﻿_id	OBJECTID	PROJ_NUM	LAST_UPDATED_DATE	PROJECT	LOCATION	DETAILS	DURATION/ Construction Timeline	STATUS	INV_PRIORITY	OWNER	CONTACT_NAME	CONTACT_EMAIL	INV_WEB_SITE	INV_DISPLAY_PROGRAM	INV_DISPLAY_SYMBOL	START_YEAR	CONTR_NUMBER	geometry
1	9	 	2025-10-14	Local Road Reconstruction	HIGHLAND AVE&lt;br&gt; From: [289.60 m E] HIGHLAND GDNS&lt;br&gt; To: ROXBOROUGH DR 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3785435145386, 43.6817156190147], [-79.3776022649132, 43.6819003219836], [-79.3775600098701, 43.6819047764862], [-79.3771063502459, 43.6819898012094]]}"
2	194	 	2025-09-10	Local Road Rehabilitation	WINONA DR&lt;br&gt; From: BELVIDERE AVE&lt;br&gt; To: BUDE ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2025	Active	None	Transportation Services	Cherry Chen, Engineering and Construction Services	cchen9@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4372030869412, 43.6935452718115], [-79.4377070698746, 43.6947908537938]]}"
3	285	 	2025-09-10	Local Road Rehabilitation	WINONA DR&lt;br&gt; From: [E] GLOUCESTER GRV [BRANCH]&lt;br&gt; To: LANARK AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2025	Active	None	Transportation Services	Cherry Chen, Engineering and Construction Services	cchen9@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4384007794188, 43.6965537587194], [-79.438721019606, 43.6972723920108]]}"
4	333	 	2025-10-14	Local Road Rehabilitation	CARLTON ST&lt;br&gt; From: RAWLINGS AVE&lt;br&gt; To: SUMACH ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3632393117332, 43.6655390894353], [-79.3625174394227, 43.6656921436714]]}"
5	380	 	2025-10-31	Local Road Rehabilitation	WALES AVE&lt;br&gt; From: BELLEVUE AVE&lt;br&gt; To: LEONARD AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2027 - Q4 2028	Active	None	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4029094143391, 43.6530886876627], [-79.403221472379, 43.6530196310293], [-79.4033423418426, 43.6529970309717], [-79.4042150473904, 43.652833895848]]}"
6	398	 	2025-10-14	Local Road Rehabilitation	REGENT ST&lt;br&gt; From: SHUTER ST&lt;br&gt; To: SUTTON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2026	Active	None	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3635196654214, 43.6572869062608], [-79.3636245791047, 43.6575166189766], [-79.3637305759413, 43.6577737410838], [-79.3637847207681, 43.6579141528371]]}"
7	410	 	2025-10-31	Laneway Reconstruction	[28.70 m N] SPRINGHURST AVE&lt;br&gt; From: COWAN AVE&lt;br&gt; To: DUNN AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4304991328845, 43.6343040121647], [-79.4318736417011, 43.6340241781122]]}"
8	441	 	2025-10-14	Local Road Rehabilitation	CARLTON ST&lt;br&gt; From: WOODSTOCK PL&lt;br&gt; To: BOWMAN ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3645021590854, 43.6652537495124], [-79.3644791353327, 43.6652587809706], [-79.3644459028372, 43.6652660785571], [-79.3638396631037, 43.6654072533266]]}"
9	448	 	2025-10-14	Local Road Rehabilitation	REGENT ST&lt;br&gt; From: SUTTON AVE&lt;br&gt; To: ST DAVID WALK 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2026	Active	None	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3637847207681, 43.6579141528371], [-79.3640219901551, 43.6585296828335]]}"
10	450	 	2025-10-14	Local Road Rehabilitation	CARLTON ST&lt;br&gt; From: METCALFE ST&lt;br&gt; To: DERMOTT PL 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3667013421698, 43.6647859999478], [-79.3665810096809, 43.6648000780788]]}"
11	536	 	2025-10-14	Local Road Rehabilitation	COPPERFIELD RD&lt;br&gt; From: MANSE RD&lt;br&gt; To: [550 m E] MANSE RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.1717492025288, 43.7598266941598], [-79.1702954453143, 43.7601015590377], [-79.1690864585156, 43.7603231135549], [-79.1678579659028, 43.760562608152], [-79.1666351880858, 43.7607481018212], [-79.1658636208942, 43.7608898883774], [-79.1645153888148, 43.7611559833378], [-79.1640918001094, 43.7612537575918], [-79.1640467301174, 43.761262627204], [-79.1636322775794, 43.761340768032], [-79.1634380173713, 43.7613774097402], [-79.1632032854737, 43.761420288499], [-79.1627937603589, 43.7614963813335], [-79.1627117981359, 43.7615107502041], [-79.1625852313278, 43.7615193796121], [-79.1624423592323, 43.7615279616256], [-79.1624092435622, 43.7615264875376], [-79.1621883602568, 43.7615166645084]]}"
12	738	TS2023-11-436	2025-09-05	Local Road Reconstruction	BALDWIN ST&lt;br&gt; From: KENSINGTON AVE (TO)&lt;br&gt; To: AUGUSTA AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4007089226048, 43.6547691715106], [-79.4015134783601, 43.654614691359], [-79.4020351684402, 43.6545084150705]]}"
13	1372	 	2025-10-30	Local Road Reconstruction	CLIFTON RD&lt;br&gt; From: GLENROSE AVE&lt;br&gt; To: ST CLAIR AVE E (TO) 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Hazel Breton, Engineering and Construction Services	hbreton@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3839793704392, 43.6892205433723], [-79.3843590690759, 43.6901390533539]]}"
14	3303	 	2026-03-19	Local Road Reconstruction	RIDELLE AVE&lt;br&gt; From: BURMONT RD&lt;br&gt; To: OLD PARK RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4318104838685, 43.7060823742306], [-79.4329630691003, 43.7058560969965]]}"
15	3346	 	2025-10-14	Local Road Reconstruction	HIGHLAND AVE&lt;br&gt; From: [45.70 m E] HIGHLAND GDNS&lt;br&gt; To: [289.60 m E] HIGHLAND GDNS 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3810608091521, 43.6824335694948], [-79.3809993074092, 43.6824251585712], [-79.3809520772989, 43.682410819814], [-79.3808891159895, 43.6823859853215], [-79.3808051827283, 43.68234588701], [-79.3807435545494, 43.6823105763025], [-79.3806727596541, 43.682263823429], [-79.3805901616246, 43.682212295589], [-79.3805023311883, 43.6821512352325], [-79.3804302616098, 43.6820863819406], [-79.3803713069641, 43.6820272572603], [-79.3803293918988, 43.681980535292], [-79.3802704185115, 43.6819309366259], [-79.3802101001075, 43.681898483116], [-79.3801471409532, 43.6818717426375], [-79.3800343088847, 43.6818420927786], [-79.3799621097891, 43.6818420160843], [-79.3798544634212, 43.6818447600091], [-79.3797704257373, 43.6818570538532], [-79.379539493169, 43.6819026012952], [-79.379299128058, 43.6819516992292], [-79.3792281882877, 43.6819606247115], [-79.379169666216, 43.6819560613108], [-79.3791022510116, 43.6819379874093], [-79.3790430635348, 43.6819220095784], [-79.3789866851057, 43.6818876549146], [-79.3789395434463, 43.6818285419992], [-79.3788936981127, 43.6817780023853], [-79.3788412707095, 43.6817360286247], [-79.3787743724755, 43.6817102346528], [-79.3786654307819, 43.6817034463966], [-79.3785435145386, 43.6817156190147]]}"
16	3483	 	2021-04-12	Laneway Reconstruction	[37 m N] WOBURN AVE&lt;br&gt; From: LEDBURY ST&lt;br&gt; To: [43 m W] LEDBURY ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4239127572605, 43.7243788422202], [-79.4244787396344, 43.7242666840196]]}"
17	3486	 	2021-04-12	Laneway Reconstruction	NICHOLSON LANE&lt;br&gt; From: PRINCESS ST&lt;br&gt; To: BERKELEY ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.363853361954, 43.6508503853498], [-79.3665079581504, 43.6502499569073]]}"
18	3514	 	2021-09-01	Laneway Reconstruction	[27.40 m W] BAY ST&lt;br&gt; From: TEMPERANCE ST&lt;br&gt; To: RICHMOND ST W 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Gabor Szakter, Engineering and Construction Services	gszakte@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3815384546847, 43.6504649376741], [-79.3817994165711, 43.6510645453407]]}"
19	3583	 	2021-07-12	Local Road Rehabilitation	HENNING AVE&lt;br&gt; From: EGLINTON AVE W&lt;br&gt; To: [107 m N] EGLINTON AVE W [END] 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4014521157876, 43.7061002196874], [-79.4018118861901, 43.7071266382737]]}"
20	3708	 	2022-08-29	Laneway Reconstruction	[30.50 m W] OSSINGTON AVE&lt;br&gt; From: BADEN ST&lt;br&gt; To: [30.20 m N] BADEN ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4216355315554, 43.6500756097822], [-79.421591252616, 43.6500841307132], [-79.4217053489407, 43.6503902461918]]}"
21	3752	 	2022-08-29	Laneway Reconstruction	[33.50 m E] EMERSON AVE&lt;br&gt; From: [30.50 m N] WALLACE AVE&lt;br&gt; To: ARMSTRONG AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4419968763231, 43.6632356139409], [-79.4420207671826, 43.6633025150236], [-79.4421819084151, 43.6637535367856]]}"
22	3760	 	2022-09-27	Laneway Reconstruction	[28.60 m W] YORK ST&lt;br&gt; From: [52 m S] RICHMOND ST W&lt;br&gt; To: RICHMOND ST W 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3851110950526, 43.6503416018767], [-79.3848953663775, 43.64980495776]]}"
23	3861	 	2023-05-19	Local Road Reconstruction	AMHERST AVE&lt;br&gt; From: GLENHOLME AVE&lt;br&gt; To: LAUDER AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2028 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4434416242263, 43.6907768698416], [-79.4445525426019, 43.6905352900118]]}"
24	4766	 	2024-03-14	Local Road Reconstruction	ST AUBYNS CRES&lt;br&gt; From: BAYVIEW WOOD&lt;br&gt; To: LEWES CRES 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3831977340256, 43.7259497608385], [-79.3830039406515, 43.7263523942656], [-79.3829824627989, 43.7264154016645], [-79.3829747617392, 43.7264551981646], [-79.3829761906555, 43.7265060665356], [-79.3829898337214, 43.7265503035951], [-79.3830186945982, 43.7266000928908], [-79.3830584921605, 43.7266504226414], [-79.3831346403131, 43.7267090886923], [-79.3832249519043, 43.7267621973951], [-79.3833231755616, 43.7268183457203], [-79.3834168364114, 43.7268598901964], [-79.3835078225155, 43.7268911974603], [-79.3835897492007, 43.7269089206562], [-79.3836793197926, 43.7269213318399]]}"
25	4779	TS2023-19-440	2024-03-14	Local Road Rehabilitation	BARKER AVE (E YK)&lt;br&gt; From: KING EDWARD AVE&lt;br&gt; To: GLEDHILL AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2027 - Q4 2027	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3134045612865, 43.6950339831121], [-79.3122779029998, 43.6952964072236]]}"
26	4798	 	2024-03-14	Local Road Reconstruction	MILDENHALL RD&lt;br&gt; From: ROTHMERE DR&lt;br&gt; To: [2 m E] BRAESIDE RD [CITY LIMITS] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3868903087035, 43.7293062854974], [-79.3869392556659, 43.7294154297994], [-79.3870203107194, 43.7295413130125], [-79.3870840585627, 43.7296157955182], [-79.3871593850583, 43.7296864458912], [-79.3872427180014, 43.7297564641244], [-79.3873304144408, 43.7298098424138], [-79.3874222565454, 43.7298574747298], [-79.3875189441001, 43.7298895657074], [-79.3876311150474, 43.729900075163], [-79.3877481437263, 43.7298950252441], [-79.3878991261169, 43.7298690068292], [-79.3880418559178, 43.7298545026125], [-79.388197007331, 43.7298419645363], [-79.3883486150172, 43.7298326452301], [-79.3884742830484, 43.7298208250764], [-79.3886143022664, 43.7298153466387], [-79.3887377556083, 43.7298136585276], [-79.3889231083606, 43.7298220938335], [-79.3891848599272, 43.7298596418166], [-79.38950740977, 43.7299123808643], [-79.389791667429, 43.7299570160804], [-79.3899509816379, 43.7300036816581], [-79.3901011902939, 43.7300331819058], [-79.3902320183964, 43.7300370341305], [-79.3903657763575, 43.7300209422797], [-79.3904700384731, 43.7300055862166], [-79.3905581358335, 43.7299987126477], [-79.3906478729751, 43.7299911294821]]}"
27	4834	TS2023-13-001	2024-04-25	Major Road Reconstruction	GERRARD ST E&lt;br&gt; From: ONTARIO ST&lt;br&gt; To: BERKELEY ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2027 - Q1 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marilia Cimini, Engineering and Construction Services	mcimini@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3697172755116, 43.6617810438202], [-79.3685391029701, 43.6620435108171]]}"
28	4905	1	2024-03-14	Local Road Reconstruction	BUCKINGHAM AVE&lt;br&gt; From: ST IVES AVE&lt;br&gt; To: [32.60 m] ST IVES AVE [CITY LIMITS] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3904034038827, 43.7265557747091], [-79.3901317578124, 43.7266286111942], [-79.3898757853593, 43.726695999282]]}"
29	5150	 	2024-06-26	Laneway Reconstruction	[30.50 m E] JONES AVE&lt;br&gt; From: [23.20 m N] QUEEN ST E&lt;br&gt; To: [115.10 m N] QUEEN ST E 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2023 - Q4 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2023	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3324316859436, 43.6631086314602], [-79.3327373082778, 43.6638731162871]]}"
30	5672	TS2023-06_07-301	2024-06-21	Local Road Reconstruction	SENTINEL RD&lt;br&gt; From: STILECROFT DR&lt;br&gt; To: GRANDRAVINE DR 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2024 - Q4 2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4941939944994, 43.7504412017151], [-79.4942774937375, 43.750585732842], [-79.4943385959284, 43.7507088768396], [-79.4943879517114, 43.75080465567], [-79.4944753552535, 43.7509159003885], [-79.4946241992533, 43.7510625874774], [-79.4947527429424, 43.7511657778305], [-79.4948499703961, 43.7512267950997], [-79.4949186879399, 43.7512713919295], [-79.4950927175776, 43.7513727926704], [-79.4952344757438, 43.7514490226441], [-79.4956576797227, 43.7516805909094]]}"
31	5829	 	2025-04-12	Laneway Reconstruction	[30.50 m W] DOVERCOURT RD&lt;br&gt; From: MACKENZIE CRES&lt;br&gt; To: [29 m N] MACKENZIE CRES 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4245709050488, 43.6477194404793], [-79.4246837411742, 43.6480218086139]]}"
32	6071	 	2024-08-14	Major Road Rehabilitation	GREENWOOD AVE&lt;br&gt; From: [34.60 m N] MILVERTON BLVD&lt;br&gt; To: SPRINGDALE BLVD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Promil Sarkar, Engineering and Construction Services	psarkar@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3339042258784, 43.6850841471032], [-79.3340637582019, 43.6854622211506]]}"
33	6273	 	2024-08-14	Major Road Rehabilitation	GREENWOOD AVE&lt;br&gt; From: SAMMON AVE&lt;br&gt; To: MORTIMER AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Promil Sarkar, Engineering and Construction Services	psarkar@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3346688950647, 43.6868847097714], [-79.3355044691125, 43.6886606926582]]}"
34	6296	TS2024-10_11-027	2025-03-19	Major Road Rehabilitation	[E] UNIVERSITY AVE [BRANCH]&lt;br&gt; From: DUNDAS ST W&lt;br&gt; To: EDWARD ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2027 (Carry-Over)	Active	None	Transportation Services	Manveer Ramburrun, Engineering and Construction Services	mrambur@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3881457854229, 43.6548243888577], [-79.3882868802567, 43.6551417615196], [-79.3884527451187, 43.6555123732583]]}"
35	6300	 	2024-10-03	Local Road Rehabilitation	MONOGRAM PL&lt;br&gt; From: [329 m W] ISLINGTON AVE&lt;br&gt; To: [389 m W] ISLINGTON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q4 2026	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5542971690567, 43.7039904367322], [-79.5549610701561, 43.703837696326]]}"
36	6476	TS2023-13-146	2025-06-13	Laneway Reconstruction	COATSWORTH ST&lt;br&gt; From: ONTARIO ST&lt;br&gt; To: MILAN ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2025 - Q3 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.368401138943, 43.6584551892994], [-79.3678113591853, 43.6585849014364]]}"
37	6479	TS2023-08-414	2025-10-31	Local Road Rehabilitation	ORIOLE PKWY&lt;br&gt; From: ORCHARD VIEW BLVD&lt;br&gt; To: ELWOOD BLVD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2027 - Q4 2028	Active	None	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.40711993841, 43.7070861600804], [-79.4072101079657, 43.7074777696901]]}"
38	6490	 	2025-09-10	Local Road Rehabilitation	WINONA DR&lt;br&gt; From: AVA RD&lt;br&gt; To: CLOVELLY AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2025	Active	None	Transportation Services	Cherry Chen, Engineering and Construction Services	cchen9@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4378210729329, 43.6951081285457], [-79.4380315034335, 43.6956078171111]]}"
39	6506	 	2025-10-31	Laneway Reconstruction	[34.40 m N] AUBURN AVE&lt;br&gt; From: [45.70 m W] VIA ITALIA&lt;br&gt; To: [143.30 m W] VIA ITALIA 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4465894578189, 43.6749583030507], [-79.4463538719074, 43.6750084237118], [-79.4454613970196, 43.6752205181024]]}"
40	6507	 	2025-10-31	Laneway Reconstruction	[36 m W] HOPEDALE AVE&lt;br&gt; From: [81 m N] O&apos;CONNOR DR&lt;br&gt; To: [171 m N] O&apos;CONNOR DR 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3531025231468, 43.6935649128476], [-79.3536153141476, 43.6942004911605]]}"
41	6531	 	2025-10-14	Local Road Rehabilitation	CARLTON ST&lt;br&gt; From: BOWMAN ST&lt;br&gt; To: RAWLINGS AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3638396631037, 43.6654072533266], [-79.3632393117332, 43.6655390894353]]}"
42	6539	TS2023-10_11-435	2025-09-05	Local Road Reconstruction	AUGUSTA AVE&lt;br&gt; From: WALES AVE&lt;br&gt; To: DENISON SQ 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4015688258877, 43.6533468153691], [-79.4017770621429, 43.6538823519038]]}"
43	6541	 	2025-10-14	Local Road Reconstruction	HIGHLAND GDNS&lt;br&gt; From: [73 m W] HIGHLAND AVE [END]&lt;br&gt; To: [73 m W] HIGHLAND AVE [END] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3815816319326, 43.6824393660884], [-79.3816929377368, 43.6824116177864], [-79.3817923972122, 43.6824002890171], [-79.3818622678438, 43.682416079336], [-79.3819005532954, 43.6824732763137], [-79.3818797874033, 43.6825196953142], [-79.381833453308, 43.6825510844999], [-79.3817536679897, 43.6825710074052], [-79.3816679835857, 43.6825859230207], [-79.3815842743853, 43.6825979809021], [-79.3815104376598, 43.6825957602774]]}"
44	6560	 	2025-10-14	Local Road Rehabilitation	CARLTON ST&lt;br&gt; From: BROADCAST LANE&lt;br&gt; To: METCALFE ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3674857192746, 43.6645993879443], [-79.3667013421698, 43.6647859999478]]}"
45	6561	 	2025-10-31	Local Road Reconstruction	[36.60 m W] PAPE AVE&lt;br&gt; From: DINGWALL AVE&lt;br&gt; To: FRIZZELL AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3432662224613, 43.6735457324523], [-79.3435691363315, 43.6742692893272]]}"
