD AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2024 - Q3 2024","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4328154497888, 43.6808080444588], [-79.4328744645082, 43.6808395027121], [-79.4329150743804, 43.6808701670208], [-79.4329423427068, 43.680908501609], [-79.4329795684655, 43.6809709925509], [-79.4332738108474, 43.6816785147964]]}"},{"_id":40,"OBJECTID":5395,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-10-28","PROJECT":"Laneway Reconstruction","LOCATION":"[40.20 m S] INNES AVE&lt;br&gt; From: HABIBI LANE&lt;br&gt; To: [40.2 m N] NORMAN AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Amran Durrani, Engineering and Construction Services","CONTACT_EMAIL":"adurran2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4566428130542, 43.6780566566725], [-79.4576392553085, 43.6804243672664]]}"},{"_id":41,"OBJECTID":5867,"PROJ_NUM":"TS2023-06_07-301","LAST_UPDATED_DATE":"2024-06-21","PROJECT":"Local Road Reconstruction","LOCATION":"SENTINEL RD&lt;br&gt; From: SHEPPARD AVE W&lt;br&gt; To: STILECROFT DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2024 - Q4 2025","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4918501582177, 43.7436491517555], [-79.4919846643781, 43.7439762473666], [-79.4919899394016, 43.7439890834666], [-79.4922405739252, 43.7445986178833], [-79.4922802047787, 43.744702557565], [-79.4923030002387, 43.7448018874779], [-79.4923257833592, 43.7449012083826], [-79.4923445013373, 43.7450410704662], [-79.4923770478825, 43.7452049757021], [-79.4924007103257, 43.7453240362997], [-79.4924013431428, 43.7453272407729], [-79.4925168772557, 43.7459087536129], [-79.4925853317996, 43.7469846546351], [-79.4926105768129, 43.7470666302759], [-79.4926272689012, 43.7471325021969], [-79.4926568590542, 43.7472206979404], [-79.4932497410605, 43.7486062813022], [-79.493603490296, 43.749357623262], [-79.4938019638052, 43.7497105624262], [-79.4941939982246, 43.7504412017153]]}"},{"_id":42,"OBJECTID":6024,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-04-11","PROJECT":"Laneway Reconstruction","LOCATION":"CHESTNUT LANE&lt;br&gt; From: [42 m S] CHESTNUT HILLS CRES&lt;br&gt; To: [66 m S] CHESTNUT HILLS CRES ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027 - 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Angela Au, Engineering and Construction Services","CONTACT_EMAIL":"aau2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.526026898589, 43.6527792115145], [-79.5263376062108, 43.6529222439307]]}"},{"_id":43,"OBJECTID":6303,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-08-30","PROJECT":"Local Road Reconstruction","LOCATION":"DONALD AVE&lt;br&gt; From: SILVERTHORN AVE&lt;br&gt; To: KANE AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Matthew McAinsh, Engineering and Construction Services","CONTACT_EMAIL":"mmcains@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4665492462384, 43.6862895144235], [-79.4678915090992, 43.6859965108086], [-79.4681531244822, 43.6859634141858]]}"},{"_id":44,"OBJECTID":6385,"PROJ_NUM":"TS2023-11-436","LAST_UPDATED_DATE":"2025-09-05","PROJECT":"Local Road Reconstruction","LOCATION":"BALDWIN ST&lt;br&gt; From: KENSINGTON AVE (TO)&lt;br&gt; To: AUGUSTA AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4007089263197, 43.6547691742142], [-79.4015134758732, 43.6546146958575], [-79.4020351709196, 43.6545084150726]]}"},{"_id":45,"OBJECTID":6401,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"CARLTON ST&lt;br&gt; From: DERMOTT PL&lt;br&gt; To: SACKVILLE ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Jessica Orjuela, Engineering and Construction Services","CONTACT_EMAIL":"jorjuel@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3665810047291, 43.6648000744724], [-79.366533006165, 43.6648056892838], [-79.366349067947, 43.664846520475], [-79.3663342307839, 43.6648498246203], [-79.3650544592627, 43.6651339514473]]}"},{"_id":46,"OBJECTID":6446,"PROJ_NUM":"TS2024-10_11-027","LAST_UPDATED_DATE":"2025-03-19","PROJECT":"Major Road Rehabilitation","LOCATION":"[E] UNIVERSITY AVE [BRANCH]&lt;br&gt; From: EDWARD ST&lt;br&gt; To: ELM ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2027 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Newsha Roshani, Engineering and Construction Services","CONTACT_EMAIL":"nroshan@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3884527438773, 43.6555123741572], [-79.3885321836998, 43.655702218154], [-79.3888195268667, 43.6563725675911]]}"},{"_id":47,"OBJECTID":6502,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2025-08-21","PROJECT":"Local Road Reconstruction","LOCATION":"ST LEONARDS AVE&lt;br&gt; From: LEWES CRES&lt;br&gt; To: BAYVIEW AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3840849904893, 43.7247559652186], [-79.3821241676272, 43.7251647406227], [-79.3811784960871, 43.7253741475065], [-79.3811055684622, 43.7253902919103], [-79.3802036347488, 43.7255848031466]]}"},{"_id":48,"OBJECTID":6525,"PROJ_NUM":"TS2023-13-139","LAST_UPDATED_DATE":"2023-09-26","PROJECT":"Laneway Reconstruction","LOCATION":"CALLAGHAN LANE&lt;br&gt; From: BERKELEY ST&lt;br&gt; To: PARLIAMENT ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Newsha Roshani, Engineering and Construction Services","CONTACT_EMAIL":"nroshan@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3675321846505, 43.6595666125577], [-79.3661821799616, 43.6598516520255]]}"},{"_id":49,"OBJECTID":6531,"PROJ_NUM":"TS2023-11-436","LAST_UPDATED_DATE":"2025-09-05","PROJECT":"Local Road Reconstruction","LOCATION":"BALDWIN ST&lt;br&gt; From: SPADINA AVE&lt;br&gt; To: [98 m W] SPADINA AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3989262111511, 43.6551380265815], [-79.4002782277281, 43.6548582997671]]}"},{"_id":50,"OBJECTID":6532,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Reconstruction","LOCATION":"RIPLEY AVE&lt;br&gt; From: [E-W] RIPLEY AVE [LEG]&lt;br&gt; To: ORMSKIRK AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"&lt;Null&gt; Transportation Roads State of Good Repair","CONTACT_EMAIL":"RoadSOGR@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4745930690629, 43.637182047426], [-79.4745960953706, 43.6372062168095], [-79.4746219613309, 43.6372650825918], [-79.4749660380028, 43.6377761758923], [-79.475268822514, 43.6381989826478], [-79.4756074738367, 43.6385754751277], [-79.4759083900822, 43.6388873377308], [-79.4761854885928, 43.6391341506009]]}"},{"_id":51,"OBJECTID":6536,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Reconstruction","LOCATION":"ROCHESTER AVE&lt;br&gt; From: ST IVES CRES&lt;br&gt; To: LEWES CRES ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3894553318233, 43.7246704896137], [-79.3853886016389, 43.7255219263152]]}"},{"_id":52,"OBJECTID":6583,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Reconstruction","LOCATION":"HIGHLAND AVE&lt;br&gt; From: [45.70 m E] HIGHLAND GDNS&lt;br&gt; To: [289.60 m E] HIGHLAND GDNS ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.381060809161, 43.6824335649941], [-79.3809993061724, 43.6824251567696], [-79.3809520785339, 43.6824108225156], [-79.3808891197104, 43.6823859853254], [-79.3808051802476, 43.6823458870075], [-79.3807435570354, 43.6823105736047], [-79.3806727658645, 43.6822638189348], [-79.3805901640981, 43.6822122991922], [-79.3805023349146, 43.682151232536], [-79.3804302653271, 43.6820863837447], [-79.3803713069677, 43.68202725546], [-79.3803293906674, 43.6819805307901], [-79.3802704135539, 43.6819309348205], [-79.3802101001039, 43.6818984849162], [-79.3801471459216, 43.6818717390422], [-79.3800343125984, 43.681842096383], [-79.3799621147593, 43.6818420115889], [-79.3798544634194, 43.6818447609093], [-79.3797704207851, 43.6818570493474], [-79.3795394968827, 43.6819026048997], [-79.3792991268231, 43.6819516965274], [-79.3792281882913, 43.6819606229112], [-79.3791696674581, 43.681956060412], [-79.3791022559746, 43.6819379865144], [-79.3790430635348, 43.6819220095784], [-79.378986686346, 43.6818876549159], [-79.378939537252, 43.6818285383921], [-79.3788936981145, 43.6817780014851], [-79.3788412682325, 43.6817360268218], [-79.3787743687637, 43.6817102301482], [-79.3786654345064, 43.6817034446003], [-79.3785435132965, 43.6817156199135]]}"},{"_id":53,"OBJECTID":6616,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"COPPERFIELD RD&lt;br&gt; From: MANSE RD&lt;br&gt; To: [550 m E] MANSE RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q4 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.1717492025535, 43.7598266896592], [-79.1702954390999, 43.7601015599199], [-79.169086453548, 43.7603231135405], [-79.1678579609302, 43.7605626090377], [-79.1666351856069, 43.7607481009138], [-79.1658636171885, 43.7608898847661], [-79.1645153900769, 43.7611559797411], [-79.1640918013513, 43.7612537575955], [-79.1640467313644, 43.7612626263076], [-79.1636322800481, 43.7613407707396], [-79.1634380210971, 43.7613774097512], [-79.1632032891743, 43.7614202930105], [-79.1627937653417, 43.7614963786478], [-79.1627118031289, 43.7615107457182], [-79.162585225103, 43.761519382294], [-79.1624423530227, 43.7615279616072], [-79.1624092385995, 43.7615264866228], [-79.1621883639978, 43.7615166618192]]}"},{"_id":54,"OBJECTID":6620,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-07-18","PROJECT":"Local Road Rehabilitation","LOCATION":"HAZEL AVE&lt;br&gt; From: FERNWOOD PARK AVE&lt;br&gt; To: BEECH AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Tony Rodrigues, Engineering and Construction Services","CONTACT_EMAIL":"trodrig@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2884618675573, 43.6714813967029], [-79.2879610368349, 43.6716000333949], [-79.2872199949479, 43.6717511208522]]}"},{"_id":55,"OBJECTID":6675,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-08-14","PROJECT":"Major Road Rehabilitation","LOCATION":"GREENWOOD AVE&lt;br&gt; From: [34.60 m N] MILVERTON BLVD&lt;br&gt; To: SPRINGDALE BLVD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Promil Sarkar, Engineering and Construction Services","CONTACT_EMAIL":"psarkar@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3339042258784, 43.6850841471032], [-79.334063761933, 43.6854622175555]]}"},{"_id":56,"OBJECTID":6774,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Local Road Rehabilitation","LOCATION":"WALES AVE&lt;br&gt; From: BELLEVUE AVE&lt;br&gt; To: LEONARD AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4029094168243, 43.6530886840643], [-79.403221476101, 43.6530196292322], [-79.4033423468029, 43.6529970300757], [-79.4042150511109, 43.652833894951]]}"},{"_id":57,"OBJECTID":6787,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Laneway Reconstruction","LOCATION":"[79 m N] O&apos;CONNOR DR&lt;br&gt; From: HOPEDALE AVE&lt;br&gt; To: [35 m W] HOPEDALE AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3525191512779, 43.6936711564173], [-79.3531025293583, 43.6935649092551]]}"},{"_id":58,"OBJECTID":6816,"PROJ_NUM":"TS2023-11-186","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Local Road Reconstruction","LOCATION":"GLENROSE AVE&lt;br&gt; From: CLIFTON RD&lt;br&gt; To: [E] GLENROSE AVE [END] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3839793741641, 43.6892205415758], [-79.3832170227108, 43.6893831118357]]}"},{"_id":59,"OBJECTID":6817,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Laneway Reconstruction","LOCATION":"[87.20 m N] DAVENPORT RD&lt;br&gt; From: GREENLAW AVE&lt;br&gt; To: ST CLARENS AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4464401812318, 43.6729095345887], [-79.4464681359274, 43.6728510030618], [-79.4465036880802, 43.6728113868685], [-79.4465549637254, 43.6727870172607], [-79.4471822098812, 43.6726508216981], [-79.4478080640224, 43.6725149190985]]}"},{"_id":60,"OBJECTID":6920,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2025-08-21","PROJECT":"Local Road Reconstruction","LOCATION":"ST LEONARDS AVE&lt;br&gt; From: [155 m W] MILDENHALL RD&lt;br&gt; To: LEWES CRES ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3868376928876, 43.7241643264962], [-79.3849823856266, 43.7245527055543], [-79.3840849904893, 43.7247559652186]]}"},{"_id":61,"OBJECTID":7341,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-02-18","PROJECT":"Local Road Reconstruction","LOCATION":"LANGTON AVE&lt;br&gt; From: HASLEMERE RD&lt;br&gt; To: BRAESIDE RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027 - 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3920647113751, 43.7297043070483], [-79.392398244456, 43.7305233017995]]}"},{"_id":62,"OBJECTID":7623,"PROJ_NUM":"TS2024-02-033","LAST_UPDATED_DATE":"2026-01-14","PROJECT":"Major Road Reconstruction","LOCATION":"RATHBURN RD&lt;br&gt; From: MILL RD&lt;br&gt; To: DEAD END ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Brian Nolan, Engineering and Construction Services","CONTACT_EMAIL":"bnolan3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5900630194625, 43.6455117700085], [-79.5902383795473, 43.6453794556221], [-79.59041793303, 43.6452501351028], [-79.590601556037, 43.6451238625376], [-79.5907616613967, 43.6449710813136], [-79.5909144095462, 43.6448143721142], [-79.591059602473, 43.6446539241551], [-79.5911205103765, 43.6445945655963], [-79.5911747444207, 43.6445318728191], [-79.591221958175, 43.6444662601725], [-79.5912618671904, 43.6443981419552]]}"},{"_id":63,"OBJECTID":7714,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Laneway Reconstruction","LOCATION":"[44.50 m N] DUNDAS ST W&lt;br&gt; From: [95.40 m E] HURON ST&lt;br&gt; To: HURON ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3958991799977, 43.6539042939077], [-79.3963577254249, 43.6538134548248]]}"},{"_id":64,"OBJECTID":7840,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-11","PROJECT":"Laneway Reconstruction","LOCATION":"Alan Borovoy Lane&lt;br&gt; From: [39.3 m E] GRACE ST (TO)&lt;br&gt; To: JERSEY AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4152006202104, 43.6554195698455], [-79.4164095679113, 43.6585765587381], [-79.4163697556904, 43.658595495459]]}"},{"_id":65,"OBJECTID":8071,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Laneway