46	6562	 	2025-09-10	Local Road Reconstruction	RIPLEY AVE&lt;br&gt; From: [E-W] RIPLEY AVE [LEG]&lt;br&gt; To: ORMSKIRK AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4745930727818, 43.6371820456265], [-79.4745961015679, 43.6372062159108], [-79.4746219600916, 43.6372650825915], [-79.4749660380039, 43.6377761731919], [-79.4752688187965, 43.6381989808467], [-79.4756074787958, 43.6385754715282], [-79.4759083851249, 43.6388873368296], [-79.4761854910703, 43.639134154202]]}"
47	6569	 	2025-12-03	Laneway Reconstruction	FITZROY TER&lt;br&gt; From: KENSINGTON AVE (TO)&lt;br&gt; To: [50 m W] KENSINGTON AVE (TO) 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4001992199015, 43.6534389269145], [-79.4007953113884, 43.6533083689239]]}"
48	6661	TS2023-10_11-435	2025-09-05	Local Road Reconstruction	AUGUSTA AVE&lt;br&gt; From: OXFORD ST (TO)&lt;br&gt; To: COLLEGE ST (TO) 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.40268459094, 43.6560924157566], [-79.4032003064351, 43.6573828857872]]}"
49	7161	TS2023-11-145	2025-10-30	Local Road Reconstruction	CLIFTON RD&lt;br&gt; From: [73 m S] GLENROSE AVE [END]&lt;br&gt; To: GLENROSE AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Hazel Breton, Engineering and Construction Services	hbreton@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3834818499899, 43.6885497285425], [-79.3835885044229, 43.6885746906983], [-79.3836512137071, 43.6885971416772], [-79.3836898389027, 43.6886162331368], [-79.3837153827839, 43.6886441235492], [-79.3837418307841, 43.6886920202643], [-79.3838774920874, 43.6889819072937], [-79.3839793704392, 43.6892205433723]]}"
50	7206	 	2025-11-17	Local Road Rehabilitation	WALES AVE&lt;br&gt; From: LEONARD AVE&lt;br&gt; To: CARLYLE ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2027 - Q4 2028	Active	None	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4042150473904, 43.652833895848], [-79.4046340427991, 43.6527447222629], [-79.4046965971638, 43.652728940144], [-79.4047441896975, 43.6527130465095], [-79.4048000422126, 43.6526784009062]]}"
51	7221	 	2026-03-11	Laneway Reconstruction	Alan Borovoy Lane&lt;br&gt; From: [39.3 m E] GRACE ST (TO)&lt;br&gt; To: JERSEY AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2026 - Q2 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4152006152564, 43.6554195662412], [-79.4164095716357, 43.6585765551403], [-79.4163697594062, 43.6585954981621]]}"
52	7264	 	2026-02-18	Local Road Reconstruction	[N-S] BRAESIDE RD [BRANCH]&lt;br&gt; From: BRAESIDE CRES&lt;br&gt; To: WANLESS CRES 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3905438757911, 43.7291351132711], [-79.3903556057391, 43.7285535654651], [-79.3902974312957, 43.7284420446276]]}"
53	7353	 	2026-04-21	Local Road Reconstruction	ZAPH AVE&lt;br&gt; From: ELLESMERE RD&lt;br&gt; To: [762 m N] ELLESMERE AVE [CUL-DE-SAC] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.1667276247241, 43.7917396982679], [-79.1673478521731, 43.7930824701267], [-79.1677442462625, 43.793940627809], [-79.1678281423517, 43.7941287117041], [-79.1683264158111, 43.7952195732394], [-79.1687670413371, 43.7961779281127], [-79.1688008359139, 43.796251440119], [-79.1692238860574, 43.7971715413646], [-79.1698651130894, 43.7985584204752], [-79.170003313288, 43.7988717327379], [-79.1700847528557, 43.7990317890393], [-79.1700913760179, 43.7990386652109]]}"
54	7515	 	2025-11-17	Local Road Rehabilitation	WALES AVE&lt;br&gt; From: DENISON AVE&lt;br&gt; To: BELLEVUE AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2027 - Q4 2028	Active	None	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4026878065616, 43.6531114634911], [-79.4029094143391, 43.6530886876627]]}"
55	7585	1	2026-03-11	Local Road Reconstruction	BRAESIDE CRES&lt;br&gt; From: BRAESIDE RD&lt;br&gt; To: [1 m E] BRAESIDE RD [CITY LIMITS] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3905438757911, 43.7291351132711], [-79.3904295275255, 43.729155812771]]}"
56	7607	 	2026-02-18	Local Road Reconstruction	BRAESIDE RD&lt;br&gt; From: LANGTON AVE&lt;br&gt; To: [N-S] BRAESIDE RD [BRANCH] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3923982481767, 43.7305233036032], [-79.391433883014, 43.7307240886428], [-79.3913668845037, 43.7307261492777], [-79.3913186997697, 43.7307197107964]]}"
57	7716	 	2026-04-21	Laneway Reconstruction	[24.90 m E] HURON ST&lt;br&gt; From: [23.80 m N] DUNDAS ST W&lt;br&gt; To: [44.30 m N] DUNDAS ST W 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3958991824756, 43.6539042948101], [-79.3958250685226, 43.6537224602289]]}"
58	7717	 	2026-04-21	Laneway Reconstruction	[42.70 m E] SPADINA AVE&lt;br&gt; From: D&apos;ARCY ST&lt;br&gt; To: BALDWIN ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3976430744263, 43.654075299388], [-79.397842054292, 43.6545627611997], [-79.3980490810434, 43.655069908559]]}"
59	7775	 	2026-04-21	Local Road Reconstruction	ORCHARD PARK DR&lt;br&gt; From: KINGSTON RD&lt;br&gt; To: WEST HILL DR 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.1793273630366, 43.7746799814392], [-79.1793724937866, 43.7747707128139], [-79.1794136503585, 43.7748287408155], [-79.1794531636817, 43.7748595347893], [-79.1795028874367, 43.7748832464663], [-79.1795664299426, 43.7748966815375], [-79.1796418076897, 43.7748990774229], [-79.1798225588095, 43.7749044031346], [-79.1804253829807, 43.7748996607445], [-79.1810603904613, 43.7749045237125], [-79.1817180624308, 43.7749199236184]]}"
60	7987	 	2026-03-19	Local Road Reconstruction	RIDELLE AVE&lt;br&gt; From: OLD PARK RD&lt;br&gt; To: OVERDALE RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4329630691003, 43.7058560969965], [-79.4340824104198, 43.7055975320004]]}"
61	8003	 	2026-04-20	Local Road Reconstruction	AMIENS RD&lt;br&gt; From: KINGSTON RD&lt;br&gt; To: FAIRWOOD CRES 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.184863359705, 43.7728112802124], [-79.1863638005539, 43.7735699522827], [-79.1868036619154, 43.7738546671156], [-79.1868450449427, 43.7738898382272], [-79.1868816769281, 43.773933277375], [-79.1869232842013, 43.7739923921575], [-79.1869513356938, 43.7740545391914], [-79.186996599507, 43.7741416476665], [-79.187177228674, 43.7745825554159], [-79.18736667914, 43.7750286896456], [-79.1881164928947, 43.7767670532607]]}"
62	8004	 	2026-04-20	Local Road Reconstruction	CHEMICAL CRT&lt;br&gt; From: [305 m S] CORONATION DR [CUL-DE-SAC]&lt;br&gt; To: CORONATION DR 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.1620622871605, 43.7627011717355], [-79.1622774220258, 43.7632646970804], [-79.1625531024077, 43.7639405985815], [-79.1629828782256, 43.7649679518757], [-79.1632110474337, 43.7655356839205]]}"
63	8019	 	2026-03-19	Local Road Reconstruction	RIDELLE AVE&lt;br&gt; From: BATHURST ST&lt;br&gt; To: MANITOU BLVD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4268565582106, 43.7071050983717], [-79.4285835861986, 43.7067692737433]]}"
64	8027	 	2022-08-29	Local Road Reconstruction	HOLLAMAN RD&lt;br&gt; From: GLEN PARK AVE&lt;br&gt; To: [40 m N] GLEN PARK AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2026 - Q2 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Matthew McAinsh, Engineering and Construction Services	mmcains@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4294173872541, 43.7130262491248], [-79.4298163688248, 43.713266387425]]}"
65	8030	 	2021-07-12	Local Road Rehabilitation	RAMPART RD&lt;br&gt; From: MARTIN GROVE RD&lt;br&gt; To: [105 m E] MARTIN GROVE RD [CUL-DE-SAC] 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2024 - Q4 2025 (Carry-Over)	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5903711963217, 43.7340113037318], [-79.5899604928695, 43.7341152948613], [-79.5891731945518, 43.7343146319075], [-79.5891327342896, 43.7343373645631], [-79.5890449793373, 43.7343866786798]]}"
66	8057	 	2023-03-24	Major Road Reconstruction	BLOOR ST W&lt;br&gt; From: HURON ST&lt;br&gt; To: MADISON AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2023 - Q2 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Ahmed Bhabha, Engineering and Construction Services	abhabha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2023	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4015389542218, 43.6671618641117], [-79.4027071807526, 43.6669054451141]]}"
67	8073	 	2023-02-13	Local Road Rehabilitation	BRIDGMAN AVE&lt;br&gt; From: DARTNELL AVE&lt;br&gt; To: [15 m W] DARTNELL AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4115365763733, 43.6750145911824], [-79.4117988856133, 43.6749637113763]]}"
68	8079	 	2023-03-24	Major Road Reconstruction	BLOOR ST W&lt;br&gt; From: DEVONSHIRE PL&lt;br&gt; To: ST GEORGE ST (TO) 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2023 - Q2 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Ahmed Bhabha, Engineering and Construction Services	abhabha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2023	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3983645805034, 43.667831627684], [-79.3998364722679, 43.6675168783568]]}"
69	8114	TS2023-09-011	2023-02-13	Local Road Rehabilitation	ASCOT AVE&lt;br&gt; From: EARLSCOURT AVE&lt;br&gt; To: NAIRN AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4483381993882, 43.6791741606789], [-79.4495473959531, 43.6789139380522]]}"
70	8173	 	2023-02-13	Local Road Rehabilitation	CASTLEFIELD AVE&lt;br&gt; From: YONGE ST&lt;br&gt; To: DUPLEX AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2026 - Q4 2026	Active	None	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3994765803976, 43.7118389672036], [-79.3999992653582, 43.7117357599221], [-79.4012583548804, 43.7114871522528]]}"
71	8238	 	2023-05-19	Local Road Reconstruction	AMHERST AVE&lt;br&gt; From: LAUDER AVE&lt;br&gt; To: NORTHCLIFFE BLVD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2028 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4446388111249, 43.6907330363232], [-79.44575001914, 43.6904886833956]]}"
72	8241	 	2021-07-12	Local Road Rehabilitation	CARLING AVE&lt;br&gt; From: BLOOR ST W&lt;br&gt; To: IRENE AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2024 - Q2 2025 (Carry-Over)	Active	None	Transportation Services	Dennis Coronel, Engineering and Construction Services	dcorone@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4246453518477, 43.6621985657573], [-79.4248081618785, 43.6626166142716], [-79.4248969649302, 43.6628446316204]]}"
73	8251	 	2022-02-22	Local Road Rehabilitation	DOROTHY ST&lt;br&gt; From: HILTZ AVE&lt;br&gt; To: GREENWOOD AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2025	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.326923741667, 43.665894202187], [-79.3260210547978, 43.6660953799296]]}"
74	8272	 	2023-05-09	Local Road Rehabilitation	ROSLIN AVE&lt;br&gt; From: RONAN AVE&lt;br&gt; To: [230 m E] RONAN AVE [END] 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2026 - Q4 2026	Active	None	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3956034362273, 43.7309998722757], [-79.3930131020009, 43.7315380001873], [-79.3928150300386, 43.7315878461685], [-79.3927290931782, 43.7316280037581]]}"
75	8299	 	2023-03-24	Major Road Reconstruction	BLOOR ST W&lt;br&gt; From: MADISON AVE&lt;br&gt; To: SPADINA RD (TO) 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2023 - Q2 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Ahmed Bhabha, Engineering and Construction Services	abhabha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2023	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4027071807526, 43.6669054451141], [-79.4038707403777, 43.6666572968697]]}"
76	8332	 	2023-02-13	Local Road Rehabilitation	MACPHERSON AVE&lt;br&gt; From: WALMER RD&lt;br&gt; To: KENDAL AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4086770638926, 43.6756331312167], [-79.4092068145176, 43.6755228441598], [-79.409542868708, 43.6754528552707], [-79.4096177161817, 43.6754333996106], [-79.4096551291579, 43.6754262857373], [-79.4096781033274, 43.6754229698031], [-79.4097122263847, 43.6754239499999]]}"
77	8373	 	2023-02-13	Local Road Rehabilitation	MACPHERSON AVE&lt;br&gt; From: [15.20 m W] DAVENPORT RD&lt;br&gt; To: HURON ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4040959554037, 43.6765933111377], [-79.4051682267088, 43.6763638637536]]}"
78	8512	 	2023-05-19	Local Road Reconstruction	AMHERST AVE&lt;br&gt; From: WESTMOUNT AVE&lt;br&gt; To: NORTHCLIFFE BLVD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2028 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.44575001914, 43.6904886833956], [-79.4468253424522, 43.6902652579895]]}"
79	8520	 	2023-02-13	Laneway Reconstruction	[27.40 m W] DUNCAN ST&lt;br&gt; From: [25 m N] ADELAIDE ST W&lt;br&gt; To: NELSON ST (TO) 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3892446711243, 43.6484187445784], [-79.389371363459, 43.6487226740694]]}"
80	8878	 	2023-10-06	Local Road Rehabilitation	FOSTER PL&lt;br&gt; From: [57.70 m E] ELIZABETH ST (TO) [END]&lt;br&gt; To: ELIZABETH ST (TO) 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2027 - Q4 2027	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3841195280987, 43.654736809786], [-79.3848612587942, 43.6545472112448]]}"
81	8899	 	2023-10-30	Local Road Reconstruction	WANLESS CRES&lt;br&gt; From: WANLESS AVE&lt;br&gt; To: [E] BRAESIDE RD [CITY LIMITS] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2025 - Q3 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3902974312957, 43.7284420446276], [-79.390371317861, 43.728473161684], [-79.3905152493255, 43.7284986948301], [-79.3906592049065, 43.7285171789492], [-79.3908440224484, 43.7285230020713], [-79.3910035909218, 43.7285161081759], [-79.3912021026766, 43.7284866571272], [-79.3913656441166, 43.7284317890138], [-79.3915331273827, 43.7283515391172], [-79.3916480509961, 43.7282867302922], [-79.3917883247868, 43.7281852734111], [-79.3918682376245, 43.7281035079852], [-79.3919579460683, 43.7279921376891], [-79.3920067177683, 43.7279145742056], [-79.392057487223, 43.7278172629703], [-79.3920926624174, 43.7277284089555], [-79.3921239543733, 43.7275686026018]]}"
82	8903	 	2024-04-05	Local Road Rehabilitation	FORD ST&lt;br&gt; From: CONNOLLY ST&lt;br&gt; To: ST CLAIR AVE W 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q4 2025 (Carry-Over)	Active	None	Transportation Services	Matthew McAinsh, Engineering and Construction Services	mmcains@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4617647312962, 43.6718978815109], [-79.4625167888994, 43.6736548248326]]}"
83	9047	TS2024-07-026	2024-04-25	Major Road Rehabilitation	YORK GATE BLVD&lt;br&gt; From: FINCH AVE (N YK)&lt;br&gt; To: [90 m S] HULLMAR DR 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q4 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Tazeen Fatema, Engineering and Construction Services	tfatema@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5207024166112, 43.7567321291054], [-79.5214560836887, 43.7582764947319], [-79.5214689107933, 43.7583035048966], [-79.5214813392587, 43.758330496232], [-79.5214933715785, 43.7583574975418], [-79.5215042489616, 43.7583845080686], [-79.5215143535261, 43.7584070001422], [-79.5215236677644, 43.7584385025552], [-79.5215322212356, 43.7584610048204], [-79.5215399939401, 43.758488006927], [-79.5215469982981, 43.7585195106731], [-79.521553217044, 43.7585420124763], [-79.5215586566381, 43.7585735156163], [-79.5215637083951, 43.7586005191341], [-79.5215672090387, 43.7586275220441], [-79.5215707221047, 43.7586545258517], [-79.5215726703939, 43.7586815290542], [-79.5215742336994, 43.7587085332294], [-79.5215746283878, 43.7587355367249], [-79.5215746533688, 43.7587670417851], [-79.5215738678862, 43.7587895449082], [-79.5215723405024, 43.7588210502611], [-79.5215700291082, 43.7588480551669], [-79.5215665366716, 43.7588750593953], [-79.5215622755036, 43.7589020736697], [-79.5215576293378, 43.758929069114], [-79.5215522148125, 43.758960575199], [-79.5215456284282, 43.7589830803149], [-79.521538262501, 43.7590100852719], [-79.5215301265919, 43.7590370912734], [-79.5215215920267, 43.7590640973493], [-79.5215021969311, 43.7591046072522], [-79.521481645237, 43.7591406257754], [-79.5214606961042, 43.7591766263669], [-79.5214389757301, 43.7592126370004], [-79.5214161016042, 43.7592486469455], [-79.5213928271971, 43.7592801563663], [-79.5213687732143, 43.7593161755235], [-79.5213439492203, 43.7593521867182], [-79.521317967383, 43.7593836876275], [-79.5212915785313, 43.7594196982021], [-79.5212640458541, 43.7594557098834], [-79.5212361153871, 43.7594872291383], [-79.5212074012418, 43.7595187305293], [-79.521177919917, 43.7595547425508], [-79.5211476657469, 43.7595862532129], [-79.5211166291462, 43.7596177730126], [-79.5210961709434, 43.7596418018629], [-79.521085980321, 43.7596537762242], [-79.5210561110446, 43.7596852867906], [-79.5210274091359, 43.7597168070355], [-79.5209990949986, 43.7597528088936], [-79.5209715495739, 43.7597888196045], [-79.5209443891092, 43.7598248311381], [-79.5209184056188, 43.7598563400553], [-79.5208927974835, 43.759892350392], [-79.5208679717236, 43.7599283605799], [-79.5208439283405, 43.7599643706195], [-79.5208364558879, 43.7599755433564], [-79.5208198725094, 43.7600003806561], [-79.5208039561433, 43.7600183868303], [-79.520788824975, 43.7600408925532], [-79.520774089652, 43.7600588985083], [-79.5207605093031, 43.7600769033515], [-79.5207473294705, 43.7601039102084], [-79.5207349165068, 43.7601219148365], [-79.520723672493, 43.7601444207453], [-79.5207128134655, 43.760166925683], [-79.5207027352879, 43.7601849307844], [-79.5206934162263, 43.7602074354412], [-79.5206852769827, 43.7602299407837], [-79.5206775242813, 43.7602569547505], [-79.5206705508786, 43.7602749493858], [-79.5206647340116, 43.7602974543065], [-79.5206593021359, 43.7603199582572], [-79.5206550500861, 43.7603424709955], [-79.5206515556005, 43.7603649664944], [-79.5206484600785, 43.7603919706159], [-79.5206465316572, 43.7604144739326], [-79.520645371986, 43.7604369771103], [-79.5206452382403, 43.7604453122339], [-79.520670053419, 43.7605543220271], [-79.5206867247553, 43.7606399653056]]}"