Reconstruction","LOCATION":"[34 m N] FLORENCE AVE&lt;br&gt; From: [54 m E] EILEEN AVE&lt;br&gt; To: EILEEN AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4949862032113, 43.669597367554], [-79.4946385497765, 43.6699354237542], [-79.4945038551906, 43.6700663867132]]}"},{"_id":66,"OBJECTID":8160,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-19","PROJECT":"Local Road Reconstruction","LOCATION":"RIDELLE AVE&lt;br&gt; From: OLD PARK RD&lt;br&gt; To: OVERDALE RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4329630666137, 43.7058561014957], [-79.4340824128994, 43.705597533802]]}"},{"_id":67,"OBJECTID":8174,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-19","PROJECT":"Local Road Reconstruction","LOCATION":"RIDELLE AVE&lt;br&gt; From: MARWOOD RD&lt;br&gt; To: FERNWOOD RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4352586991205, 43.705352876365], [-79.4364077221742, 43.7051021787966]]}"},{"_id":68,"OBJECTID":8175,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-19","PROJECT":"Local Road Reconstruction","LOCATION":"RIDELLE AVE&lt;br&gt; From: OVERDALE RD&lt;br&gt; To: MARWOOD RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4340824128994, 43.705597533802], [-79.4352586991205, 43.705352876365]]}"},{"_id":69,"OBJECTID":8222,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-16","PROJECT":"Major Road Reconstruction","LOCATION":"DON MILLS RD&lt;br&gt; From: [230m S]OVERLEA BLVD&lt;br&gt; To: OVERLEA BLVD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2026 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Candice Chan, Engineering and Construction Services","CONTACT_EMAIL":"cchanb@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3337008164375, 43.7075795794753], [-79.3337275259913, 43.7077431983922], [-79.333752432569, 43.7078723128133], [-79.3337693340653, 43.7080020636761], [-79.3337815843693, 43.7081401069393], [-79.3338014310737, 43.7082728054886], [-79.3338195219395, 43.7083673721083], [-79.3338403777585, 43.7084492599566], [-79.3338437318838, 43.7085062698606], [-79.3338657533806, 43.7085794641723], [-79.3339195939536, 43.7087862115117], [-79.3339800209615, 43.7089625441027], [-79.334036937781, 43.709138475504], [-79.3341004313363, 43.7093369735907], [-79.3342038805803, 43.7095852975964], [-79.3343136679073, 43.7098484647707], [-79.3343949848033, 43.7099964463986]]}"},{"_id":70,"OBJECTID":8243,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"ENDWOOD RD&lt;br&gt; From: HERNSHAW CRES&lt;br&gt; To: CARSBROOKE RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5744847640319, 43.6473063416176], [-79.5750229731508, 43.6471893769751], [-79.5751702051006, 43.6471444264485], [-79.5752968173529, 43.6471052861951], [-79.5754251607403, 43.6470430381521], [-79.5755554509572, 43.6469815447924], [-79.5756538246005, 43.6469224217669], [-79.5757335629652, 43.6468698549968], [-79.5758793483591, 43.6467403006679]]}"},{"_id":71,"OBJECTID":8269,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-08-18","PROJECT":"Laneway Reconstruction","LOCATION":"NUNES LANE&lt;br&gt; From: MC FARLAND AVE&lt;br&gt; To: VIA ITALIA ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4425101582618, 43.673247569697], [-79.4437645179198, 43.6729581349581]]}"},{"_id":72,"OBJECTID":8284,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-03-24","PROJECT":"Major Road Reconstruction","LOCATION":"BLOOR ST W&lt;br&gt; From: BEDFORD RD&lt;br&gt; To: DEVONSHIRE PL ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2023 - Q2 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Gabor Szakter, Engineering and Construction Services","CONTACT_EMAIL":"gszakte@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2023","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3973807918684, 43.668033224743], [-79.3983645780234, 43.6678316276818]]}"},{"_id":73,"OBJECTID":8367,"PROJ_NUM":"TS2023-09-011","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"ASCOT AVE&lt;br&gt; From: BOON AVE&lt;br&gt; To: EARLSCOURT AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4471291691785, 43.6794463081232], [-79.448338203112, 43.67917415708]]}"},{"_id":74,"OBJECTID":8385,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-05-19","PROJECT":"Local Road Reconstruction","LOCATION":"GIBSON ST&lt;br&gt; From: DUFFERIN ST&lt;br&gt; To: WESTMOUNT AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4470016736143, 43.6905738260586], [-79.4470617963166, 43.6905918925185], [-79.4471245094151, 43.6905842794432], [-79.4471920800011, 43.6905684413916], [-79.4480879106436, 43.6903913731468]]}"},{"_id":75,"OBJECTID":8395,"PROJ_NUM":"TS2023-20-173","LAST_UPDATED_DATE":"2026-03-19","PROJECT":"Local