84	9051	1	2024-03-14	Local Road Reconstruction	BAYVIEW WOOD&lt;br&gt; From: MILDENHALL RD&lt;br&gt; To: [65.97 m N/E] ST AUBYNS CRES [END] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""MultiLineString"", ""coordinates"": [[[-79.3847640639245, 43.7267010748062], [-79.3841382049786, 43.7268618910575]], [[-79.3841382049786, 43.7268618910575], [-79.3840794665047, 43.7268630214664], [-79.3839893147196, 43.7268687745076], [-79.3838939607067, 43.7268817051827], [-79.3838133640315, 43.7269021479121], [-79.3837559793898, 43.7269149901435], [-79.3836793197926, 43.7269213318399], [-79.3833170326876, 43.7274539592486]], [[-79.386156918345, 43.7274497588323], [-79.3860389327796, 43.7274833788024], [-79.3860152486876, 43.7274898810845], [-79.3858896993449, 43.72752518559], [-79.3857917706978, 43.7275398966215], [-79.3856925966543, 43.7275632925187], [-79.3855810828837, 43.727581042103], [-79.3854543417122, 43.7275901801369], [-79.3853566302999, 43.7275819927627], [-79.3852439301143, 43.7275579480779], [-79.3851618871654, 43.7275282453043], [-79.3850870322546, 43.7274920958103], [-79.3850174167655, 43.7274487856517], [-79.384944739288, 43.7273905312121], [-79.3848806697512, 43.727329143063], [-79.3848242702101, 43.7272624437742], [-79.3847689025409, 43.7271943043986], [-79.3847220129178, 43.7271266686143], [-79.3846866620751, 43.7270744815767], [-79.384647924085, 43.7270338748043], [-79.3845997840372, 43.7269905590549], [-79.3845474860626, 43.726952989977], [-79.3844854175864, 43.7269236030293], [-79.3844204563041, 43.7269068958691], [-79.3843534179204, 43.7268930588659], [-79.3843136877089, 43.7268851254747], [-79.3842554768726, 43.7268765171669], [-79.384169956676, 43.7268620123502], [-79.3841499735354, 43.7268616599525], [-79.3841382049786, 43.7268618910575]]]}"
85	9293	1	2024-03-14	Local Road Reconstruction	CHELTENHAM AVE&lt;br&gt; From: ST IVES AVE&lt;br&gt; To: [20.30 m E] ST IVES AVE [CITY LIMITS] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3900333542572, 43.7256097066243], [-79.3898172073568, 43.7256413727689], [-79.3896602410674, 43.7256736537257]]}"
86	9329	TS2023-04-089	2024-06-26	Local Road Rehabilitation	EVANS AVE (TO)&lt;br&gt; From: COLBECK ST&lt;br&gt; To: ARDAGH ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.483865437579, 43.6534273781895], [-79.4850005380202, 43.6561965500742]]}"
87	9370	TS2023-12-106	2024-06-26	Local Road Rehabilitation	WINONA DR&lt;br&gt; From: [9.80 m N] BARRIE AVE&lt;br&gt; To: WATFORD AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2024 - Q3 2024	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4328154522714, 43.68080804266], [-79.4328744682301, 43.6808395018142], [-79.4329150694203, 43.6808701661178], [-79.4329423451893, 43.6809084998102], [-79.4329795709501, 43.6809709889518], [-79.4332738158106, 43.681678512999]]}"
88	9371	 	2024-06-26	Local Road Rehabilitation	WALMER RD&lt;br&gt; From: BERNARD AVE&lt;br&gt; To: DUPONT ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2024 - Q3 2024	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4072000442044, 43.6719424719085], [-79.4072545488145, 43.6720174980939], [-79.4082614536457, 43.6746125535303]]}"
89	9388	 	2024-04-16	Local Road Rehabilitation	SEATON ST&lt;br&gt; From: DUNDAS ST E&lt;br&gt; To: GERRARD ST E 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Angela Au, Engineering and Construction Services	aau2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3695116514794, 43.6586590313533], [-79.3696886692824, 43.6590910440869], [-79.3701538980114, 43.6602263551023], [-79.3705442832578, 43.6611790599356], [-79.3707022026958, 43.6615644097245]]}"
90	9419	TS2023-13-001	2024-04-25	Major Road Reconstruction	GERRARD ST E&lt;br&gt; From: [N] GERRARD ST E [BRANCH]&lt;br&gt; To: PARLIAMENT ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2027 - Q1 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marilia Cimini, Engineering and Construction Services	mcimini@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3681759581657, 43.6621129619358], [-79.3670355355869, 43.6619503721934]]}"
91	9427	 	2024-04-12	Major Road Rehabilitation	DUPONT ST&lt;br&gt; From: MADISON AVE&lt;br&gt; To: [21.30 m E] SPADINA RD (TO) 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q4 2026 - Q3 2027	Active	None	Transportation Services	Shahid Virk, Engineering and Construction Services	svirk@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4059769635791, 43.6751085658455], [-79.4068632086908, 43.6749142174177]]}"
92	9431	TS2023-13-001	2024-04-25	Major Road Reconstruction	GERRARD ST E&lt;br&gt; From: CENTRAL HOSPITAL LANE&lt;br&gt; To: SEATON ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2027 - Q1 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marilia Cimini, Engineering and Construction Services	mcimini@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3714388008979, 43.6614023360052], [-79.3707022026958, 43.6615644097245]]}"
93	9547	 	2024-03-14	Local Road Reconstruction	WANLESS CRES&lt;br&gt; From: ST IVES AVE&lt;br&gt; To: [E] BUCKINGHAM AVE [CITY LIMITS] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3904034038827, 43.7265557747091], [-79.3903233027828, 43.7265842939174], [-79.3902424601504, 43.7266116971037], [-79.3901487546399, 43.7266540290297], [-79.3900433447988, 43.7267028305125], [-79.3899831097828, 43.726735096004], [-79.3899295542119, 43.7267657566741], [-79.3898944124013, 43.7267875139293], [-79.3898762535612, 43.726800197185], [-79.3898692280134, 43.7268063967709]]}"
94	9549	TS2023-13-001	2024-04-25	Major Road Reconstruction	GERRARD ST E&lt;br&gt; From: SEATON ST&lt;br&gt; To: ONTARIO ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2027 - Q1 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marilia Cimini, Engineering and Construction Services	mcimini@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3707022026958, 43.6615644097245], [-79.3697172755116, 43.6617810438202]]}"
95	9572	1	2024-03-14	Local Road Reconstruction	"DAWLISH AVE&lt;br&gt; From: DANESWOOD RD
DANESWOOD RD
DANESWOOD RD&lt;br&gt; To: BAYVIEW AVE "	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3819177709487, 43.7241363723062], [-79.379706620262, 43.7246178780895]]}"
96	9598	 	2025-02-25	Major Road Rehabilitation	DUPONT ST&lt;br&gt; From: [21.30 m E] SPADINA RD (TO)&lt;br&gt; To: SPADINA RD (TO) 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q4 2026 - Q3 2027	Active	None	Transportation Services	Shahid Virk, Engineering and Construction Services	svirk@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4068632086908, 43.6749142174177], [-79.4071227701378, 43.6748573134163]]}"
97	9613	TS2023-12-009	2024-06-26	Local Road Rehabilitation	ARCHER RD&lt;br&gt; From: DUNLOE RD&lt;br&gt; To: BROWSIDE AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2024 - Q3 2024	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4139535093099, 43.6965057544061], [-79.4150224212979, 43.696282978252]]}"
98	9648	 	2024-08-13	Local Road Rehabilitation	REDPATH AVE&lt;br&gt; From: EGLINTON AVE E&lt;br&gt; To: ROEHAMPTON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2026 - Q4 2026	Active	None	Transportation Services	Bill Dakogiannis, Engineering and Construction Services	bdakogi@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3928193662151, 43.7078611540079], [-79.3932944623297, 43.709071936103]]}"
99	9671	TS2023-13-001	2024-06-27	Major Road Reconstruction	GERRARD ST E&lt;br&gt; From: VICTORIA PARK AVE&lt;br&gt; To: TILBURN PL 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2029 - Q2 2032	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Sarmad Al-Douri, Engineering and Construction Services	saldour@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2865765831036, 43.6869049614758], [-79.2839718355978, 43.6874525755274], [-79.2828341306258, 43.6877148995327], [-79.2818026874289, 43.687936378166]]}"
100	9680	 	2024-04-12	Local Road Rehabilitation	MACPHERSON AVE&lt;br&gt; From: RATHNELLY AVE&lt;br&gt; To: POPLAR PLAINS RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2027 - Q4 2027	Active	None	Transportation Services	Promil Sarkar, Engineering and Construction Services	psarkar@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4005591523686, 43.6774046708274], [-79.400639024213, 43.6773717414498], [-79.4021896299504, 43.6770202936808], [-79.4029841859579, 43.6768401828977]]}"
101	9698	 	2024-04-12	Major Road Rehabilitation	KEELE ST&lt;br&gt; From: FINCH AVE W&lt;br&gt; To: STEELES AVE W 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2028 - Q4 2029	Active	None	Transportation Services	Adel Roufail, Engineering and Construction Services	aroufai@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4910534144174, 43.7635021636324], [-79.4916590122106, 43.7657154548501], [-79.4917365830686, 43.7660340878092], [-79.4918108279281, 43.7663390476703], [-79.492012041353, 43.767165649925], [-79.4920222716224, 43.7672076510298], [-79.4920479063207, 43.7673129251761], [-79.4932398858887, 43.7719900679568], [-79.4939610227479, 43.7748195513112], [-79.4940388269615, 43.7751688725797], [-79.4940486722192, 43.7752130688079], [-79.4940587288642, 43.7752553117934], [-79.4945741239377, 43.7774193338241], [-79.4946234866197, 43.7775764865151], [-79.4946446695939, 43.777664256922], [-79.494649409077, 43.7777179760671], [-79.4946566182132, 43.7777997690444], [-79.4946727146159, 43.7779103094385], [-79.4946735458159, 43.7779930355349], [-79.4946836092977, 43.7780664827646], [-79.4946870634698, 43.7781438172861], [-79.494680742704, 43.7782137352969], [-79.4946841926938, 43.7783102863908], [-79.494679272462, 43.7784027334653], [-79.4946799137436, 43.7785119310534], [-79.4946774394164, 43.7786062144747], [-79.4946752364054, 43.7787088410808], [-79.4946483297321, 43.7788578927048], [-79.4945988029888, 43.7789927853305], [-79.4945677521232, 43.7791091103228], [-79.4945386917629, 43.7792069659241], [-79.4945185875296, 43.7792871796776], [-79.4944932896992, 43.7793745751997], [-79.4944589432657, 43.7794832382108], [-79.4944443892126, 43.7795802204717], [-79.4944246694092, 43.7796651589292], [-79.4944072970319, 43.7797555882027], [-79.4943710468301, 43.779879084993], [-79.4943572618942, 43.779985517588], [-79.4943428958292, 43.7800752629071], [-79.4943343886777, 43.78019012894], [-79.4943094593848, 43.7803014756016], [-79.4943066096639, 43.7803910315595], [-79.4943036434677, 43.7805034594465], [-79.4943143542658, 43.7806284158206], [-79.49432827732, 43.7807454549342], [-79.4943429634807, 43.7808334842589], [-79.4943600083899, 43.7809269945], [-79.4943742165601, 43.7810523866875], [-79.4944003867822, 43.7811979141397], [-79.494427418631, 43.7813108133401], [-79.4944517289804, 43.7814327315561], [-79.4945063620089, 43.7815790704563]]}"
102	9711	TS2023-19-440	2024-03-14	Local Road Rehabilitation	BARKER AVE (E YK)&lt;br&gt; From: CEDARVALE AVE&lt;br&gt; To: KING EDWARD AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2027 - Q4 2027	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3146759823346, 43.6947314523992], [-79.3145799908176, 43.6947620820384], [-79.3134045612865, 43.6950339831121]]}"
103	9745	 	2024-04-05	Local Road Rehabilitation	EUCLID AVE (TO)&lt;br&gt; From: ROBINSON ST&lt;br&gt; To: DUNDAS ST W 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Angela Au, Engineering and Construction Services	aau2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4083232928497, 43.648086892589], [-79.4083917325098, 43.6482331071066], [-79.409208592822, 43.6502714737392], [-79.4093284605902, 43.650570899226], [-79.4097223439915, 43.6515546833211]]}"
104	9778	1	2024-03-14	Local Road Reconstruction	LEWES CRES&lt;br&gt; From: ST LEONARDS AVE&lt;br&gt; To: ST LEONARDS AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3840849904927, 43.7247559634183], [-79.3841050445765, 43.7248343962801], [-79.3840878575287, 43.7249536399168], [-79.384074005477, 43.725061310433], [-79.3839519974445, 43.7258025955114], [-79.3833269000062, 43.7259424820346], [-79.383250240381, 43.7259488144433], [-79.3831977340256, 43.7259497608385], [-79.3831326690852, 43.7259366605352], [-79.383096884996, 43.725930251964], [-79.3830435540253, 43.7259097465877], [-79.3829742839245, 43.7258711503764], [-79.382915476077, 43.7258338250141], [-79.3828594289637, 43.7257874733056], [-79.3828143247871, 43.7257434830128], [-79.3827678245418, 43.7256961959155], [-79.3827165309599, 43.7256259408137], [-79.3826783706125, 43.7255671667505], [-79.3826381264236, 43.7254956447763], [-79.3826162367751, 43.7254440532847], [-79.382588556623, 43.7254021681805], [-79.3825426327119, 43.7253523522319], [-79.382475561994, 43.7253072761805], [-79.3824204726173, 43.7252787215929], [-79.382344591599, 43.7252440247343], [-79.3822769630855, 43.7252170872946], [-79.3821241626606, 43.7251647415177]]}"
105	9881	TS2023-04-223	2024-06-26	Local Road Rehabilitation	MARGDON RD&lt;br&gt; From: KENNEDY PARK RD&lt;br&gt; To: GLENDONWYNNE RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4732038861529, 43.6527118143564], [-79.4732867723957, 43.6526117962668], [-79.4733498847216, 43.6525856764555], [-79.473418683022, 43.6525690633652], [-79.474381054799, 43.6523617954893]]}"
106	9892	TS2023-04-113	2025-04-12	Laneway Reconstruction	[36.60 m W] FORT ROUILLE ST&lt;br&gt; From: [54.90 m S] SPRINGHURST AVE&lt;br&gt; To: SPRINGHURST AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4274709502319, 43.6345420008847], [-79.4272707358038, 43.6339712748967]]}"
107	9896	 	2025-04-12	Local Road Reconstruction	JIMMY WISDOM WAY&lt;br&gt; From: EGLINTON AVE W&lt;br&gt; To: LIVINGSTONE AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.447332887316, 43.6963589175388], [-79.4476356665481, 43.6971054479328]]}"
108	9897	 	2025-04-12	Laneway Reconstruction	[37.80 m W] OSSINGTON AVE&lt;br&gt; From: [39.90 m S] NORTHUMBERLAND ST&lt;br&gt; To: NORTHUMBERLAND ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4265170795357, 43.6624741982785], [-79.4265122177632, 43.6624946182977], [-79.4266741792454, 43.6628937715732]]}"
109	9937	 	2024-06-28	Major Road Rehabilitation	WELLESLEY ST E&lt;br&gt; From: WELLESLEY PL&lt;br&gt; To: HOMEWOOD AVE (TO) 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2026 - Q4 2026	Active	None	Transportation Services	Rooban Markandu, Engineering and Construction Services	rmarkan2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3765008836219, 43.6664289195821], [-79.3763109983227, 43.6664296126124], [-79.3761593353147, 43.6664382661163], [-79.3760344105356, 43.6664551288314], [-79.3758529017376, 43.6664862708985]]}"
110	9958	 	2024-06-28	Major Road Rehabilitation	WELLESLEY ST E&lt;br&gt; From: HOMEWOOD AVE (TO)&lt;br&gt; To: SHERBOURNE ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2026 - Q4 2026	Active	None	Transportation Services	Rooban Markandu, Engineering and Construction Services	rmarkan2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3758529017376, 43.6664862708985], [-79.3757151542148, 43.6665228970707], [-79.3755319095527, 43.6665916101116], [-79.3753480007433, 43.6666700723793], [-79.3751682423503, 43.6667655766081], [-79.3750017079836, 43.66687240519], [-79.3748581028492, 43.6669787284524], [-79.3746839177489, 43.6670945180206]]}"
111	10045	 	2024-04-05	Laneway Reconstruction	Reggae LN ([30 m S] EGLINTON AVE W)&lt;br&gt; From: [48 m W] ALAMEDA AVE&lt;br&gt; To: OAKWOOD AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2025 - Q3 2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Angela Au, Engineering and Construction Services	aau2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4426455658532, 43.6969425186823], [-79.4419622463682, 43.69709103167], [-79.4419478252956, 43.6970551722199], [-79.4407554354441, 43.6973174718272]]}"
112	10065	None	2025-04-02	Major Road Reconstruction	Sheppard Ave E&lt;br&gt; From: BAYVIEW AVE&lt;br&gt; To: Clairtrell Road  	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2025 - 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Brian Nolan, Engineering and Construction Services	bnolan3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3900394839206, 43.7661347864044], [-79.388907478446, 43.7663738161413], [-79.3884435131222, 43.7664865630412], [-79.3881795404021, 43.7665531388294], [-79.3880562118249, 43.7665892748458]]}"
113	10066	1	2024-03-14	Local Road Reconstruction	MILDENHALL RD&lt;br&gt; From: BLYTHWOOD RD&lt;br&gt; To: LAWRENCE AVE E 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3832254686457, 43.7201223674845], [-79.3835472674394, 43.7208965323133], [-79.3838624792093, 43.721721433073], [-79.3842067678901, 43.7226071675237], [-79.3846013974838, 43.7235922398659], [-79.3849823905845, 43.7245527091598], [-79.3853886041248, 43.7255219245174], [-79.3857736626135, 43.7264958670832], [-79.386156918345, 43.7274497588323], [-79.3865424099046, 43.72839676001]]}"
114	10086	TS2023-11-447	2024-06-28	Local Road Reconstruction	RAMSDEN PARK RD&lt;br&gt; From: YONGE ST&lt;br&gt; To: [126 m W] YONGE ST [END] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.389572829349, 43.6770385952618], [-79.3900593468608, 43.6769302976837], [-79.3911833618606, 43.6766801085893]]}"
115	10267	TS2024-10_11-027	2025-03-19	Major Road Rehabilitation	[E] UNIVERSITY AVE [BRANCH]&lt;br&gt; From: EDWARD ST&lt;br&gt; To: ELM ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2027 (Carry-Over)	Active	None	Transportation Services	Manveer Ramburrun, Engineering and Construction Services	mrambur@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3884527451187, 43.6555123732583], [-79.3885321775094, 43.6557022136473], [-79.3888195268601, 43.6563725711916]]}"
116	10268	TS2024-10_11-027	2025-03-19	Major Road Rehabilitation	[E] UNIVERSITY AVE [BRANCH]&lt;br&gt; From: ELM ST&lt;br&gt; To: GERRARD ST W 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2027 (Carry-Over)	Active	None	Transportation Services	Manveer Ramburrun, Engineering and Construction Services	mrambur@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3888228239046, 43.6563763459643], [-79.3891509992519, 43.6571339644754], [-79.3893409813778, 43.6575640997989]]}"