Road Reconstruction","LOCATION":"PARKCREST DR&lt;br&gt; From: HILL CRES&lt;br&gt; To: 126 m S KINGSTON RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q2 2027 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Gabor Szakter, Engineering and Construction Services","CONTACT_EMAIL":"gszakte@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2160018161236, 43.7326164759918], [-79.2163601434489, 43.7334635169585], [-79.2168030092963, 43.7344996658417], [-79.2168560108698, 43.7346168040492], [-79.2168920709086, 43.7347068966001], [-79.2169281910265, 43.7347789868414], [-79.2169760101483, 43.7348421138179], [-79.2170331397785, 43.7349052548225], [-79.2170709813427, 43.7349413623901], [-79.217120492043, 43.7349774808229], [-79.2171629889811, 43.7350135818786], [-79.2172542146828, 43.7350858173603], [-79.2173153325771, 43.7351219644201], [-79.2174346168745, 43.7351672564791], [-79.2175228665972, 43.7352124807211], [-79.2176344472135, 43.7352487613112], [-79.2177204355849, 43.7352759683683], [-79.2178103219581, 43.7353031939855], [-79.2178677363071, 43.735303326717], [-79.217939116299, 43.7353034938839], [-79.2180096296964, 43.7353216703135], [-79.218097279361, 43.7353308787414], [-79.2181763758251, 43.7353400750145], [-79.218236893647, 43.7353402242139], [-79.2183215118655, 43.7353314225529], [-79.2184014623875, 43.7353226183309], [-79.2185365604216, 43.7353049396433], [-79.2186973276573, 43.73526933053], [-79.2188441836033, 43.7352246857499], [-79.2189389362038, 43.7352068983363], [-79.219049277768, 43.7351711647208]]}"},{"_id":76,"OBJECTID":8483,"PROJ_NUM":"TS2023-09-011","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"ASCOT AVE&lt;br&gt; From: ST CLAIR GDNS&lt;br&gt; To: BOON AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4459694918064, 43.6796988558402], [-79.446508364338, 43.6795814980961], [-79.4471291691785, 43.6794463081232]]}"},{"_id":77,"OBJECTID":8499,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"CORTLEIGH BLVD&lt;br&gt; From: AVENUE RD&lt;br&gt; To: MONA DR ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4117758992924, 43.7130486490807], [-79.4135913428226, 43.7126674822445], [-79.4156786708608, 43.7122280062308], [-79.4162892463394, 43.7120934360664]]}"},{"_id":78,"OBJECTID":8503,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-05-19","PROJECT":"Local Road Reconstruction","LOCATION":"HOPEWELL AVE&lt;br&gt; From: Jimmy Wisdom Way&lt;br&gt; To: DUFFERIN ST ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4485519819516, 43.6993205124111], [-79.4500749112928, 43.6990174843923], [-79.4502373228659, 43.6989758432608], [-79.4503977100484, 43.6989214552011], [-79.4505394822046, 43.6988579765666], [-79.4506672631372, 43.6988203344061], [-79.450925662867, 43.6987636295258], [-79.4513054333962, 43.6986934739017]]}"},{"_id":79,"OBJECTID":9197,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Laneway Reconstruction","LOCATION":"[30.50 m E] JONES AVE&lt;br&gt; From: [23.20 m N] QUEEN ST E&lt;br&gt; To: [115.10 m N] QUEEN ST E ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2023 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Jessica Orjuela, Engineering and Construction Services","CONTACT_EMAIL":"jorjuel@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2023","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3324316797541, 43.6631086278506], [-79.332737304553, 43.6638731180819]]}"},{"_id":80,"OBJECTID":9304,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-12","PROJECT":"Major Road Rehabilitation","LOCATION":"DUPONT ST&lt;br&gt; From: ST GEORGE ST (TO)&lt;br&gt; To: HURON ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2027 - Q3 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Shahid Virk, Engineering and Construction Services","CONTACT_EMAIL":"svirk@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4036003140794, 43.6755947756571], [-79.4041738533477, 43.6754803470269], [-79.4047887879525, 43.6753576507846]]}"},{"_id":81,"OBJECTID":9351,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-05","PROJECT":"Laneway Reconstruction","LOCATION":"[31.40 m N] ST CLAIR AVE W&lt;br&gt; From: SILVERTHORN AVE&lt;br&gt; To: CLOVERDALE RD ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2025 - Q4 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Matthew McAinsh, Engineering and Construction Services","CONTACT_EMAIL":"mmcains@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4601960765694, 43.6746117487365], [-79.4616994535068, 43.6742792673867]]}"},{"_id":82,"OBJECTID":9383,"PROJ_NUM":"TS2023-12-009","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Rehabilitation","LOCATION":"ARCHER