117	10308	TS2023-13-044	2025-03-24	Local Road Reconstruction	SACKVILLE PL&lt;br&gt; From: SACKVILLE ST&lt;br&gt; To: WOODSTOCK PL 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2025 - Q3 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3653496007707, 43.6658238675451], [-79.3647928557414, 43.6659497421659], [-79.364759658338, 43.6659572730188]]}"
118	10371	 	2024-10-03	Local Road Rehabilitation	MONOGRAM PL&lt;br&gt; From: [149 m W] ISLINGTON AVE&lt;br&gt; To: [329 m W] ISLINGTON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q4 2026	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5521526839498, 43.704483706961], [-79.5542971690567, 43.7039904367322]]}"
119	10449	 	2023-09-11	Laneway Reconstruction	DOUGLAS CAMPBELL LANE&lt;br&gt; From: COLLEGE ST (TO)&lt;br&gt; To: [45.70 m N] COLLEGE ST (TO) 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4010554289409, 43.6578112833012], [-79.4012453655503, 43.6582724129034]]}"
120	10471	 	2023-09-11	Laneway Reconstruction	DOUGLAS CAMPBELL LANE&lt;br&gt; From: [57.90 m W] SPADINA AVE&lt;br&gt; To: ROBERT ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4012453655503, 43.6582724129034], [-79.402023594678, 43.6581118072005]]}"
121	10472	TS2022-03-001	2023-10-05	Major Road Reconstruction	THE QUEENSWAY EB&lt;br&gt; From: HUMBER RIVER&lt;br&gt; To: HIGH ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amir Gafoor, Engineering and Construction Services	Amir.Gafoor@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4754552420102, 43.6334533490102], [-79.4755693926282, 43.6333419110731], [-79.4758617917272, 43.6330631830845], [-79.4758652251398, 43.6330587011179], [-79.4762272223262, 43.632585945705], [-79.4764116363253, 43.632347451582], [-79.4766363038711, 43.63211346428], [-79.4768806972972, 43.6319289872655], [-79.4772145174171, 43.6317580269671], [-79.4777113489372, 43.6316275975456], [-79.4782023911683, 43.6315376630168], [-79.4784018234047, 43.6315151910907], [-79.4800604404825, 43.6312363970807], [-79.4803853595993, 43.6311689329529], [-79.4808663364015, 43.631105989422], [-79.4815169216916, 43.6309710539785]]}"
122	10607	 	2025-09-10	Local Road Rehabilitation	WINONA DR&lt;br&gt; From: BUDE ST&lt;br&gt; To: AVA RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2025	Active	None	Transportation Services	Cherry Chen, Engineering and Construction Services	cchen9@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4377070698746, 43.6947908537938], [-79.4378210729329, 43.6951081285457]]}"
123	10830	 	2025-10-31	Laneway Reconstruction	[87.20 m N] DAVENPORT RD&lt;br&gt; From: GREENLAW AVE&lt;br&gt; To: ST CLARENS AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4464401861922, 43.672909534591], [-79.4464681309669, 43.6728510030595], [-79.4465036843606, 43.6728113859667], [-79.4465549600059, 43.6727870163589], [-79.4471822074002, 43.6726508225971], [-79.44780806402, 43.6725149217989]]}"
124	10921	None	2025-05-02	Laneway Reconstruction	[113 m W] HUMBERCREST BLVD&lt;br&gt; From: UNDERWOOD AVE&lt;br&gt; To: ST MARK&apos;S RD 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2026 - 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	 Toronto and Region Conservation Authority	info@trca.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4944723432002, 43.6604133685173], [-79.4946587574067, 43.6600939142195], [-79.4945341453956, 43.6594286188107]]}"
125	10951	 	2024-03-14	Local Road Reconstruction	DANESWOOD RD&lt;br&gt; From: GLENALLAN RD&lt;br&gt; To: STRATHEDEN RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3814786566566, 43.7222201386792], [-79.3814653395746, 43.7222627934801], [-79.3814612224624, 43.7223466484254], [-79.3814808432434, 43.7224708625707], [-79.3815234400595, 43.7226921096576], [-79.3815864354799, 43.7229965349621], [-79.3816147933836, 43.7231452424089]]}"
126	10978	TS2023-13-049	2024-04-25	Local Road Rehabilitation	ST PAUL ST&lt;br&gt; From: RAY LANE&lt;br&gt; To: QUEEN ST E 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2024 - Q4 2025 (Carry-Over)	Active	None	Transportation Services	Javier Saborio, Engineering and Construction Services	jsabori@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.360355685286, 43.6560617016883], [-79.3603641264084, 43.6560838463216], [-79.3605137833925, 43.6564794961722]]}"
127	11105	TS2023-15-006	2024-06-28	Local Road Reconstruction	BRIDLE PATH THE&lt;br&gt; From: [350 m E] BAYVIEW AVE&lt;br&gt; To: BAYVIEW AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2024 - Q2 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Matthew McAinsh, Engineering and Construction Services	mmcains@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3822969117696, 43.7385257312075], [-79.3809399577641, 43.7388084673418], [-79.3781692763482, 43.739368560522], [-79.3780820753087, 43.7393863376641]]}"
128	11168	 	2023-02-13	Local Road Rehabilitation	MACPHERSON AVE&lt;br&gt; From: MADISON AVE&lt;br&gt; To: SPADINA RD (TO) 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4063298369843, 43.6761221387338], [-79.4066741646819, 43.6760507059513], [-79.4068049039809, 43.6760167777231], [-79.4069870403323, 43.6759529194814], [-79.4071208602984, 43.6759146808652], [-79.407379142515, 43.6758583981441], [-79.4074931331635, 43.6758691741159]]}"
129	11212	 	2024-04-05	Laneway Reconstruction	[31.40 m N] ST CLAIR AVE W&lt;br&gt; From: SILVERTHORN AVE&lt;br&gt; To: CLOVERDALE RD 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2025 - Q4 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Matthew McAinsh, Engineering and Construction Services	mmcains@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4601960815277, 43.6746117523388], [-79.4616994597075, 43.6742792673888]]}"
130	11331	TS2023-11-436	2025-09-05	Local Road Reconstruction	BALDWIN ST&lt;br&gt; From: SPADINA AVE&lt;br&gt; To: [98 m W] SPADINA AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3989262173483, 43.6551380274871], [-79.4002782277325, 43.6548582970667]]}"
131	11473	TS2023-13-044	2025-03-24	Local Road Reconstruction	SACKVILLE PL&lt;br&gt; From: FLAGLER ST&lt;br&gt; To: BOWMAN ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2025 - Q3 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3646466576578, 43.6659828749929], [-79.3641587769398, 43.6660933151395]]}"
132	11498	 	2024-03-14	Local Road Reconstruction	[N-S] BRAESIDE RD [BRANCH]&lt;br&gt; From: BRAESIDE RD&lt;br&gt; To: HASLEMERE RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3913186997697, 43.7307197107964], [-79.3912737441587, 43.7307137020249], [-79.3912370645812, 43.7306787684459], [-79.3911855115988, 43.7306171401397], [-79.3911451638329, 43.7305240784712], [-79.3908941022949, 43.7299304336252]]}"
133	11512	TS2023-11-008	2024-06-26	Local Road Reconstruction	ALBANY AVE&lt;br&gt; From: [E] BARTON AVE [BRANCH]&lt;br&gt; To: [W] BARTON AVE [BRANCH] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4110991128806, 43.6682373685789], [-79.411166032323, 43.6683707897451]]}"
134	11569	TS2023-11-283	2024-06-26	Local Road Rehabilitation	YARMOUTH GDNS&lt;br&gt; From: PALMERSTON AVE&lt;br&gt; To: MANNING AVE (TO) 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2024 - Q3 2024	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4161150546134, 43.6709813156484], [-79.4166836084404, 43.6708603089348], [-79.4183959867239, 43.6704958895007], [-79.4184777760067, 43.6704826645972], [-79.4184924300699, 43.6704852863324]]}"
135	11614	 	2025-10-14	Local Road Rehabilitation	REGENT ST&lt;br&gt; From: ST BARTHOLOMEW ST&lt;br&gt; To: DUNDAS ST E 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2026	Active	None	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3642448102343, 43.6591221633683], [-79.3644998900192, 43.6597622879658]]}"
136	11618	 	2026-04-21	Laneway Reconstruction	[46.30 m N] DUNDAS ST W&lt;br&gt; From: BEVERLEY ST&lt;br&gt; To: [42.70 m W] BEVERLEY ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.394051714682, 43.6542702785192], [-79.3945509542036, 43.6541713678773]]}"
137	11621	 	2023-02-13	Local Road Rehabilitation	CORTLEIGH BLVD&lt;br&gt; From: AVENUE RD&lt;br&gt; To: MONA DR 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2026 - Q4 2026	Active	None	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4117758968158, 43.7130486454782], [-79.4135913428213, 43.7126674831447], [-79.4156786733477, 43.7122280026321], [-79.4162892475766, 43.7120934387677]]}"
138	11692	1	2024-03-14	Local Road Reconstruction	PEMBURY AVE&lt;br&gt; From: ST LEONARDS AVE&lt;br&gt; To: LAWRENCE BAYVIEW S [RAMP] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3811784911169, 43.7253741502017], [-79.3813193309742, 43.7259049593112], [-79.3813273725343, 43.7259176594103], [-79.3813346688747, 43.7259306107699], [-79.3813410972023, 43.7259437691566], [-79.3813467790345, 43.7259571959051], [-79.3813516042565, 43.7259707117765], [-79.3813556484378, 43.7259843897594], [-79.3813589837494, 43.7259981381162], [-79.3813613133955, 43.726012030349], [-79.3813628982468, 43.7260259569136], [-79.3813636153853, 43.7260399365849], [-79.381363586412, 43.7260539883918], [-79.3813626888584, 43.7260679033785], [-79.3813609223651, 43.7260818633695], [-79.3813582884783, 43.7260957135451], [-79.3813549087439, 43.7261095008379], [-79.3813515297026, 43.7261229361828], [-79.3813473504182, 43.7261393420064]]}"
139	11713	 	2024-06-26	Laneway Reconstruction	BARBARA BARRETT LANE&lt;br&gt; From: BRUNSWICK AVE&lt;br&gt; To: BORDEN ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4073084436925, 43.665493580025], [-79.4078890606607, 43.665356231679], [-79.4085026766956, 43.6652318318183]]}"
140	11721	 	2023-02-13	Local Road Rehabilitation	MACPHERSON AVE&lt;br&gt; From: [N] DAVENPORT RD [BRANCH]&lt;br&gt; To: [15.20 m W] DAVENPORT RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4036901216454, 43.6766801432083], [-79.4040959554037, 43.6765933111377]]}"
141	11765	 	2026-04-16	Major Road Reconstruction	DON MILLS RD&lt;br&gt; From: [230m S]OVERLEA BLVD&lt;br&gt; To: OVERLEA BLVD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2026 - 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	&lt;Null&gt; Transportation Roads State of Good Repair	RoadSOGR@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3337008213934, 43.7075795821829], [-79.3337275235195, 43.7077431947881], [-79.3337524325715, 43.7078723119132], [-79.3337693390237, 43.7080020654836], [-79.3337815818777, 43.7081401105361], [-79.333801432322, 43.7082728027901], [-79.3338195269054, 43.7083673712154], [-79.3338403814811, 43.708449259962], [-79.3338437356063, 43.708506269866], [-79.3338657546189, 43.7085794650742], [-79.3339195914619, 43.7087862151086], [-79.3339800147647, 43.7089625413933], [-79.3340369402652, 43.7091384746075], [-79.3341004300905, 43.7093369753892], [-79.3342038743859, 43.7095852939869], [-79.3343136679024, 43.709848466571], [-79.3343949810683, 43.7099964508938]]}"
142	11782	1	2024-03-14	Local Road Reconstruction	DAWLISH AVE&lt;br&gt; From: FIDELIA AVE&lt;br&gt; To: DANESWOOD RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3873757562745, 43.7229736520902], [-79.3870839377461, 43.7230690240233], [-79.386596054027, 43.7231698176319], [-79.3846013974838, 43.7235922398659], [-79.3819177709487, 43.7241363723062]]}"
143	11794	 	2023-05-19	Local Road Reconstruction	GIBSON ST&lt;br&gt; From: DUFFERIN ST&lt;br&gt; To: WESTMOUNT AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2028 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4470016686532, 43.6905738251561], [-79.447061790115, 43.6905918916155], [-79.4471245131365, 43.6905842794449], [-79.4471920812408, 43.6905684422923], [-79.4480879069253, 43.6903913695446]]}"
144	11828	 	2024-10-28	Laneway Reconstruction	[40.20 m S] INNES AVE&lt;br&gt; From: HABIBI LANE&lt;br&gt; To: [40.2 m N] NORMAN AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4566428105757, 43.6780566539711], [-79.4576392528267, 43.6804243690658]]}"
145	11851	1	2025-08-21	Local Road Reconstruction	ST LEONARDS AVE&lt;br&gt; From: [155 m W] MILDENHALL RD&lt;br&gt; To: LEWES CRES 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3868376928893, 43.7241643255961], [-79.3849823905845, 43.7245527091598], [-79.3840849904927, 43.7247559634183]]}"
146	11913	 	2024-06-26	Local Road Reconstruction	NEW HAVEN DR&lt;br&gt; From: GILGORM RD&lt;br&gt; To: SPADINA RD (TO) 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4179105080564, 43.7060097537411], [-79.4189712733396, 43.7057989887973], [-79.4190593243893, 43.7057765488975], [-79.4190946428576, 43.705754070718], [-79.4191132729259, 43.7057405828928]]}"
147	11993	TS2023-08-114	2024-06-14	Laneway Reconstruction	[37 m N] BEDFORD PARK AVE&lt;br&gt; From: AVENUE RD&lt;br&gt; To: GREY RD 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2026 - Q3 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Fulvio Naccarato, Engineering and Construction Services	fnaccar@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4167171115665, 43.7249710151449], [-79.4195982671343, 43.7243612752746]]}"
148	12065	 	2024-03-14	Local Road Reconstruction	STRATHEDEN RD&lt;br&gt; From: MILDENHALL RD&lt;br&gt; To: DANESWOOD RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3838624792093, 43.721721433073], [-79.3814786566566, 43.7222201386792]]}"
149	12096	 	2024-04-26	Local Road Reconstruction	MINUK ACRES&lt;br&gt; From: BEECHGROVE DR&lt;br&gt; To: [193 m S] BEECHGROVE DR [CUL-DE-SAC] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.1578992581969, 43.7663211783042], [-79.1579477710083, 43.7662314198049], [-79.1579588735707, 43.7660470235359], [-79.1579068533898, 43.765920147557], [-79.1573528687072, 43.7646543904454]]}"
150	12121	 	2025-10-31	Laneway Reconstruction	[40 m S] ST CLAIR AVE W&lt;br&gt; From: [39 m E] LANSDOWNE AVE (TO)&lt;br&gt; To: LANSDOWNE AVE (TO) 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4503959602035, 43.6758632648315], [-79.4499284342664, 43.6759758574483]]}"
151	12269	 	2024-08-14	Major Road Rehabilitation	GREENWOOD AVE&lt;br&gt; From: SPRINGDALE BLVD&lt;br&gt; To: QUEENSDALE AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Promil Sarkar, Engineering and Construction Services	psarkar@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3340637582019, 43.6854622211506], [-79.3344095530242, 43.6862688982361]]}"
152	12344	 	2026-04-21	Local Road Reconstruction	WEST HILL DR&lt;br&gt; From: LAWRENCE AVE E&lt;br&gt; To: KINGSTON RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.1798927774532, 43.7698408574246], [-79.180921252663, 43.7722488443744], [-79.1816823595394, 43.7740183311175], [-79.181731009347, 43.7741562734533], [-79.1817424416343, 43.7742377396766], [-79.1817559650317, 43.7743163124469]]}"
153	12379	 	2025-07-18	Local Road Rehabilitation	HAZEL AVE&lt;br&gt; From: FERNWOOD PARK AVE&lt;br&gt; To: BEECH AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q4 2026	Active	None	Transportation Services	Tony Rodrigues, Engineering and Construction Services	trodrig@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2884618650676, 43.6714813993987], [-79.2879610380909, 43.6716000288966], [-79.2872199936983, 43.6717511235502]]}"
154	12412	 	2024-06-26	Laneway Reconstruction	POULTER&apos;S LANE&lt;br&gt; From: MARKHAM ST&lt;br&gt; To: [55.50 m E] MARKHAM ST [CUL-DE-SAC] 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4120663249703, 43.6654395909042], [-79.4120217141538, 43.6654883987337], [-79.412074331673, 43.6656059291664]]}"
155	12441	TS2023-12-009	2024-06-26	Local Road Rehabilitation	ARCHER RD&lt;br&gt; From: BROWSIDE AVE&lt;br&gt; To: SPADINA RD (TO) 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2024 - Q3 2024	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4150224212979, 43.696282978252], [-79.4157924473889, 43.696086726832]]}"
156	12464	 	2024-01-17	Laneway Reconstruction	ALEXANDER PL&lt;br&gt; From: ALEXANDER ST&lt;br&gt; To: MAITLAND ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3794628415358, 43.6638277585622], [-79.3796143503058, 43.6641775689253], [-79.3798773197217, 43.6647847472791]]}"
157	12497	 	2022-08-31	Local Road Rehabilitation	FERNWOOD PARK AVE&lt;br&gt; From: FIR AVE&lt;br&gt; To: HAZEL AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q4 2026	Active	None	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2881650445252, 43.6703271470925], [-79.28817907089, 43.6704078969828], [-79.288402242705, 43.6709805696214], [-79.2884127267979, 43.6710213830359], [-79.2883999949919, 43.6710697145906], [-79.2883572749416, 43.6711330318403], [-79.2883355382896, 43.6711677547129], [-79.2883289174626, 43.6711991660805], [-79.2884618675573, 43.671481396703]]}"
158	12502	 	2025-09-10	Local Road Rehabilitation	WINONA DR&lt;br&gt; From: [W] GLOUCESTER GRV [BRANCH]&lt;br&gt; To: [E] GLOUCESTER GRV [BRANCH] 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2025	Active	None	Transportation Services	Cherry Chen, Engineering and Construction Services	cchen9@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4383663285969, 43.696450021006], [-79.4384007794188, 43.6965537587194]]}"
159	12516	 	2023-02-13	Laneway Reconstruction	[25 m N] ADELAIDE ST W&lt;br&gt; From: DUNCAN ST&lt;br&gt; To: [27.40 m W] DUNCAN ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3888050921048, 43.6485070667884], [-79.3892446711243, 43.6484187445784]]}"
160	12580	 	2024-06-26	Laneway Reconstruction	[38.10 m E] BATHURST ST&lt;br&gt; From: LENNOX ST&lt;br&gt; To: BLOOR ST W 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4100747489274, 43.6639637726958], [-79.4102218830197, 43.6643400146966], [-79.4105942123266, 43.6652543887795]]}"
161	12644	 	2024-08-14	Major Road Rehabilitation	GREENWOOD AVE&lt;br&gt; From: GLEBEHOLME BLVD&lt;br&gt; To: MILVERTON BLVD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Promil Sarkar, Engineering and Construction Services	psarkar@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3334189364099, 43.6839276597938], [-79.3337588108849, 43.6847137012434]]}"