RD&lt;br&gt; From: BROWSIDE AVE&lt;br&gt; To: SPADINA RD (TO) ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2024 - Q3 2024","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4150224213017, 43.6962829755516], [-79.4157924511157, 43.6960867232343]]}"},{"_id":83,"OBJECTID":9405,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"ROTHMERE DR&lt;br&gt; From: BRAESIDE RD&lt;br&gt; To: MILDENHALL RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3902974325337, 43.728442046429], [-79.3902137740732, 43.7284405619134], [-79.3886777086639, 43.7287698536664], [-79.3885095242974, 43.7288058117051], [-79.3883398247123, 43.7288421280654], [-79.3881624247943, 43.7288873928696], [-79.3879871415136, 43.7289490237201], [-79.3878278974914, 43.7290094008682], [-79.3868903124324, 43.7293062828007]]}"},{"_id":84,"OBJECTID":9458,"PROJ_NUM":"TS2023-13-001","LAST_UPDATED_DATE":"2024-04-25","PROJECT":"Major Road Reconstruction","LOCATION":"GERRARD ST E&lt;br&gt; From: CENTRAL HOSPITAL LANE&lt;br&gt; To: SEATON ST ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2027 - Q1 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marilia Cimini, Engineering and Construction Services","CONTACT_EMAIL":"mcimini@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3714387971841, 43.6614023333006], [-79.3707022076572, 43.66156440883]]}"},{"_id":85,"OBJECTID":9531,"PROJ_NUM":"TS2024-09-008","LAST_UPDATED_DATE":"2024-04-05","PROJECT":"Major Road Reconstruction","LOCATION":"DUFFERIN ST&lt;br&gt; From: DUPONT ST&lt;br&gt; To: GEARY AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2024 - Q3 2025","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Yang (Seamus) Liu, Engineering and Construction Services","CONTACT_EMAIL":"sliu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4390359264614, 43.668464812907], [-79.439279081108, 43.6689836980941], [-79.4392895736509, 43.6690064950388], [-79.4394758299351, 43.66941121265], [-79.4395193759978, 43.6695390635977]]}"},{"_id":86,"OBJECTID":9541,"PROJ_NUM":"TS2023-15-290","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"[E] WANLESS CRES [BRANCH]&lt;br&gt; From: BUCKINGHAM AVE&lt;br&gt; To: LAWRENCE AVE E ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3898692267705, 43.7268063976698], [-79.3898606732866, 43.7268139414683], [-79.3898435033766, 43.7268295060684], [-79.3898263219364, 43.7268445845878], [-79.3898086785103, 43.7268611478637], [-79.3897915132128, 43.7268809520442], [-79.389776690857, 43.7269023787044], [-79.3897282049946, 43.7269650975817], [-79.3896618779833, 43.7270370344883], [-79.38961405376, 43.7271110865146], [-79.3895651232925, 43.7272061823481], [-79.3895301411238, 43.7273029568697], [-79.3895110709689, 43.7273865509452], [-79.3895042060296, 43.7274950632429], [-79.3895074426657, 43.7275844846755], [-79.389522291939, 43.7276701188087], [-79.3895314541369, 43.7277907172529]]}"},{"_id":87,"OBJECTID":9557,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"DANESWOOD RD&lt;br&gt; From: GLENALLAN RD&lt;br&gt; To: STRATHEDEN RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3814786554225, 43.7222201350774], [-79.3814653408105, 43.7222627961818], [-79.3814612286698, 43.7223466475317], [-79.3814808420112, 43.7224708580688], [-79.3815234363396, 43.7226921078535], [-79.3815864330029, 43.7229965322592], [-79.3816147983447, 43.7231452442143]]}"},{"_id":88,"OBJECTID":9595,"PROJ_NUM":"TS2023-08-169\n","LAST_UPDATED_DATE":"2024-04-25","PROJECT":"Local Road Reconstruction","LOCATION":"ROSELAWN AVE&lt;br&gt; From: ELMRIDGE DR&lt;br&gt; To: LYON CRT ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2025 - 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adel Roufail, Engineering and Construction Services","CONTACT_EMAIL":"aroufai@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4389944429743, 43.7026791487955], [-79.4403057732957, 43.7024159686503]]}"},{"_id":89,"OBJECTID":9664,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"GLENALLAN RD&lt;br&gt; From: MILDENHALL RD&lt;br&gt; To: DANESWOOD RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3842067691312, 43.722607167525], [-79.3816147983447, 43.7231452442143]]}"},{"_id":90,"OBJECTID":9678,"PROJ_NUM":"TS2023-13-001","LAST_UPDATED_DATE":"2024-06-27","PROJECT":"Major Road Reconstruction","LOCATION":"GERRARD ST E&lt;br&gt; From: VICTORIA PARK AVE&lt;br&gt; To: TILBURN PL ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2029 - Q2 2032","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Sarmad Al-Douri, Engineering and Construction Services","CONTACT_EMAIL":"saldour@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.286576585578, 43.6869049632807], [-79.2839718380657, 43.6874525791325], [-79.2828341355874, 43.6877148995421], [-79.2818026899228, 43.6879363745702]]}"},{"_id":91,"OBJECTID":9720,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"PEMBURY AVE&lt;br&gt; From: ST LEONARDS AVE&lt;br&gt; To: LAWRENCE BAYVIEW S [RAMP] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3811784960871, 43.7253741475065], [-79.3813193297277, 43.7259049620102], [-79.3813273725289, 43.7259176621106], [-79.3813346701105, 43.7259306134715], [-79.38134109844, 43.7259437709581], [-79.3813467815133, 43.7259571977079], [-79.3813516079766, 43.7259707135806], [-79.3813556521597, 43.7259843906634], [-79.3813589887124, 43.7259981390215], [-79.3813613196016, 43.7260120303555], [-79.3813628932819, 43.7260259569084], [-79.3813636104205, 43.7260399365797], [-79.3813635826901, 43.7260539874878], [-79.3813626863777, 43.7260679024758], [-79.3813609211275, 43.726081861568], [-79.3813582872407, 43.7260957117436], [-79.3813549087492, 43.7261094981376], [-79.3813515309491, 43.7261229334837], [-79.3813473529078, 43.7261393384085]]}"},{"_id":92,"OBJECTID":9877,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-12","PROJECT":"Local Road Rehabilitation","LOCATION":"MACPHERSON AVE&lt;br&gt; From: RATHNELLY AVE&lt;br&gt; To: POPLAR PLAINS RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Promil Sarkar, Engineering and Construction Services","CONTACT_EMAIL":"psarkar@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4005591474137, 43.6774046672226], [-79.4006390217385, 43.6773717378471], [-79.4021896324279, 43.6770202954832], [-79.4029841859607, 43.6768401810975]]}"},{"_id":93,"OBJECTID":9906,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"MILDENHALL RD&lt;br&gt; From: ROTHMERE DR&lt;br&gt; To: [2 m E] BRAESIDE RD [CITY LIMITS] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3868903124324, 43.7293062828007], [-79.3869392494662, 43.7294154261927], [-79.3870203045063, 43.7295413166068], [-79.3870840536026, 43.7296157928129], [-79.3871593912647, 43.7296864458973], [-79.3872427117882, 43.7297564677188], [-79.3873304082361, 43.7298098415075], [-79.3874222615072, 43.7298574765349], [-79.3875189478307, 43.7298895621105], [-79.3876311162836, 43.7299000778645], [-79.3877481424833, 43.729895026143], [-79.3878991199088, 43.7298690077232], [-79.3880418584004, 43.7298545026149], [-79.3881970060931, 43.7298419627348], [-79.3883486100587, 43.7298326416247], [-79.3884742880068, 43.7298208286817], [-79.3886143035044, 43.7298153484402], [-79.388737753124, 43.7298136594253], [-79.3889231120845, 43.7298220938371], [-79.3891848562067, 43.7298596400127], [-79.3895074085221, 43.7299123844635], [-79.38979166991, 43.7299570169829], [-79.3899509791586, 43.7300036798555], [-79.3901011840792, 43.7300331864004], [-79.3902320221121, 43.7300370386346], [-79.3903657763658, 43.7300209377791], [-79.3904700359971, 43.7300055826137], [-79.3905581308749, 43.7299987090424], [-79.3906478779468, 43.7299911258864]]}"},{"_id":94,"OBJECTID":9911,"PROJ_NUM":"TS2023-08-092","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Reconstruction","LOCATION":"GILGORM RD&lt;br&gt; From: EGLINTON AVE W&lt;br&gt; To: NEW HAVEN DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2024 - Q3 2024","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4170933821421, 43.7027823156535], [-79.4172531220132, 43.7033540125276], [-79.4176274997264, 43.7048709439147], [-79.4179105055736, 43.7060097546394]]}"},{"_id":95,"OBJECTID":9944,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Rehabilitation","LOCATION":"WALMER RD&lt;br&gt; From: BERNARD AVE&lt;br&gt; To: DUPONT ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2024 - Q3 2024","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4072000404869, 43.6719424701052], [-79.4072545512988, 43.6720174953955], [-79.4082614536471, 43.6746125526301]]}"},{"_id":96,"OBJECTID":9948,"PROJ_NUM":"TS2023-11-029","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Rehabilitation","LOCATION":"HERRICK ST&lt;br&gt; From: MARKHAM ST&lt;br&gt; To: PALMERSTON BLVD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2024 - Q3 2024","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4114576674163, 43.6624292946305], [-79.4126645565832, 43.6621692831635]]}"},{"_id":97,"OBJECTID":10023,"PROJ_NUM":"TS2023-15-006","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Reconstruction","LOCATION":"BRIDLE PATH THE&lt;br&gt; From: [190 m N] POST RD&lt;br&gt; To: [350 m E] BAYVIEW AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2024 - Q2 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Matthew McAinsh, Engineering and Construction