162	12654	TS2023-10_11-435	2025-09-05	Local Road Reconstruction	AUGUSTA AVE&lt;br&gt; From: NASSAU ST&lt;br&gt; To: OXFORD ST (TO) 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4023360050878, 43.6552350592144], [-79.40268459094, 43.6560924157566]]}"
163	12740	 	2022-07-22	Laneway Reconstruction	[116.70 m W] RONCESVALLES AVE&lt;br&gt; From: GEOFFREY ST&lt;br&gt; To: GRENADIER RD 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4514451805993, 43.6476871556254], [-79.4515951399121, 43.6480977804842], [-79.4517427017002, 43.6485017971034]]}"
164	13022	TS2023-13-049	2024-04-25	Local Road Rehabilitation	ST PAUL ST&lt;br&gt; From: [E-W] SACKVILLE ST [LEG]&lt;br&gt; To: RAY LANE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2024 - Q4 2025 (Carry-Over)	Active	None	Transportation Services	Javier Saborio, Engineering and Construction Services	jsabori@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3601728138743, 43.6555520349636], [-79.3601904337114, 43.6556400546295], [-79.3603190377128, 43.6559653937652], [-79.3603520870864, 43.6560522368728], [-79.360355685286, 43.6560617016883]]}"
165	13058	 	2025-10-14	Local Road Rehabilitation	CARLTON ST&lt;br&gt; From: DERMOTT PL&lt;br&gt; To: SACKVILLE ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3665810096809, 43.6648000780788], [-79.3665330111327, 43.6648056856891], [-79.3663490728968, 43.6648465249815], [-79.3663342369936, 43.664849820127], [-79.3650544654706, 43.6651339478541]]}"
166	13059	 	2025-09-10	Local Road Rehabilitation	BOSWELL AVE&lt;br&gt; From: [240.80 m E] BEDFORD RD [END]&lt;br&gt; To: BEDFORD RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Angela Au, Engineering and Construction Services	aau2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3959798989538, 43.6726076617825], [-79.3988644329508, 43.6720084791832]]}"
167	13147	TS2023-10_11-435	2025-09-05	Local Road Reconstruction	AUGUSTA AVE&lt;br&gt; From: DUNDAS ST W&lt;br&gt; To: WALES AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4011469079516, 43.6522746021317], [-79.4012953953978, 43.6526519332193], [-79.401310162027, 43.6526894546233], [-79.4014380216955, 43.6530143590906], [-79.4015688258877, 43.6533468153691]]}"
168	13180	 	2025-10-14	Local Road Rehabilitation	MAUD ST&lt;br&gt; From: ADELAIDE ST W&lt;br&gt; To: RICHMOND ST W 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2026	Active	None	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3996280936983, 43.6459341203161], [-79.4001233301106, 43.6471866306743]]}"
169	13276	 	2025-10-31	Laneway Reconstruction	[119.70 m W] VIA ITALIA&lt;br&gt; From: AUBURN AVE&lt;br&gt; To: [34.40 m N] AUBURN AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4461915623151, 43.674627778711], [-79.4463538719074, 43.6750084237118]]}"
170	13312	 	2024-04-12	Major Road Rehabilitation	DUPONT ST&lt;br&gt; From: ST GEORGE ST (TO)&lt;br&gt; To: HURON ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q4 2026 - Q3 2027	Active	None	Transportation Services	Shahid Virk, Engineering and Construction Services	svirk@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.403600319043, 43.675594773861], [-79.4041738521104, 43.6754803452256], [-79.4047887916673, 43.6753576543882]]}"
171	13351	TS2023-08-414	2025-10-31	Local Road Rehabilitation	ORIOLE PKWY&lt;br&gt; From: ELWOOD BLVD&lt;br&gt; To: ROSELAWN AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2027 - Q4 2028	Active	None	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4072101079657, 43.7074777696901], [-79.4072759727031, 43.7077883597607], [-79.4073372664033, 43.7080404396191], [-79.4074163512529, 43.7083195376527], [-79.4074811493918, 43.7085536204118], [-79.4075478521891, 43.7088147093705], [-79.4076250520092, 43.7090443023238], [-79.4076714165776, 43.7091568556327]]}"
172	13499	 	2025-10-14	Local Road Rehabilitation	CARLTON ST&lt;br&gt; From: PARLIAMENT ST&lt;br&gt; To: BROADCAST LANE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3680571008485, 43.664463438273], [-79.3674857192746, 43.6645993879443]]}"
173	13542	1	2025-10-14	Local Road Reconstruction	ROCHESTER AVE&lt;br&gt; From: ST IVES CRES&lt;br&gt; To: LEWES CRES 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Rachele Joseph, Engineering and Construction Services	rgjoseph@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3894553293459, 43.7246704869109], [-79.3853886041248, 43.7255219245174]]}"
174	13544	 	2025-10-31	Laneway Reconstruction	[33.50 m W] DUFFERIN ST&lt;br&gt; From: WALLACE AVE&lt;br&gt; To: ARMSTRONG AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4375930489412, 43.6637435697705], [-79.4377521981833, 43.664152275056], [-79.4379324075646, 43.6646151687842]]}"
175	14256	TS2024-02-033	2026-01-14	Major Road Reconstruction	RATHBURN RD&lt;br&gt; From: ELMCREST RD&lt;br&gt; To: MILL RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Brian Nolan, Engineering and Construction Services	bnolan3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5868317826081, 43.6475271143042], [-79.5874367656735, 43.6471609078845], [-79.5874991567889, 43.6471217186069], [-79.5894788287718, 43.6458786051533], [-79.5900293986254, 43.6455330874282], [-79.5900630207061, 43.6455117727079]]}"
176	14685	 	2026-03-11	Laneway Reconstruction	LEADER LANE&lt;br&gt; From: COLBORNE ST&lt;br&gt; To: KING ST E 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3754504316776, 43.6489765510062], [-79.3755293657239, 43.6491712293307], [-79.3755633110524, 43.6492526295987], [-79.3757196347688, 43.6496404261973]]}"
177	14823	 	2026-04-21	Laneway Reconstruction	[31 m E] EILEEN AVE&lt;br&gt; From: [39 m N] FLORENCE AVE&lt;br&gt; To: [70 m N] FLORENCE AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4946385510168, 43.6699354210539], [-79.4949789913813, 43.6700994974601]]}"
178	14830	 	2026-04-21	Laneway Reconstruction	[34 m N] FLORENCE AVE&lt;br&gt; From: [54 m E] EILEEN AVE&lt;br&gt; To: EILEEN AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4949862032112, 43.6695973684542], [-79.4946385510168, 43.6699354210539], [-79.4945038551901, 43.6700663912139]]}"
179	14882	 	2026-03-19	Local Road Reconstruction	RIDELLE AVE&lt;br&gt; From: MARWOOD RD&lt;br&gt; To: FERNWOOD RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4352586953962, 43.7053528781632], [-79.4364077172101, 43.705102179694]]}"
180	14974	1	2025-08-21	Local Road Reconstruction	ST LEONARDS AVE&lt;br&gt; From: LEWES CRES&lt;br&gt; To: BAYVIEW AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3840849904927, 43.7247559634183], [-79.3821241626606, 43.7251647415177], [-79.3811784911169, 43.7253741502017], [-79.3811055734359, 43.7253902874149], [-79.380203634747, 43.7255848040467]]}"
181	15114	 	2026-04-01	Local Road Rehabilitation	PENROSE RD&lt;br&gt; From: DE-SAVERY CRES&lt;br&gt; To: MOUNT PLEASANT RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2026 - Q4 2027	Active	None	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3895303356371, 43.7030380540573], [-79.3881569271875, 43.7032932683942]]}"
182	15148	TS2023-13-044	2025-08-28	Local Road Reconstruction	SACKVILLE PL&lt;br&gt; From: WOODSTOCK PL&lt;br&gt; To: FLAGLER ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2025 - Q3 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.364759658338, 43.6659572730188], [-79.3646466576578, 43.6659828749929]]}"
183	15267	TS2023-11-101	2025-09-05	Local Road Reconstruction	KENSINGTON AVE (TO)&lt;br&gt; From: DUNDAS ST W&lt;br&gt; To: FITZROY TER 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3998708217879, 43.6525513319222], [-79.400183198789, 43.6533979036494], [-79.4001992199015, 43.6534389269145]]}"
184	15298	 	2021-04-12	Laneway Reconstruction	[32 m E] ST CLARENS AVE&lt;br&gt; From: COLLEGE ST (TO)&lt;br&gt; To: [27.80 m N] COLLEGE ST (TO) 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4382658698794, 43.6514385788415], [-79.4383769880856, 43.6517237208411]]}"
185	15326	 	2021-07-30	Laneway Rehabilitation	[43.30 m N] TYRREL AVE&lt;br&gt; From: CHRISTIE ST&lt;br&gt; To: [29.60 m E] RUSHTON RD 	Replacement of partial or entire laneway pavement structure for either partial or full laneway width. This could include the asphalt, concrete and underlying support materials. Repair, improvement or replacement of laneway drainage, curbs and associated areas. Work may include the closure of individual lanes or the entire laneway.	Q4 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4244727718885, 43.6786923885046], [-79.424953126144, 43.678584698081], [-79.4250050082343, 43.6785424259437], [-79.4255867536006, 43.678411215879]]}"
186	15470	TS2023-09-011	2023-02-13	Local Road Rehabilitation	ASCOT AVE&lt;br&gt; From: ST CLAIR GDNS&lt;br&gt; To: BOON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4459694905645, 43.6796988576399], [-79.4465083593762, 43.6795814989939], [-79.4471291729001, 43.6794463072249]]}"
187	15475	TS2023-09-011	2023-02-13	Local Road Rehabilitation	ASCOT AVE&lt;br&gt; From: DUFFERIN ST&lt;br&gt; To: ST CLAIR GDNS 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4439547821963, 43.6801495411554], [-79.4454150061561, 43.679822893364], [-79.4459694905645, 43.6796988576399]]}"
188	15487	 	2023-03-24	Major Road Reconstruction	BLOOR ST W&lt;br&gt; From: AVENUE RD&lt;br&gt; To: BEDFORD RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2023 - Q2 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Ahmed Bhabha, Engineering and Construction Services	abhabha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2023	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3941414146867, 43.6687202616384], [-79.3958757488491, 43.6683327872895], [-79.3973807881437, 43.6680332274401]]}"
189	15503	 	2023-02-13	Local Road Rehabilitation	MACPHERSON AVE&lt;br&gt; From: HURON ST&lt;br&gt; To: MADISON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4051682267088, 43.6763638637536], [-79.4063298369843, 43.6761221387338]]}"
190	15533	 	2023-03-24	Major Road Reconstruction	BLOOR ST W&lt;br&gt; From: BEDFORD RD&lt;br&gt; To: DEVONSHIRE PL 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2023 - Q2 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Ahmed Bhabha, Engineering and Construction Services	abhabha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2023	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3973807881437, 43.6680332274401], [-79.3983645805034, 43.667831627684]]}"
191	15617	 	2023-02-13	Local Road Rehabilitation	MACPHERSON AVE&lt;br&gt; From: SPADINA RD (TO)&lt;br&gt; To: WALMER RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4074931331635, 43.6758691741159], [-79.4080897468529, 43.6757501952466], [-79.4086770638926, 43.6756331312167]]}"
192	15622	 	2022-08-18	Laneway Reconstruction	NUNES LANE&lt;br&gt; From: MC FARLAND AVE&lt;br&gt; To: VIA ITALIA 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2026 - Q2 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4425101582618, 43.673247569697], [-79.4437645179198, 43.6729581349581]]}"
193	15696	TS2023-13-139	2023-09-26	Laneway Reconstruction	CALLAGHAN LANE&lt;br&gt; From: BERKELEY ST&lt;br&gt; To: PARLIAMENT ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2025 - Q3 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3675321846406, 43.6595666170583], [-79.3661821836771, 43.6598516538301]]}"
194	16020	 	2024-04-12	Major Road Rehabilitation	DUPONT ST&lt;br&gt; From: DAVENPORT RD&lt;br&gt; To: ST GEORGE ST (TO) 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q4 2026 - Q3 2027	Active	None	Transportation Services	Shahid Virk, Engineering and Construction Services	svirk@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4025942432102, 43.6758100166045], [-79.403600319043, 43.675594773861]]}"
195	16053	TS2023-13-001	2024-06-27	Major Road Reconstruction	GERRARD ST E&lt;br&gt; From: TILBURN PL&lt;br&gt; To: RATHMORE AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2029 - Q2 2032	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Sarmad Al-Douri, Engineering and Construction Services	saldour@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2818026874289, 43.687936378166], [-79.2808034597103, 43.6881509458582]]}"
196	16125	TS2024-09-008	2024-04-05	Major Road Reconstruction	DUFFERIN ST&lt;br&gt; From: DUPONT ST&lt;br&gt; To: GEARY AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2024 - Q3 2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Yang (Seamus) Liu, Engineering and Construction Services	sliu@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4390359214977, 43.6684648165049], [-79.4392790786271, 43.6689836989929], [-79.4392895711699, 43.6690064959376], [-79.4394758311778, 43.6694112099503], [-79.4395193759996, 43.6695390617975]]}"
197	16216	 	2024-03-14	Local Road Reconstruction	DANESWOOD RD&lt;br&gt; From: DAWLISH AVE&lt;br&gt; To: GLENALLAN RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3816147933836, 43.7231452424089], [-79.3816913465234, 43.7235596165761], [-79.3817351371492, 43.7236940450744], [-79.3818625949369, 43.7239984738434], [-79.3819177709487, 43.7241363723062]]}"
198	16241	 1	2024-03-14	Local Road Reconstruction	PROCTOR CRES&lt;br&gt; From: ROTHMERE DR&lt;br&gt; To: MILDENHALL RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3886777136323, 43.728769851871], [-79.3888309677892, 43.7291432921981], [-79.3889085643097, 43.7292759981522], [-79.3889395483323, 43.7293550465098], [-79.3889413069241, 43.7294566523656], [-79.3889333266775, 43.7295554133678], [-79.3889301180713, 43.7296386419724], [-79.3889271838447, 43.7297204927532], [-79.3889231083606, 43.7298220938335]]}"
199	16345	 	2024-10-28	Laneway Reconstruction	HABIBI LANE&lt;br&gt; From: CALEDONIA RD&lt;br&gt; To: GILBERT AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4569713816663, 43.6805719643924], [-79.4576392528267, 43.6804243690658], [-79.4582674458277, 43.6802855424369]]}"
200	16354	TS2023-11-241	2024-06-26	Laneway Reconstruction	[36.60 m N] BLOOR ST W&lt;br&gt; From: [35.10 m E] MARKHAM ST&lt;br&gt; To: MARKHAM ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4125770149826, 43.6653093092945], [-79.4121105824931, 43.6654042658881], [-79.4120663249703, 43.6654395909042]]}"
201	16546	 	2024-06-28	Major Road Rehabilitation	WELLESLEY ST E&lt;br&gt; From: JARVIS ST&lt;br&gt; To: WELLESLEY PL 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2026 - Q4 2026	Active	None	Transportation Services	Rooban Markandu, Engineering and Construction Services	rmarkan2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3783470452101, 43.6662853080065], [-79.3774153017427, 43.6664850775114], [-79.3773127709555, 43.6665039729333], [-79.3772673732739, 43.6665060593174], [-79.3771889515577, 43.6665157901478], [-79.376986444433, 43.6664726333384], [-79.3768000444419, 43.6664473341763], [-79.3766627877851, 43.666432284456], [-79.3765008836219, 43.6664289195821]]}"
202	16616	TS2023-08-092	2024-06-26	Local Road Reconstruction	GILGORM RD&lt;br&gt; From: EGLINTON AVE W&lt;br&gt; To: NEW HAVEN DR 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4170933784138, 43.7027823201514], [-79.4172531182922, 43.7033540116248], [-79.4176274947683, 43.7048709403106], [-79.4179105080564, 43.7060097537411]]}"
203	16641	 	2024-12-12	Laneway Reconstruction	LEADER LANE&lt;br&gt; From: WELLINGTON ST E&lt;br&gt; To: COLBORNE ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3751775496455, 43.6483447528471], [-79.3753269587146, 43.6486930796184], [-79.3754504316776, 43.6489765510062]]}"
204	16701	 	2024-06-26	Laneway Reconstruction	[23.20 m N] QUEEN ST E&lt;br&gt; From: JONES AVE&lt;br&gt; To: [30.50 m E] JONES AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2023 - Q4 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2023	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3329504462896, 43.6629909150906], [-79.3324316859436, 43.6631086314602]]}"
205	16729	TS2023-06_07-301	2024-06-21	Local Road Reconstruction	SENTINEL RD&lt;br&gt; From: GRANDRAVINE DR&lt;br&gt; To: LAMBERTON BLVD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2024 - Q4 2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4956576797227, 43.7516805909094], [-79.4957851261805, 43.751750424298], [-79.4958515122395, 43.7517703400838], [-79.4959177875805, 43.7517938842112], [-79.4959964927245, 43.7518194441049], [-79.4960643702896, 43.7518390357759], [-79.496123033533, 43.7518486627649], [-79.4962095750588, 43.7518616571009], [-79.4962542923808, 43.7518696174368], [-79.4963307619344, 43.7518860768128], [-79.4964156030577, 43.7518874413866], [-79.4964980964799, 43.7519025416579], [-79.4965898166639, 43.7519083709086], [-79.4966948843768, 43.7519376134956], [-79.4968959344254, 43.7519440972967], [-79.4970222130965, 43.7519649789414], [-79.497127281119, 43.7519942202306], [-79.4972333923803, 43.7520220392587], [-79.4973546649904, 43.7520620380644], [-79.4974302528735, 43.7520918895701], [-79.4975342649792, 43.7521417702134], [-79.4976295468306, 43.752182810502], [-79.4977049360446, 43.7522199077875], [-79.4978228051648, 43.7522750901515], [-79.4978913402718, 43.7523077306884], [-79.4979738066756, 43.7523420375541], [-79.4980639841615, 43.7523866238613], [-79.4981645191482, 43.7524360880141], [-79.4982814330221, 43.7524890726948], [-79.4983670909169, 43.7525346929316], [-79.4984539643572, 43.752590807619], [-79.4985164601967, 43.7526247960772], [-79.4985859107562, 43.7526788302588], [-79.4986510261448, 43.7527458521772], [-79.4987258412974, 43.7528046839751], [-79.4987864522099, 43.7528535071399], [-79.4988490376195, 43.752903087293], [-79.4989321995864, 43.7530044695063], [-79.4989576685949, 43.7530599810359], [-79.4990037760249, 43.7531096599641], [-79.499052131938, 43.7531876476622], [-79.4991116765112, 43.7532571202924], [-79.4991989755967, 43.7533719780316], [-79.4992660579152, 43.7534589678638], [-79.4993389643231, 43.7535518624751], [-79.4993761078269, 43.7536191475402], [-79.4994597321949, 43.7537408558645], [-79.4994927396691, 43.7537946570756], [-79.499578922753, 43.7538953655262]]}"