Services","CONTACT_EMAIL":"mmcains@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3780820753161, 43.7393863340636], [-79.3756555283199, 43.7398809923974], [-79.3754164417241, 43.7399281864763], [-79.3753322165712, 43.7399709044389], [-79.3752644661513, 43.7400135683093], [-79.3752230352959, 43.7400443792658], [-79.3751875416171, 43.740061874887], [-79.3751520355214, 43.7400793614824], [-79.3751138813556, 43.740086655794], [-79.3750735114181, 43.740084838438], [-79.3750467432415, 43.7400795164616], [-79.3750265486391, 43.7400713032742], [-79.3750010466374, 43.7400421924508], [-79.3749895852607, 43.7399955626048], [-79.3749840487572, 43.7399356084329], [-79.3749772354547, 43.7398687579298], [-79.3749769080842, 43.7398172615984], [-79.3749711454396, 43.7397645711603], [-79.3749631823752, 43.7396715528527], [-79.3749402598199, 43.739578302147], [-79.3748983415958, 43.7394556776693], [-79.3748588328998, 43.7393505181778], [-79.3748128203134, 43.7392923739198], [-79.3747785026904, 43.7392580236785], [-79.374733508284, 43.7392296475373], [-79.3747010485213, 43.7392152910179]]}"},{"_id":98,"OBJECTID":10097,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-02-25","PROJECT":"Major Road Rehabilitation","LOCATION":"DUPONT ST&lt;br&gt; From: [21.30 m E] SPADINA RD (TO)&lt;br&gt; To: SPADINA RD (TO) ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2027 - Q3 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Shahid Virk, Engineering and Construction Services","CONTACT_EMAIL":"svirk@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.406863209931, 43.6749142174187], [-79.4071227763358, 43.6748573152216]]}"},{"_id":99,"OBJECTID":10128,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-05","PROJECT":"Local Road Rehabilitation","LOCATION":"EUCLID AVE (TO)&lt;br&gt; From: ROBINSON ST&lt;br&gt; To: DUNDAS ST W ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Angela Au, Engineering and Construction Services","CONTACT_EMAIL":"aau2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4083232916074, 43.6480868943883], [-79.4083917312743, 43.6482331044052], [-79.4092085891003, 43.6502714755365], [-79.4093284593465, 43.6505709019254], [-79.4097223501886, 43.6515546842261]]}"},{"_id":100,"OBJECTID":10474,"PROJ_NUM":"None","LAST_UPDATED_DATE":"2025-04-02","PROJECT":"Major Road Reconstruction","LOCATION":"Sheppard Ave E&lt;br&gt; From: BAYVIEW AVE&lt;br&gt; To: Clairtrell Road  ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2025 - 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Brian Nolan, Engineering and Construction Services","CONTACT_EMAIL":"bnolan3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3900394839206, 43.7661347864044], [-79.388907478446, 43.7663738161413], [-79.3884435131222, 43.7664865630412], [-79.3881795404021, 43.7665531388294], [-79.3880562118249, 43.7665892748458]]}"}], "fields": [{"id": "_id", "type": "int"}, {"id": "OBJECTID", "type": "int4", "info": {"notes": "Unique row identifier"}}, {"id": "PROJ_NUM", "type": "text", "info": {"notes": ""}}, {"id": "LAST_UPDATED_DATE", "type": "date", "info": {"notes": "The most recent date on which the project information was revised or updated"}}, {"id": "PROJECT", "type": "text", "info": {"notes": "Road Construction"}}, {"id": "LOCATION", "type": "text", "info": {"notes": "The name, beginning and end of the street where the road reconstruction project is located"}}, {"id": "DETAILS", "type": "text", "info": {"notes": "Project scope summary"}}, {"id": "DURATION/ Construction Timeline", "type": "text", "info": {"notes": "The year in which the project begins and ends"}}, {"id": "STATUS", "type": "text", "info": {"notes": "The status of the project"}}, {"id": "INV_PRIORITY", "type": "text", "info": {"notes": ""}}, {"id": "OWNER", "type": "text", "info": {"notes": "Owner of all road reconstruction projects is Transportation Services"}}, {"id": "CONTACT_NAME", "type": "text", "info": {"notes": "Contact person information"}}, {"id": "CONTACT_EMAIL", "type": "text", "info": {"notes": "Contact email address"}}, {"id": "INV_WEB_SITE", "type": "text", "info": {"notes": ""}}, {"id": "INV_DISPLAY_PROGRAM", "type": "text", "info": {"notes": ""}}, {"id": "INV_DISPLAY_SYMBOL", "type": "text", "info": {"notes": ""}}, {"id": "START_YEAR", "type": "text", "info": {"notes": "The year in which the project begins"}}, {"id": "CONTR_NUMBER", "type": "text", "info": {"notes": ""}}, {"id": "geometry", "type": "text", "info": {"notes": ""}}], "_links": {"start": "/api/action/datastore_search?resource_id=40d94b5a-cbf2-4e04-8d48-24038d163d0c", "next": "/api/action/datastore_search?resource_id=40d94b5a-cbf2-4e04-8d48-24038d163d0c&offset=100"}, "total": 336, "total_was_estimated": false}}