206	17027	 	2024-08-14	Major Road Rehabilitation	GREENWOOD AVE&lt;br&gt; From: STRATHMORE BLVD&lt;br&gt; To: GLEBEHOLME BLVD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Promil Sarkar, Engineering and Construction Services	psarkar@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3327160454509, 43.6822768313312], [-79.3334189364099, 43.6839276597938]]}"
207	17138	 	2025-09-05	Laneway Reconstruction	KENSINGTON PL&lt;br&gt; From: [39 m S] KENSINGTON PL [BRANCH]&lt;br&gt; To: [18.40 m N] KENSINGTON PL [BRANCH] 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4007499872934, 43.6534883485982], [-79.4007728925547, 43.6535424297249], [-79.4009048452257, 43.6538315822093], [-79.4009158626777, 43.6538557063899], [-79.4009701358288, 43.6539746595193]]}"
208	17170	 	2025-10-14	Local Road Rehabilitation	REGENT ST&lt;br&gt; From: ST DAVID WALK&lt;br&gt; To: ST BARTHOLOMEW ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2026	Active	None	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3640219901551, 43.6585296828335], [-79.3642448102343, 43.6591221633683]]}"
209	17237	 	2025-04-12	Local Road Reconstruction	JIMMY WISDOM WAY&lt;br&gt; From: LIVINGSTONE AVE&lt;br&gt; To: BELGRAVIA AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4476356665481, 43.6971054479328], [-79.4479434087337, 43.6978400862883]]}"
210	17391	 	2025-10-31	Laneway Reconstruction	[195.70 m N] DAVENPORT RD&lt;br&gt; From: ST CLARENS AVE&lt;br&gt; To: [36.10 m W] ST CLARENS AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4481827185954, 43.6734808102383], [-79.4487804363014, 43.6733499753259]]}"
211	17438	TS2023-24-430	2025-10-14	Major Road Reconstruction	SCARBOROUGH GOLF CLUB RD&lt;br&gt; From: LAWRENCE AVE E&lt;br&gt; To: BRIMORTON DR 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2025 - Q3 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Mehrshad Rahimi, Engineering and Construction Services	mrahimi@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2158381238168, 43.7618520435907], [-79.215828397595, 43.761950016156], [-79.2158324447904, 43.7620534695775], [-79.2158488821821, 43.7622024988695], [-79.2158485237521, 43.7623157526185], [-79.2158533224095, 43.7624097557626], [-79.2158620406353, 43.7625208357846], [-79.2158722112088, 43.7626349690136], [-79.2158872729591, 43.7627527229704], [-79.2159039667724, 43.7628665294621], [-79.2159326974007, 43.762993300559], [-79.2159616966173, 43.7630971913185], [-79.216003587844, 43.7632196925343], [-79.21606220225, 43.7633968796273], [-79.2161691132971, 43.763684334037], [-79.2162850205334, 43.7639235634562], [-79.2163939438197, 43.7641961499806], [-79.2164369274849, 43.7643170056097], [-79.2166796504369, 43.7648884954113], [-79.2177392055452, 43.7675540537722], [-79.2183042255374, 43.7688979326568], [-79.2186842206825, 43.7698112450039]]}"
212	17447	TS2023-13-044	2025-03-24	Local Road Reconstruction	SACKVILLE PL&lt;br&gt; From: BOWMAN ST&lt;br&gt; To: RAWLINGS AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2025 - Q3 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3641587769398, 43.6660933151395], [-79.3635261310259, 43.6662363354209]]}"
213	17453	TS2023-24-430	2025-10-14	Major Road Reconstruction	SCARBOROUGH GOLF CLUB RD&lt;br&gt; From: BRIMORTON DR&lt;br&gt; To: ELLESMERE RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2025 - Q3 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Mehrshad Rahimi, Engineering and Construction Services	mrahimi@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2186842206825, 43.7698112450039], [-79.2194785899252, 43.7717858741016], [-79.2200726388182, 43.7732636671943], [-79.2206551372909, 43.7747141361767], [-79.221052804192, 43.7756809894112], [-79.2214293864883, 43.776605839821], [-79.2214704733675, 43.7766988877025], [-79.2222172113688, 43.7785568936056]]}"
214	17502	 	2025-10-31	Local Road Reconstruction	DEWBOURNE AVE&lt;br&gt; From: BATHURST ST&lt;br&gt; To: CHILTERN HILL RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4247659211015, 43.6990228426484], [-79.4250754201436, 43.6988465982607], [-79.4252296354115, 43.6987770211974], [-79.4256101198034, 43.6986053269079], [-79.4258025337746, 43.6985525046097], [-79.426880109488, 43.6983304531931]]}"
215	17591	TS2023-11-101	2025-09-05	Local Road Reconstruction	KENSINGTON AVE (TO)&lt;br&gt; From: FITZROY TER&lt;br&gt; To: KENSINGTON PL 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4001992199015, 43.6534389269145], [-79.400279997395, 43.6536457378437], [-79.4003105474089, 43.6537239574635], [-79.4003885376535, 43.6539374358791]]}"
216	17683	 	2025-09-18	Local Road Reconstruction	MILITARY TRL&lt;br&gt; From: EAST HIGHLAND CREEK&lt;br&gt; To: HIGHCASTLE RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2022 - Q4 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2021	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2156789503788, 43.7840665592682], [-79.215622465804, 43.784112055445], [-79.2155803660269, 43.7841661573814], [-79.2155002979552, 43.784246188006], [-79.2150545239443, 43.7849107643258], [-79.2150073651678, 43.7849831689574], [-79.2149539848702, 43.7850365998439], [-79.2148845024549, 43.7851083438688], [-79.2148189818533, 43.7851620864484], [-79.214674615043, 43.7852967594842], [-79.2144252813211, 43.7854843740632], [-79.2141934273707, 43.785664403336], [-79.2141212818505, 43.7857338305359], [-79.2140508049784, 43.7857896611383], [-79.2140186270555, 43.7858154058046], [-79.2139814453889, 43.7858612923972]]}"
217	17826	TS2024-02-033	2026-01-14	Major Road Reconstruction	RATHBURN RD&lt;br&gt; From: MILL RD&lt;br&gt; To: DEAD END 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Brian Nolan, Engineering and Construction Services	bnolan3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5900630207061, 43.6455117727079], [-79.5902383845055, 43.6453794556182], [-79.5904179293046, 43.6452501306051], [-79.5906015585175, 43.6451238634358], [-79.5907616675944, 43.6449710813087], [-79.5909144107884, 43.6448143739136], [-79.5910596086761, 43.6446539277507], [-79.5911205140883, 43.6445945610926], [-79.5911747444221, 43.6445318737193], [-79.5912219606568, 43.6444662619708], [-79.5912618647072, 43.6443981392568]]}"
218	18044	 	2026-02-11	Local Road Reconstruction	QUEEN ELIZABETH BLVD&lt;br&gt; From: ROYAL YORK RD&lt;br&gt; To: CANMOTOR AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2026 - Q3 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Nicholas Mah, Engineering and Construction Services	nmah@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5024114897152, 43.62332421573], [-79.50238831985, 43.623231465748], [-79.5023765482619, 43.6231957871272], [-79.5023476768618, 43.6230885242889], [-79.502391564286, 43.6230560292091], [-79.5024931686164, 43.6230238542183], [-79.5059383076482, 43.6222961012901], [-79.5086603410743, 43.6217266767635], [-79.5104959110868, 43.6213926562924], [-79.5115732591841, 43.6211650507351], [-79.5117278712598, 43.6211414440896], [-79.5120476160102, 43.6211074512303], [-79.512187063814, 43.6211063553806], [-79.5122988421262, 43.621098267347], [-79.5125856955201, 43.6211110406292], [-79.5126262010587, 43.6211211699473], [-79.5127254676382, 43.6211613169201], [-79.5127903514855, 43.6212174982648], [-79.5128860912137, 43.6213816974857], [-79.5129525632846, 43.6215272517268], [-79.5129642841548, 43.6217029542579], [-79.5129053071663, 43.6218943803404], [-79.5128157886533, 43.6220136095358], [-79.5126016104699, 43.6222467337542], [-79.5125470483571, 43.6223629839086], [-79.5125368398686, 43.6224478349775], [-79.5125415420439, 43.6225485079798], [-79.5125764302078, 43.6226699961131], [-79.5127198820854, 43.6230366155614], [-79.5127314291368, 43.623095064896], [-79.5127345171743, 43.6231841361487], [-79.5127067126589, 43.6232585304477], [-79.5126600556551, 43.6232997503533], [-79.5126288101257, 43.6233273233097], [-79.5125609765848, 43.6233615613223], [-79.5124218206509, 43.6234032863331], [-79.5123754563584, 43.6234171796277], [-79.511436969647, 43.6236306790489]]}"
219	18080	 	2026-04-21	Laneway Reconstruction	[44.50 m N] DUNDAS ST W&lt;br&gt; From: [95.40 m E] HURON ST&lt;br&gt; To: HURON ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3958991824756, 43.6539042948101], [-79.3963577279059, 43.6538134539269]]}"
220	18147	 	2026-04-21	Laneway Reconstruction	[43.30 m N] DUNDAS ST W&lt;br&gt; From: HURON ST&lt;br&gt; To: [79.20 m W] HURON ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3963577279059, 43.6538134539269], [-79.3974500705277, 43.653578495542]]}"
221	18210	 	2025-11-17	Local Road Rehabilitation	WALES AVE&lt;br&gt; From: AUGUSTA AVE&lt;br&gt; To: DENISON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2027 - Q4 2028	Active	None	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4015688258877, 43.6533468153691], [-79.4026878065616, 43.6531114634911]]}"
222	18243	 	2026-04-21	Laneway Reconstruction	[43.70 m S] BALDWIN ST&lt;br&gt; From: HURON ST&lt;br&gt; To: [79.20 m W] HURON ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3967609641042, 43.6547857292458], [-79.397842054292, 43.6545627611997]]}"
223	18300	 	2026-03-19	Local Road Reconstruction	RIDELLE AVE&lt;br&gt; From: OVERDALE RD&lt;br&gt; To: MARWOOD RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4340824104198, 43.7055975320004], [-79.4352586953962, 43.7053528781632]]}"
224	18459	 	2023-03-24	Major Road Reconstruction	BLOOR ST W&lt;br&gt; From: ST GEORGE ST (TO)&lt;br&gt; To: HURON ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2023 - Q2 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Ahmed Bhabha, Engineering and Construction Services	abhabha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2023	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3998364722679, 43.6675168783568], [-79.4015389542218, 43.6671618641117]]}"
225	18480	TS2023-09-011	2023-02-13	Local Road Rehabilitation	ASCOT AVE&lt;br&gt; From: BOON AVE&lt;br&gt; To: EARLSCOURT AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4471291729001, 43.6794463072249], [-79.4483381993882, 43.6791741606789]]}"
226	18551	TS2023-13-097	2024-04-16	Local Road Rehabilitation	SEATON ST&lt;br&gt; From: SHUTER ST&lt;br&gt; To: DUNDAS ST E 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Angela Au, Engineering and Construction Services	aau2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.36862064895, 43.6563200859519], [-79.3686234388019, 43.6564347933699], [-79.3688276628731, 43.6569945761227], [-79.3688343056921, 43.6570127934754], [-79.3688388176363, 43.6570251665069], [-79.3688460151363, 43.6570448688177], [-79.3689648016937, 43.6573329654098], [-79.3693147465043, 43.6581815495749], [-79.3693565848024, 43.6582829993802], [-79.3695116514794, 43.6586590313533]]}"
227	18645	 	2023-05-09	Major Road Rehabilitation	DUNCAN ST&lt;br&gt; From: NELSON ST (TO)&lt;br&gt; To: RICHMOND ST W 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2027 - Q4 2027	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3889254829888, 43.6488121554155], [-79.389043209377, 43.6491094398326], [-79.3891808409803, 43.6494570313201]]}"
228	18665	 	2023-05-05	Laneway Reconstruction	[30.50 m S] QUEEN ST E&lt;br&gt; From: WINNIFRED AVE&lt;br&gt; To: CAROLINE AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Shahid Virk, Engineering and Construction Services	svirk@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.336150518089, 43.6615353680845], [-79.3356450503918, 43.6616500378625], [-79.3351735966844, 43.6617449271971]]}"
229	18736	 	2021-07-30	Laneway Rehabilitation	[84.40 m W] CHRISTIE ST&lt;br&gt; From: [39 m N] TYRREL AVE&lt;br&gt; To: ILFORD RD 	Replacement of partial or entire laneway pavement structure for either partial or full laneway width. This could include the asphalt, concrete and underlying support materials. Repair, improvement or replacement of laneway drainage, curbs and associated areas. Work may include the closure of individual lanes or the entire laneway.	Q4 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4255867536006, 43.678411215879], [-79.4257995807273, 43.678881537981]]}"
230	18777	TS2023-12-084	2023-02-13	Local Road Rehabilitation	COLLEGE VIEW AVE&lt;br&gt; From: ORIOLE PKWY&lt;br&gt; To: HIGHBOURNE RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2026 - Q4 2026	Active	None	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4050543772978, 43.7023348701479], [-79.4063385693134, 43.7020610206571]]}"
231	18801	TS2023-09-011	2023-02-13	Local Road Rehabilitation	ASCOT AVE&lt;br&gt; From: NAIRN AVE&lt;br&gt; To: HARVIE AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4495473959531, 43.6789139380522], [-79.4507281001754, 43.6786565635646]]}"
232	18830	 	2023-10-31	Laneway Reconstruction	[30.20 m N] BADEN ST&lt;br&gt; From: [30.50 m W] OSSINGTON AVE&lt;br&gt; To: [67.10 m W] OSSINGTON AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4217053427412, 43.6503902470876], [-79.4221133490483, 43.6503136226759]]}"
233	19069	 	2023-12-06	Local Road Rehabilitation	SNOOKER ST&lt;br&gt; From: HANNA AVE&lt;br&gt; To: ATLANTIC AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2027 - Q4 2027	Active	None	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4210127872498, 43.6394728683129], [-79.4205072940313, 43.6395829324299], [-79.4201913818353, 43.6396517204814], [-79.4201884569874, 43.6396515564146], [-79.4200008345386, 43.6396856350069]]}"
234	19128	 	2024-01-04	Local Road Reconstruction	[N-S] HILLSIDE DR [LEG]&lt;br&gt; From: GAMBLE AVE&lt;br&gt; To: [85 m S] GAMBLE AVE [END] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2019 - Q3 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3562022750222, 43.6884311460419], [-79.3561617189354, 43.6885266411123], [-79.3561387779063, 43.6886482252004], [-79.3561387539168, 43.6887106815864], [-79.3561366142216, 43.6887916149763], [-79.356143979534, 43.6889028749024], [-79.3561610067079, 43.688978331716], [-79.3561978341166, 43.6891046239681]]}"
235	19137	 	2023-05-19	Local Road Reconstruction	CLOVELLY AVE&lt;br&gt; From: OAKWOOD AVE&lt;br&gt; To: GLENHOLME AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2028 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4418148882369, 43.694986981084], [-79.4422965109564, 43.694883647374], [-79.4443384983444, 43.6944456048705]]}"
236	19164	TS2023-04-089	2024-06-26	Local Road Rehabilitation	EVANS AVE (TO)&lt;br&gt; From: ARDAGH ST&lt;br&gt; To: ANNETTE ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4850005380202, 43.6561965500742], [-79.4853256417031, 43.6569701684169], [-79.4858924359026, 43.6583188841092], [-79.486049605417, 43.6586927663044]]}"
237	19224	"TS2023-08-169
"	2024-04-25	Local Road Reconstruction	ROSELAWN AVE&lt;br&gt; From: ELMRIDGE DR&lt;br&gt; To: LYON CRT 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2025 - 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adel Roufail, Engineering and Construction Services	aroufai@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.438994439253, 43.7026791478934], [-79.4403057695744, 43.7024159677482]]}"
238	19246	 	2024-03-14	Local Road Reconstruction	[N-S] BRAESIDE RD [BRANCH]&lt;br&gt; From: HASLEMERE RD&lt;br&gt; To: BRAESIDE CRES 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3908941022949, 43.7299304336252], [-79.3905438757911, 43.7291351132711]]}"
239	19255	 	2024-04-10	Major Road Reconstruction	STEELES AVE E&lt;br&gt; From: BRIMLEY RD&lt;br&gt; To: MIDLAND AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q4 2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Brian Nolan, Engineering and Construction Services	bnolan3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2973325250841, 43.8259504750552], [-79.2965905096487, 43.8261287202774], [-79.2965858186382, 43.8261298460644], [-79.2959933857037, 43.826272150295], [-79.2954561631618, 43.8263959252406], [-79.2941324768324, 43.8267008885968], [-79.2939728335849, 43.8267377861768], [-79.2931126512135, 43.826936523393], [-79.2917460839233, 43.8272522790495], [-79.2913492036578, 43.8273439593373], [-79.2894795688682, 43.8277725977523], [-79.2875393354156, 43.828201042818], [-79.287202145524, 43.8282949348903]]}"
240	19319	TS2023-11-008	2024-06-26	Local Road Reconstruction	ALBANY AVE&lt;br&gt; From: [W] BARTON AVE [BRANCH]&lt;br&gt; To: WELLS ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.411166032323, 43.6683707897451], [-79.4114268214077, 43.6690129328934], [-79.4115134966097, 43.6692330780659], [-79.4119663434579, 43.6703831730007]]}"
241	19347	1	2024-03-14	Local Road Reconstruction	ST LEONARDS CRES&lt;br&gt; From: ST LEONARDS AVE&lt;br&gt; To: DAWLISH AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3887718742843, 43.7237594020805], [-79.3887339277786, 43.7237414616731], [-79.3886770081116, 43.723713854342], [-79.3885830754939, 43.723666937445], [-79.3884872590131, 43.7236186405419], [-79.3883819533554, 43.723559991862], [-79.3882425397906, 43.7234751692258], [-79.3881239918271, 43.723389637742], [-79.3880118406689, 43.7233156790014], [-79.3878695675333, 43.7232141098886], [-79.3876617295223, 43.7230827441636], [-79.3875622437126, 43.72301967183], [-79.3874907278577, 43.7229994827745], [-79.3874814849419, 43.722996863315], [-79.3873757562745, 43.7229736520902]]}"
242	19377	 	2024-12-12	Laneway Reconstruction	COLBORNE LANE&lt;br&gt; From: LEADER LANE&lt;br&gt; To: [29 m W] CHURCH ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3753269587146, 43.6486930796184], [-79.3744918944045, 43.6488825806721]]}"
243	19431	 1	2024-03-14	Local Road Reconstruction	CHELTENHAM AVE&lt;br&gt; From: ST IVES CRES&lt;br&gt; To: MILDENHALL RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3896602410674, 43.7256736537257], [-79.3895327540185, 43.7257001292561], [-79.3892730757739, 43.7257582708495], [-79.3866603171166, 43.7263022392061], [-79.3857736626135, 43.7264958670832]]}"
244	19442	1	2024-03-14	Local Road Reconstruction	ROCHESTER AVE&lt;br&gt; From: MILDENHALL RD&lt;br&gt; To: LEWES CRES 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Rachele Joseph, Engineering and Construction Services	rgjoseph@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3853886041248, 43.7255219245174], [-79.3839519974445, 43.7258025955114]]}"
245	19459	TS2023-13-001	2024-06-27	Major Road Reconstruction	GERRARD ST E&lt;br&gt; From: RATHMORE AVE&lt;br&gt; To: CLONMORE DR 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2029 - Q2 2032	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Sarmad Al-Douri, Engineering and Construction Services	saldour@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2808034597103, 43.6881509458582], [-79.2782247733673, 43.6887149349539], [-79.2781532794758, 43.6887363858347], [-79.2780668158708, 43.6887837349446]]}"
246	19506	 	2024-03-14	Local Road Reconstruction	MILDENHALL RD&lt;br&gt; From: BRAESIDE RD&lt;br&gt; To: [2 m E] BRAESIDE RD [CITY LIMITS] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3906478729751, 43.7299911294821], [-79.3908941022949, 43.7299304336252]]}"
247	19541	TS2023-15-006	2024-06-26	Local Road Reconstruction	BRIDLE PATH THE&lt;br&gt; From: [190 m N] POST RD&lt;br&gt; To: [350 m E] BAYVIEW AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2024 - Q2 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Matthew McAinsh, Engineering and Construction Services	mmcains@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3780820753087, 43.7393863376641], [-79.375655524588, 43.7398809959938], [-79.3754164417334, 43.7399281819757], [-79.3753322153297, 43.7399709044375], [-79.3752644649023, 43.7400135719084], [-79.37522303406, 43.7400443765641], [-79.3751875403775, 43.7400618739855], [-79.3751520330384, 43.7400793614797], [-79.3751138776274, 43.7400866575902], [-79.3750735064446, 43.740084842033], [-79.3750467370264, 43.7400795200553], [-79.3750265536145, 43.740071298779], [-79.3750010491297, 43.7400421879529], [-79.3749895840118, 43.739995566204], [-79.3749840549609, 43.7399356102399], [-79.3749772379396, 43.7398687570324], [-79.3749769068464, 43.7398172597968], [-79.3749711404811, 43.7397645675544], [-79.3749631836111, 43.7396715555544], [-79.3749402660273, 43.7395783021538], [-79.3748983366336, 43.7394556758636], [-79.3748588304262, 43.7393505136745], [-79.3748128240472, 43.7392923694233], [-79.3747785014396, 43.7392580281778], [-79.3747335132574, 43.7392296439423], [-79.3747010485269, 43.7392152883175]]}"
248	19550	 	2024-04-05	Local Road Reconstruction	DRAPER ST&lt;br&gt; From: FRONT ST W&lt;br&gt; To: WELLINGTON ST W 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2025 - Q3 2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Angela Au, Engineering and Construction Services	aau2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3975866728246, 43.6417692035288], [-79.3982472385781, 43.643300637109]]}"
249	19556	TS2023-13-001	2024-04-25	Major Road Reconstruction	GERRARD ST E&lt;br&gt; From: SHERBOURNE ST&lt;br&gt; To: CENTRAL HOSPITAL LANE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2027 - Q1 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marilia Cimini, Engineering and Construction Services	mcimini@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3722361254016, 43.6612269152213], [-79.3714388008979, 43.6614023360052]]}"
250	19574	 	2024-03-14	Local Road Reconstruction	GLENALLAN RD&lt;br&gt; From: MILDENHALL RD&lt;br&gt; To: DANESWOOD RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3842067678901, 43.7226071675237], [-79.3816147933836, 43.7231452424089]]}"
251	19670	TS2023-15-290	2024-03-14	Local Road Reconstruction	[E] WANLESS CRES [BRANCH]&lt;br&gt; From: BUCKINGHAM AVE&lt;br&gt; To: LAWRENCE AVE E 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3898692280134, 43.7268063967709], [-79.3898606757624, 43.7268139450712], [-79.3898435058525, 43.7268295096713], [-79.389826323171, 43.7268445881895], [-79.3898086797449, 43.7268611514654], [-79.3897915144474, 43.7268809556458], [-79.3897766920917, 43.7269023823061], [-79.3897282049896, 43.7269651002821], [-79.3896618767372, 43.7270370371875], [-79.3896140512742, 43.7271110883124], [-79.3895651208084, 43.7272061832458], [-79.3895301386397, 43.7273029577674], [-79.3895110684864, 43.7273865509427], [-79.3895042047883, 43.7274950632417], [-79.3895074426673, 43.7275844837754], [-79.3895222931819, 43.7276701179098], [-79.3895314578623, 43.7277907163564]]}"
252	19685	TS2023-08-230	2024-06-26	Local Road Reconstruction	NEW HAVEN DR&lt;br&gt; From: [49.80 m E] GILGORM RD [END]&lt;br&gt; To: GILGORM RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.417408604062, 43.7061309192784], [-79.4179105080564, 43.7060097537411]]}"
253	19692	 	2024-10-28	Laneway Reconstruction	[40.20 m N] NORMAN AVE&lt;br&gt; From: CALEDONIA RD&lt;br&gt; To: GILBERT AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4559741306975, 43.6782030316494], [-79.4566428105757, 43.6780566539711], [-79.4572603498788, 43.6779214734103]]}"
254	19722	TS2023-06_07-301	2024-06-21	Local Road Reconstruction	SENTINEL RD&lt;br&gt; From: SHEPPARD AVE W&lt;br&gt; To: STILECROFT DR 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2024 - Q4 2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.491850160701, 43.7436491508556], [-79.4919846606537, 43.743976244666], [-79.4919899356773, 43.7439890798659], [-79.4922405714424, 43.7445986151828], [-79.4922802047785, 43.7447025593652], [-79.4923030039636, 43.7448018865781], [-79.4923257895678, 43.7449012038824], [-79.4923445000958, 43.745041069566], [-79.4923770516071, 43.7452049784027], [-79.4924007053594, 43.7453240353992], [-79.4924013381764, 43.7453272398725], [-79.4925168784975, 43.7459087527128], [-79.4925853268331, 43.7469846537346], [-79.4926105768131, 43.7470666284757], [-79.4926272726266, 43.7471324985966], [-79.4926568540871, 43.7472207024407], [-79.4932497435437, 43.7486062831026], [-79.4936034952622, 43.7493576277629], [-79.4938019613215, 43.7497105660265], [-79.4941939944994, 43.7504412017151]]}"
255	19773	 	2024-07-23	Local Road Rehabilitation	BALMORAL AVE&lt;br&gt; From: POPLAR PLAINS RD&lt;br&gt; To: WARREN RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2026 - Q4 2026	Active	None	Transportation Services	Bill Dakogiannis, Engineering and Construction Services	bdakogi@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.403098067211, 43.6842575369334], [-79.4032636209406, 43.6842311764075], [-79.405550262297, 43.6837768780741]]}"
256	19782	TS2023-13-001	2024-04-25	Major Road Reconstruction	[N] GERRARD ST E [BRANCH]&lt;br&gt; From: GERRARD ST E&lt;br&gt; To: PARLIAMENT ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2027 - Q1 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marilia Cimini, Engineering and Construction Services	mcimini@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3681759581657, 43.6621129619358], [-79.3671914091739, 43.6623343336908]]}"
257	19794	 	2025-04-12	Laneway Reconstruction	[42.70 m S] NORTHUMBERLAND ST&lt;br&gt; From: [37.80 m W] OSSINGTON AVE&lt;br&gt; To: CONCORD AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4270812951849, 43.6623513366051], [-79.4265170795357, 43.6624741982785]]}"
258	19811	 	2024-11-14	Local Road Reconstruction	MITRE PL&lt;br&gt; From: HOLYWELL DR&lt;br&gt; To: HOLYWELL DR 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2025 - Q1 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Martina Betkova, Engineering and Construction Services	mbetkov@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5540771446468, 43.6887890391888], [-79.553917401962, 43.6886250047371], [-79.5538202859574, 43.6885259119776], [-79.5537166795524, 43.6884079122508], [-79.5536486863355, 43.6883190041267], [-79.5535904664044, 43.6881991116004], [-79.5535590488738, 43.6881031130436], [-79.5535355356589, 43.688010126211], [-79.5535167285522, 43.6879797565246], [-79.5534826918169, 43.6879525534185], [-79.5534515352455, 43.6879419545569], [-79.5533842784569, 43.6879424882594], [-79.5533342255082, 43.687942006651], [-79.5532895510738, 43.6879639618585], [-79.553198942574, 43.6879988886079], [-79.5530882438889, 43.688040764621], [-79.5526545907676, 43.6881798192757], [-79.5526215137251, 43.6881873127885], [-79.5525127692641, 43.6882107598793], [-79.5524357015741, 43.6882426184583], [-79.5524173913862, 43.6883151098341], [-79.552472969827, 43.6884212168754], [-79.5525248771413, 43.6885149667886], [-79.5525753931213, 43.6886630023605], [-79.5526250563884, 43.6887860317862], [-79.5527156074446, 43.6889273959899], [-79.552810292546, 43.6890438075051], [-79.5530985528429, 43.6893453714308]]}"
259	19813	 	2024-08-14	Major Road Rehabilitation	GREENWOOD AVE&lt;br&gt; From: MILVERTON BLVD&lt;br&gt; To: [34.60 m N] MILVERTON BLVD [CITY LIMITS] 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Promil Sarkar, Engineering and Construction Services	psarkar@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3337588108849, 43.6847137012434], [-79.3339042258784, 43.6850841471032]]}"
260	19836	 	2024-08-14	Major Road Rehabilitation	GREENWOOD AVE&lt;br&gt; From: QUEENSDALE AVE&lt;br&gt; To: SAMMON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Promil Sarkar, Engineering and Construction Services	psarkar@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3344095530242, 43.6862688982361], [-79.3346688950647, 43.6868847097714]]}"
261	19847	 	2024-12-20	Local Road Rehabilitation	MERRILL AVE E&lt;br&gt; From: MOBERLY AVE&lt;br&gt; To: WOODBINE AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2027 - Q4 2028	Active	None	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3131251812728, 43.6831350216294], [-79.3123878319493, 43.6833013299465], [-79.3118424441681, 43.6834243536101]]}"
262	19907	 	2025-04-12	Local Road Reconstruction	JIMMY WISDOM WAY&lt;br&gt; From: BELGRAVIA AVE&lt;br&gt; To: WHITMORE AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4479434087337, 43.6978400862883], [-79.4482622786283, 43.6985974849065]]}"
263	19920	TS2024-10_11-027	2025-03-19	Major Road Rehabilitation	[E] UNIVERSITY AVE [BRANCH]&lt;br&gt; From: GERRARD ST W&lt;br&gt; To: COLLEGE ST (TO) 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2027 (Carry-Over)	Active	None	Transportation Services	Manveer Ramburrun, Engineering and Construction Services	mrambur@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3893409813778, 43.6575640997989], [-79.3894883341719, 43.6579171042221], [-79.3897756908862, 43.6585848316182], [-79.3898303978546, 43.6587063485372], [-79.3901430171427, 43.6594579936092], [-79.3903322673134, 43.6598935461179]]}"
264	19956	TS2023-14-293	2023-09-25	Laneway Reconstruction	[26.20 m E] LOGAN AVE&lt;br&gt; From: LANGLEY AVE&lt;br&gt; To: RIVERDALE AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2025 - Q3 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.345680498002, 43.6694958180803], [-79.3458495631847, 43.6699107707319], [-79.3460254936088, 43.6703425450318]]}"
265	19969	TS2023-03-443	2025-06-03	Local Road Reconstruction	ALBRIGHT AVE&lt;br&gt; From: FOCH AVE&lt;br&gt; To: SUNSET AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2026 - Q1 2031	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Shailaja Patel, Engineering and Construction Services	spatelz@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5469216237026, 43.5976659312271], [-79.5481067030705, 43.5973842902768], [-79.5494843735706, 43.5970827623519], [-79.5496921738215, 43.5970175071547]]}"
266	20099	 	2022-08-29	Laneway Reconstruction	[45.70 m E] BEECH AVE&lt;br&gt; From: CEDAR AVE&lt;br&gt; To: PINE AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2875937208785, 43.674543323986], [-79.2879796582391, 43.6754832201276], [-79.2883565320521, 43.6764082458593]]}"
267	20127	TS2023-20-173	2026-03-19	Local Road Reconstruction	PARKCREST DR&lt;br&gt; From: HILL CRES&lt;br&gt; To: 126 m S KINGSTON RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q2 2027 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Gabor Szakter, Engineering and Construction Services	gszakte@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2160018111796, 43.7326164714789], [-79.2163601447073, 43.7334635133611], [-79.2168030130416, 43.7344996613504], [-79.2168560133695, 43.7346168004549], [-79.2168920696714, 43.7347068956969], [-79.2169281959793, 43.7347789895541], [-79.2169760113981, 43.7348421120208], [-79.2170331385244, 43.7349052575197], [-79.2170709850669, 43.7349413623993], [-79.2171204895772, 43.7349774772163], [-79.2171629914554, 43.735013583685], [-79.2172542159454, 43.7350858128629], [-79.2173153276073, 43.7351219653079], [-79.2174346218274, 43.7351672591917], [-79.2175228666099, 43.7352124780208], [-79.2176344434893, 43.735248761302], [-79.2177204380888, 43.7352759638739], [-79.2178103182339, 43.7353031939763], [-79.2178677350827, 43.7353033231135], [-79.2179391175277, 43.7353034965873], [-79.2180096346661, 43.7353216694256], [-79.2180972756157, 43.7353308832327], [-79.2181763745795, 43.7353400759115], [-79.2182368948968, 43.7353402224167], [-79.2183215155728, 43.7353314261625], [-79.2184014685945, 43.7353226183462], [-79.2185365579262, 43.7353049423375], [-79.2186973301611, 43.7352693260355], [-79.2188441885773, 43.7352246839619], [-79.2189389312257, 43.7352069010244], [-79.2190492752979, 43.7351711620143]]}"
268	20147	 	2026-04-21	Laneway Reconstruction	[79.20 m W] HURON ST&lt;br&gt; From: DUNDAS ST W&lt;br&gt; To: D&apos;ARCY ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3972709063245, 43.6531172627229], [-79.3974500705277, 43.653578495542], [-79.3976430744263, 43.654075299388]]}"
269	20207	1	2024-03-14	Local Road Reconstruction	ROTHMERE DR&lt;br&gt; From: BRAESIDE RD&lt;br&gt; To: MILDENHALL RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3902974312957, 43.7284420446276], [-79.390213770356, 43.7284405583093], [-79.3886777136323, 43.728769851871], [-79.3885095242891, 43.7288058162057], [-79.3883398209852, 43.728842129862], [-79.3881624285215, 43.728887391073], [-79.3879871415069, 43.7289490273205], [-79.3878278937659, 43.7290094017647], [-79.3868903087035, 43.7293062854974]]}"
270	20320	 	2023-05-05	Laneway Reconstruction	[30 m E] WINNIFRED AVE&lt;br&gt; From: [33.50 m N] EASTERN AVE&lt;br&gt; To: [35.10 m S] QUEEN ST E 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Shahid Virk, Engineering and Construction Services	svirk@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3348009845398, 43.6596999376606], [-79.3356450503918, 43.6616500378625]]}"
271	20448	 	2023-02-13	Local Road Rehabilitation	ROSELAWN AVE&lt;br&gt; From: CASTLEWOOD RD&lt;br&gt; To: LATIMER AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2026 - Q4 2026	Active	None	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4162242647162, 43.7073587030923], [-79.4170993159339, 43.7071568142802]]}"
272	20475	 	2024-12-12	Laneway Reconstruction	COLBORNE LANE&lt;br&gt; From: [30.50 m N] WELLINGTON ST E&lt;br&gt; To: COLBORNE ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3744918944045, 43.6488825806721], [-79.3746058771626, 43.6491629649767]]}"
273	20514	 	2026-04-21	Laneway Reconstruction	[46.30 m N] DUNDAS ST W&lt;br&gt; From: [42.70 m W] BEVERLEY ST&lt;br&gt; To: [95.40 m E] HURON ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3945509542036, 43.6541713678773], [-79.3958991824756, 43.6539042948101]]}"
274	20560	 	2024-04-16	Local Road Rehabilitation	SEATON ST&lt;br&gt; From: GERRARD ST E&lt;br&gt; To: CARLTON ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Angela Au, Engineering and Construction Services	aau2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3707022026958, 43.6615644097245], [-79.3708667424657, 43.6619573872842], [-79.3708772649237, 43.6619825039129], [-79.3713166724191, 43.6630318662645], [-79.3713360896155, 43.6630782540242], [-79.3715181257567, 43.6635129822445]]}"
275	20574	 	2021-04-12	Laneway Reconstruction	[33.20 m N] DOUGLAS AVE&lt;br&gt; From: JEDBURGH RD&lt;br&gt; To: GREER RD 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2024 - Q3 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4063354943867, 43.7262409379777], [-79.4095119643438, 43.725568889742]]}"
276	20611	 	2023-05-19	Local Road Reconstruction	HOPEWELL AVE&lt;br&gt; From: Jimmy Wisdom Way&lt;br&gt; To: DUFFERIN ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2028 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4485519869181, 43.6993205079126], [-79.4500749112898, 43.6990174879929], [-79.4502373179003, 43.6989758468592], [-79.4503977112861, 43.6989214588022], [-79.4505394784797, 43.6988579801655], [-79.4506672668563, 43.6988203380082], [-79.4509256579014, 43.6987636331241], [-79.451305430912, 43.6986934775011]]}"
277	20674	 	2026-03-02	Local Road Reconstruction	DOVER AVE&lt;br&gt; From: BROWNS LINE&lt;br&gt; To: LLOYD GEORGE AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Nicholas Mah, Engineering and Construction Services	nmah@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5425605950632, 43.5957686235557], [-79.5429486575409, 43.5956784261486], [-79.5430568545606, 43.5956595238175], [-79.5445517101717, 43.595319512755]]}"
278	20677	 	2023-05-19	Local Road Reconstruction	HOPEWELL AVE&lt;br&gt; From: MARLEE AVE&lt;br&gt; To: TIMES RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2028 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4406106476053, 43.7010844340071], [-79.443447899153, 43.7004764339604], [-79.4452427008093, 43.7000898071295], [-79.4453636692644, 43.7000476715019], [-79.44544233942, 43.7000148165905], [-79.445502550132, 43.6999812246217], [-79.4456050737352, 43.6999383454378]]}"
279	20686	 	2025-10-30	Local Road Reconstruction	[E-W] RIPLEY AVE [LEG]&lt;br&gt; From: SOUTH KINGSWAY&lt;br&gt; To: RIPLEY AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4752735104859, 43.6367801192758], [-79.4750956391247, 43.6368789671545], [-79.4747420438052, 43.6370114124302], [-79.4746954643346, 43.6370258151427], [-79.4746477260908, 43.6370488949118], [-79.4746018648908, 43.6370880704496], [-79.4745885493667, 43.63714595808], [-79.4745930727818, 43.6371820456265]]}"
280	20694	 	2024-03-14	Local Road Reconstruction	HASLEMERE RD&lt;br&gt; From: LANGTON AVE&lt;br&gt; To: BRAESIDE RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3920647101273, 43.7297043106476], [-79.3908941022949, 43.7299304336252]]}"
281	20782	 	2024-10-03	Local Road Rehabilitation	MONOGRAM PL&lt;br&gt; From: ISLINGTON AVE&lt;br&gt; To: [149 m W] ISLINGTON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q4 2026	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5504401887582, 43.7051093412847], [-79.5506397989713, 43.7050555343207], [-79.5508200971026, 43.7049970549325], [-79.5509842798765, 43.7049432352074], [-79.5511516757264, 43.7048730764941], [-79.5513576867354, 43.7047725397907], [-79.5516055295401, 43.7046182714259], [-79.551679571599, 43.7045925357325], [-79.5521526839498, 43.704483706961]]}"
282	20821	 	2024-04-05	Laneway Reconstruction	[38.10 m N] BLOOR ST W&lt;br&gt; From: DORVAL RD&lt;br&gt; To: INDIAN RD 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2024 - Q3 2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.45445936145, 43.656382165673], [-79.4569734001402, 43.6558233058766]]}"
283	20835	 	2026-02-18	Local Road Reconstruction	LANGTON AVE&lt;br&gt; From: HASLEMERE RD&lt;br&gt; To: BRAESIDE RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3920647101273, 43.7297043106476], [-79.3923982481767, 43.7305233036032]]}"
284	20861	 	2023-06-30	Local Road Reconstruction	TOFFEE CRT&lt;br&gt; From: NEW TORONTO ST&lt;br&gt; To: [128 m S] NEW TORONTO ST [CUL-DE-SAC] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5071503790768, 43.6053718274852], [-79.5076735563786, 43.6065277727074]]}"
285	20902	 	2022-08-29	Laneway Reconstruction	[30.50 m N] WALLACE AVE&lt;br&gt; From: [33.50 m E] EMERSON AVE&lt;br&gt; To: EMERSON AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4425523348517, 43.6631192100523], [-79.4419968763231, 43.6632356139409]]}"
286	20920	TS2023-11-029	2024-06-26	Local Road Rehabilitation	HERRICK ST&lt;br&gt; From: MARKHAM ST&lt;br&gt; To: PALMERSTON BLVD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2024 - Q3 2024	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4114576723732, 43.6624292964346], [-79.4126645578283, 43.662169279564]]}"
287	20929	"TS2023-08-169
"	2024-04-25	Local Road Reconstruction	ELM RIDGE DR&lt;br&gt; From: [W] WILLIAM R ALLEN RD [BRIDGE]&lt;br&gt; To: [163.50 m] ROSELAWN AVE [CITY LIMITS] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2025 - 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adel Roufail, Engineering and Construction Services	aroufai@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4378387212772, 43.7029345485977], [-79.438994439253, 43.7026791478934]]}"
288	20966	 	2025-10-31	Laneway Reconstruction	[36.60 m N] QUEEN ST W&lt;br&gt; From: MACDONELL AVE&lt;br&gt; To: FULLER AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4380817460055, 43.6407411385031], [-79.4386550799761, 43.6406342394106], [-79.4392718356435, 43.6405192070685]]}"
289	21076	 	2024-12-12	Local Road Reconstruction	COLBORNE ST&lt;br&gt; From: LEADER LANE&lt;br&gt; To: CHURCH ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3754504316776, 43.6489765510062], [-79.3753002386409, 43.6490118796407], [-79.3746058771626, 43.6491629649767], [-79.3741453385907, 43.6492626935461]]}"
290	21126	 	2024-04-12	Major Road Rehabilitation	DUPONT ST&lt;br&gt; From: HURON ST&lt;br&gt; To: MADISON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q4 2026 - Q3 2027	Active	None	Transportation Services	Shahid Virk, Engineering and Construction Services	svirk@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4047887916673, 43.6753576543882], [-79.4059769635791, 43.6751085658455]]}"
291	21160	 	2025-04-12	Laneway Reconstruction	[38.10 m E] SHAW ST&lt;br&gt; From: PENDRITH ST&lt;br&gt; To: ESSEX ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4242734711621, 43.6665027197421], [-79.4246526071723, 43.6674602190107]]}"
292	21190	 	2025-10-31	Local Road Reconstruction	WESTSIDE DR&lt;br&gt; From: THE WEST MALL&lt;br&gt; To: [457 m S/W] THE WEST MALL 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5662236039272, 43.6166682167921], [-79.5657476618787, 43.616804970045], [-79.5635206300727, 43.617310243505], [-79.5635340313081, 43.6174107197341], [-79.563620988626, 43.6177053776336], [-79.5636447908434, 43.6178570111825], [-79.5636253016292, 43.6180544599082], [-79.5635822375292, 43.6183091383118], [-79.5635705678914, 43.6184436474947], [-79.5635431880623, 43.6186267730273], [-79.5635512638389, 43.6188184850922], [-79.5635829218135, 43.6189644010616], [-79.563603489938, 43.6190131331591]]}"
293	21244	 	2023-12-08	Laneway Reconstruction	[27.40 m S] COLLEGE ST (TO)&lt;br&gt; From: BEATRICE ST&lt;br&gt; To: [30.50 m W] BEATRICE ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2025 - Q2 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4166022309284, 43.6547698076285], [-79.4171087607406, 43.6546673031688]]}"
294	21248	 	2026-02-18	Local Road Reconstruction	HASLEMERE RD&lt;br&gt; From: KAPPELE AVE&lt;br&gt; To: LANGTON AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3937229185515, 43.7293319729461], [-79.3920647101273, 43.7297043106476]]}"
295	21316	 	2025-04-12	Laneway Reconstruction	[30.50 m N] QUEEN ST W&lt;br&gt; From: DOVERCOURT RD&lt;br&gt; To: LISGAR ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.422546740236, 43.6438386322858], [-79.4231276282313, 43.6437226564523], [-79.42375343732, 43.6435962462406]]}"
296	21345	 	2023-12-08	Laneway Reconstruction	[30.50 m W] BEATRICE ST&lt;br&gt; From: [36.60 m N] DUNDAS ST W&lt;br&gt; To: [30.50 m S] COLLEGE ST (TO) 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2025 - Q2 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4155810547327, 43.6508007945212], [-79.4171087607406, 43.6546673031688], [-79.4171565928882, 43.6547878740736]]}"
297	21349	TS2023-10_11-435	2025-09-05	Local Road Reconstruction	AUGUSTA AVE&lt;br&gt; From: DENISON SQ&lt;br&gt; To: BALDWIN ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4017770621429, 43.6538823519038], [-79.4019129489346, 43.6542119676772], [-79.4019161459722, 43.654219729588], [-79.4020351684402, 43.6545084150705]]}"
298	21355	 1	2024-03-14	Local Road Reconstruction	BUCKINGHAM AVE&lt;br&gt; From: WANLESS CRES&lt;br&gt; To: MILDENHALL RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3898757853593, 43.726695999282], [-79.386156918345, 43.7274497588323]]}"
299	21397	TS2023-11-186	2025-10-31	Local Road Reconstruction	GLENROSE AVE&lt;br&gt; From: CLIFTON RD&lt;br&gt; To: [E] GLENROSE AVE [END] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3839793704392, 43.6892205433723], [-79.3832170202299, 43.6893831118331]]}"
300	21464	 	2025-09-10	Local Road Rehabilitation	WINONA DR&lt;br&gt; From: CLOVELLY AVE&lt;br&gt; To: [W] GLOUCESTER GRV [BRANCH] 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2025	Active	None	Transportation Services	Cherry Chen, Engineering and Construction Services	cchen9@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4380315034335, 43.6956078171111], [-79.4383663285969, 43.696450021006]]}"
301	21465	 	2025-09-10	Local Road Rehabilitation	WINONA DR&lt;br&gt; From: LANARK AVE&lt;br&gt; To: EGLINTON AVE W 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2025	Active	None	Transportation Services	Cherry Chen, Engineering and Construction Services	cchen9@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.438721019606, 43.6972723920108], [-79.4388960372676, 43.6977113929368], [-79.439054621064, 43.6981091760147]]}"
302	21537	 	2025-10-14	Local Road Reconstruction	[S] HIGHLAND AVE [BRANCH]&lt;br&gt; From: HIGHLAND GDNS&lt;br&gt; To: [45.70 m E] HIGHLAND GDNS 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3815816319326, 43.6824393660884], [-79.3814447258037, 43.6824678015376], [-79.3813885925331, 43.6824748876452], [-79.3813334539154, 43.6824769736302], [-79.3812753746204, 43.6824733407027], [-79.3812202555661, 43.682466138202], [-79.38114841278, 43.6824510592442], [-79.3810608091521, 43.6824335694948]]}"
303	21543	TS2023-10_11-435	2025-09-05	Local Road Reconstruction	AUGUSTA AVE&lt;br&gt; From: BALDWIN ST&lt;br&gt; To: NASSAU ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4020351684402, 43.6545084150705], [-79.4023360050878, 43.6552350592144]]}"
304	21561	 	2025-12-03	Laneway Reconstruction	FITZROY TER&lt;br&gt; From: [50 m W] KENSINGTON AVE (TO)&lt;br&gt; To: [52 m W] KENSINGTON AVE (TO) [END] 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4007953113884, 43.6533083689239], [-79.4009283472529, 43.6532792298905]]}"
305	21595	 	2025-09-18	Local Road Reconstruction	MILITARY TRL&lt;br&gt; From: ELLESMERE RD&lt;br&gt; To: EAST HIGHLAND CREEK 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2022 - Q4 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2021	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2171425832307, 43.779752592019], [-79.2172054230981, 43.7798897828557], [-79.2172618688727, 43.7800130240546], [-79.2172988738821, 43.780093496774], [-79.2173281849658, 43.7801560930678], [-79.2173465597279, 43.7802276805612], [-79.2173509862785, 43.7802904196302], [-79.2173631534842, 43.7803532336477], [-79.2173636959151, 43.7804071329807], [-79.2173571732176, 43.7804789541351], [-79.2173460341897, 43.780541761821], [-79.2173264150536, 43.780595574385], [-79.21731141708, 43.7806494541822], [-79.2172956345333, 43.7807034670535], [-79.217279839068, 43.7807575789029], [-79.2172578313647, 43.7808117923965], [-79.2172389049035, 43.7808659505004], [-79.2172160313002, 43.7809378040969], [-79.2171947128177, 43.7810094464084], [-79.217173380283, 43.7810811597892], [-79.2171615409991, 43.7811261542425], [-79.2171426645065, 43.7811802143386], [-79.2171345661565, 43.7812433382607], [-79.2171280744207, 43.7812974470062], [-79.2171239324524, 43.7813514535526], [-79.2171236488227, 43.7814145077019], [-79.2171311298462, 43.7814775819681], [-79.2171339262548, 43.781540589732], [-79.21713825793, 43.7815944381251], [-79.2171433243883, 43.781666354542], [-79.2171569614542, 43.7817383731783], [-79.217172175822, 43.7817923214087], [-79.2171893754062, 43.7818547275276], [-79.2172072947776, 43.7819170445125], [-79.2172370945157, 43.7819707596857], [-79.2172779743002, 43.782024890209], [-79.2173119392395, 43.7820700294696], [-79.217340550313, 43.7821152814953], [-79.217378524429, 43.7821425003634], [-79.2174474739798, 43.7821878088975], [-79.2174954457882, 43.7822239545775], [-79.2175449514165, 43.782250985865], [-79.2175834386567, 43.7822777099693], [-79.2176093051846, 43.7823040509335], [-79.2176428873181, 43.7823303029394], [-79.2176824863478, 43.7823929821411], [-79.2177006717272, 43.7824200323033], [-79.2177267533991, 43.7824561220146], [-79.2177400525637, 43.7824921441479], [-79.2177549791326, 43.7825464156244], [-79.2177566365231, 43.7825931464741], [-79.2177474653666, 43.782638806449], [-79.2177256249172, 43.7826729928751], [-79.2177038361854, 43.7826990873932], [-79.2176712160266, 43.7827350114077], [-79.217627770915, 43.782779909816], [-79.2175847576316, 43.7828251693205], [-79.2175221552344, 43.7828910749319], [-79.217472705271, 43.7829262453011], [-79.2173183419151, 43.7830335893412], [-79.2171999969881, 43.7831249651533], [-79.2171161848366, 43.783206697879], [-79.2170426374135, 43.7832694077293], [-79.2169586035712, 43.78331377423], [-79.2168539765475, 43.783385580054], [-79.2167740827737, 43.7834213785823], [-79.2166983104, 43.783466026396], [-79.2166161520425, 43.7835106583254], [-79.2164667164212, 43.7835920469162], [-79.2163552876332, 43.7836548684647], [-79.2162462067748, 43.7837176867319], [-79.2161471429289, 43.7837821418777], [-79.2160599622416, 43.7838351040929], [-79.2156789503788, 43.7840665592682]]}"
306	21601	 	2026-03-19	Local Road Reconstruction	RIDELLE AVE&lt;br&gt; From: LAWNHURST BLVD&lt;br&gt; To: BURMONT RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4306603358075, 43.7063224618657], [-79.4318104838685, 43.7060823742306]]}"
307	21606	TS2023-11-436	2025-09-05	Local Road Reconstruction	BALDWIN ST&lt;br&gt; From: [98 m W] SPADINA AVE&lt;br&gt; To: KENSINGTON AVE (TO) 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4002782277325, 43.6548582970667], [-79.4007089226048, 43.6547691715106]]}"
308	21652	 	2021-07-12	Local Road Rehabilitation	CARLING AVE&lt;br&gt; From: IRENE AVE&lt;br&gt; To: LEEDS ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2024 - Q2 2025 (Carry-Over)	Active	None	Transportation Services	Dennis Coronel, Engineering and Construction Services	dcorone@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4248969649302, 43.6628446316204], [-79.4252099904837, 43.6636456591171], [-79.4254609709207, 43.6643217516281]]}"
309	21674	 	2025-04-12	Local Road Reconstruction	JIMMY WISDOM WAY&lt;br&gt; From: WHITMORE AVE&lt;br&gt; To: HOPEWELL AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4482622786283, 43.6985974849065], [-79.4485519869181, 43.6993205079126]]}"
310	21685	 	2023-02-13	Laneway Reconstruction	[33.50 m W] YONGE ST&lt;br&gt; From: WELLINGTON ST W&lt;br&gt; To: MELINDA ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3778722643263, 43.6477124723191], [-79.3781701427466, 43.6484220499392]]}"
311	21705	 	2025-04-12	Laneway Reconstruction	[35.30 m W] BATHURST ST&lt;br&gt; From: OLIVE AVE (TO)&lt;br&gt; To: [34.10 m N] OLIVE AVE (TO) 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4138092306099, 43.6702085230858], [-79.413930599998, 43.6705343159295]]}"
312	21736	 	2025-10-14	Local Road Rehabilitation	CARLTON ST&lt;br&gt; From: SACKVILLE ST&lt;br&gt; To: WOODSTOCK PL 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3650544654706, 43.6651339478541], [-79.3645021590854, 43.6652537495124]]}"
313	21752	 	2025-10-14	Local Road Reconstruction	ST LEONARDS AVE&lt;br&gt; From: CITY LIMIT&lt;br&gt; To: [155 m W] MILDENHALL RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Rachele Joseph, Engineering and Construction Services	rgjoseph@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3892506899957, 43.7236794705968], [-79.3887718742843, 43.7237594020805], [-79.3868376928893, 43.7241643255961]]}"
314	21756	 	2023-10-11	Laneway Reconstruction	[42.70 m N] SULLIVAN ST&lt;br&gt; From: GRANGE PL&lt;br&gt; To: HURON ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3939210771515, 43.6521174434477], [-79.3955234764178, 43.6517727809425]]}"
315	21782	TS2023-08-235	2024-12-19	Local Road Rehabilitation	ORCHARD VIEW BLVD&lt;br&gt; From: [28.70 m E] ORIOLE PKWY [END]&lt;br&gt; To: ORIOLE PKWY 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2027 - Q4 2028	Active	None	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4066656579704, 43.7071719025079], [-79.40711993841, 43.7070861600804]]}"
316	21832	 	2026-03-19	Local Road Reconstruction	RIDELLE AVE&lt;br&gt; From: MANITOU BLVD&lt;br&gt; To: LAWNHURST BLVD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4285835861986, 43.7067692737433], [-79.4306603358075, 43.7063224618657]]}"
317	21845	 	2025-04-11	Laneway Reconstruction	CHESTNUT LANE&lt;br&gt; From: [42 m S] CHESTNUT HILLS CRES&lt;br&gt; To: [66 m S] CHESTNUT HILLS CRES 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Angela Au, Engineering and Construction Services	aau2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5260269023073, 43.6527792097134], [-79.52633760125, 43.6529222394311]]}"
318	21876	 	2023-12-08	Laneway Reconstruction	[36.60 m N] DUNDAS ST W&lt;br&gt; From: BEATRICE ST&lt;br&gt; To: MONTROSE AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2025 - Q2 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4150964902151, 43.6509001329198], [-79.4155810547327, 43.6508007945212], [-79.4161380940756, 43.6506865902031]]}"
319	21927	 	2024-08-30	Local Road Reconstruction	DONALD AVE&lt;br&gt; From: SILVERTHORN AVE&lt;br&gt; To: KANE AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Matthew McAinsh, Engineering and Construction Services	mmcains@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4665492412748, 43.6862895180226], [-79.4678915091002, 43.6859965090083], [-79.4681531294418, 43.6859634177877]]}"
320	21986	 	2025-03-13	Laneway Reconstruction	[37 m S] EGLINTON AVE W&lt;br&gt; From: SCOTT RD&lt;br&gt; To: KEELE ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Matthew McAinsh, Engineering and Construction Services	mmcains@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4725949854874, 43.6903503685633], [-79.4730714030187, 43.690232095816], [-79.4730302442544, 43.6900932023795], [-79.4742979990668, 43.6898074367883]]}"
321	22035	TS2023-13-001 	2024-04-25	Major Road Reconstruction	GERRARD ST E&lt;br&gt; From: BERKELEY ST&lt;br&gt; To: [N] GERRARD ST E [BRANCH] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2027 - Q1 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marilia Cimini, Engineering and Construction Services	mcimini@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3685391029701, 43.6620435108171], [-79.3681759581657, 43.6621129619358]]}"
322	22047	 	2025-10-31	Laneway Reconstruction	[79 m N] O&apos;CONNOR DR&lt;br&gt; From: HOPEDALE AVE&lt;br&gt; To: [35 m W] HOPEDALE AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3525191549885, 43.6936711609227], [-79.3531025231468, 43.6935649128476]]}"
323	22107	TS2023-19-335	2025-07-18	Local Road Rehabilitation	HAZEL AVE&lt;br&gt; From: BALSAM AVE&lt;br&gt; To: FERNWOOD PARK AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q4 2026	Active	None	Transportation Services	Tony Rodrigues, Engineering and Construction Services	trodrig@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2896188758716, 43.6714184253583], [-79.2891267694922, 43.6715303358226], [-79.2890593131808, 43.6715463786438], [-79.2889869514439, 43.6715467311621], [-79.2889265159845, 43.6715480507959], [-79.2888219319829, 43.671542321821], [-79.2887122376462, 43.6715401118242], [-79.2886268209277, 43.6715289632942], [-79.2885766161282, 43.6715232437212], [-79.2884618650676, 43.6714813993987]]}"
324	22116	 	2024-10-03	Local Road Rehabilitation	MONOGRAM PL&lt;br&gt; From: [389 m W] ISLINGTON AVE&lt;br&gt; To: [504 m W] ISLINGTON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q4 2026	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5549610701561, 43.703837696326], [-79.5555025161576, 43.7037098704109]]}"
