{"help": "https://ckan0.cf.opendata.inter.prod-toronto.ca/en_AU/api/3/action/help_show?name=datastore_search", "success": true, "result": {"include_total": true, "limit": 100, "records_format": "objects", "resource_id": "86410703-6caa-4bed-b8ae-e42622e0fc62", "total_estimation_threshold": null, "records": [{"_id":1,"OBJECTID":12,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-07-04","PROJECT":"Local Road Resurfacing","LOCATION":"BELPER CRT&lt;br&gt; From: [60 m S] ELVASTON DR [CUL-DE-SAC]&lt;br&gt; To: ELVASTON DR ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Bill Dakogiannis, Engineering and Construction Services","CONTACT_EMAIL":"bdakogi@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3064556248949, 43.7299998197685], [-79.30624840894, 43.7295358961834]]}"},{"_id":2,"OBJECTID":14,"PROJ_NUM":"TS2023-12-115","LAST_UPDATED_DATE":"2025-09-04","PROJECT":"Local Road Resurfacing","LOCATION":"[E-W] BOULTON DRIVE [LEG]&lt;br&gt; From: RUSSELL HILL RD&lt;br&gt; To: BOULTON DR ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Rick Shrestha, Engineering and Construction Services","CONTACT_EMAIL":"rshrest@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4036319112362, 43.6807651226378], [-79.4035335598193, 43.680771106566], [-79.4034298762077, 43.6807687146842], [-79.4033670433686, 43.6807688596142], [-79.4032873375215, 43.6807645165829], [-79.4032031473365, 43.6807876327037], [-79.4031521532706, 43.6808222805698], [-79.4031045883202, 43.6808609098997], [-79.4030531246114, 43.6808944501616]]}"},{"_id":3,"OBJECTID":15,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-08-14","PROJECT":"Local Road Resurfacing","LOCATION":"HIGHVIEW CRES&lt;br&gt; From: OAKWOOD AVE&lt;br&gt; To: ROSEMOUNT AVE (TO) ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.434514215464, 43.6761762686499], [-79.4346378908303, 43.6761839815543], [-79.434700016397, 43.6762025687812], [-79.4347536844891, 43.6762206380722], [-79.4358322386699, 43.6767085800545], [-79.4358781341359, 43.6767474825069], [-79.4359296869535, 43.6768078292541], [-79.4359704644798, 43.6768896740939], [-79.4360128833723, 43.676967577259], [-79.4363657125302, 43.6778674109735]]}"},{"_id":4,"OBJECTID":16,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-08-14","PROJECT":"Local Road Resurfacing","LOCATION":"STEPHENSON AVE&lt;br&gt; From: WESTLAKE AVE&lt;br&gt; To: MAIN ST ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2025 - Q4 2025","STATUS":"Completed","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3045674432659, 43.686408005359], [-79.3028721155684, 43.6867840851033], [-79.3021918616995, 43.686936247131], [-79.3017318029913, 43.6870391630748], [-79.3016589763317, 43.6870548970259], [-79.3015933657009, 43.6870828672221]]}"},{"_id":5,"OBJECTID":37,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-07-08","PROJECT":"Local Road Resurfacing","LOCATION":"ARES CRT&lt;br&gt; From: CELESTE DR&lt;br&gt; To: [31 m E] CELESTE DR [CUL-DE-SAC W/ BULB] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Bill Dakogiannis, Engineering and Construction Services","CONTACT_EMAIL":"bdakogi@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2006154950765, 43.761075452115], [-79.2002670970193, 43.7610475534572]]}"},{"_id":6,"OBJECTID":38,"PROJ_NUM":"None","LAST_UPDATED_DATE":"2025-07-08","PROJECT":"Local Road Resurfacing","LOCATION":"BIRDSILVER GDNS&lt;br&gt; From: FRIENDSHIP AVE&lt;br&gt; To: [380 m N] FRIENDSHIP AVE [CUL-DE-SAC] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Bill Dakogiannis, Engineering and Construction Services","CONTACT_EMAIL":"bdakogi@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.1305891472991, 43.7908634925526], [-79.1302261691294, 43.7911683572013], [-79.1301637093379, 43.7912221618856], [-79.1301370278964, 43.7912670811951], [-79.1301063586687, 43.7913299898522], [-79.1301052552134, 43.791383993062], [-79.1301127435241, 43.7914290229477], [-79.1301279422206, 43.7914830789155], [-79.130156349231, 43.7915371686224], [-79.1301753816529, 43.7916002381185], [-79.1302006144168, 43.7916633276728], [-79.1302342973912, 43.7917444468193], [-79.130355994052, 43.7920328766204], [-79.1304623816766, 43.7922852612659], [-79.1305672295219, 43.7925376228221], [-79.1306951546445, 43.7928260723556], [-79.1308154008604, 43.7930964946724], [-79.1308980559382, 43.7932947864386], [-79.1310135029537, 43.7935922054075], [-79.1310439031248, 43.7937003080686], [-79.1310780694854, 43.7938264341306], [-79.1311106827466, 43.7939525551668], [-79.1312864643452, 43.7939867686031]]}"},{"_id":7,"OBJECTID":49,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-07-08","PROJECT":"Local Road Resurfacing","LOCATION":"JENNINGS AVE&lt;br&gt; From: CLENDENAN AVE&lt;br&gt; To: [120 m W] CLENDENAN AVE [END] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4718421229594, 43.6612716789463], [-79.47268524193, 43.6610775895008], [-79.473280901539, 43.6609404507748], [-79.473363571156, 43.660923862587]]}"},{"_id":8,"OBJECTID":50,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-08-28","PROJECT":"Local Road Resurfacing","LOCATION":"FOURTH ST (ETBK)&lt;br&gt; From: FOURTH ST [END]&lt;br&gt; To: [20 m S] LAKE SHORE DR [END] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Michael Popik, Engineering and Construction Services","CONTACT_EMAIL":"mpopik@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4999967178164, 43.5970597451326], [-79.5002375079974, 43.5975074317654]]}"},{"_id":9,"OBJECTID":73,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Resurfacing","LOCATION":"BREADALBANE ST&lt;br&gt; From: YONGE ST&lt;br&gt; To: BAY ST ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3841576648649, 43.6639039545171], [-79.3847586515241, 43.6637789842819], [-79.3859253027772, 43.6635363891804], [-79.3867791268369, 43.6633588314806]]}"},{"_id":10,"OBJECTID":90,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-07-08","PROJECT":"Local Road Resurfacing","LOCATION":"OAKVALE AVE&lt;br&gt; From: LYDIA CRT&lt;br&gt; To: [27 m E] LYDIA CRT [END] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3353718698324, 43.6788329884276], [-79.3350877000253, 43.6788985494507], [-79.3350630160327, 43.6789042386731]]}"},{"_id":11,"OBJECTID":151,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-11-05","PROJECT":"Local Road Resurfacing","LOCATION":"SWANWICK AVE (TO)&lt;br&gt; From: MALVERN AVE&lt;br&gt; To: HANNAFORD ST ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Bill Dakogiannis, Engineering and Construction Services","CONTACT_EMAIL":"bdakogi@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2939494267293, 43.6833895391303], [-79.2926998398399, 43.6836596593544]]}"},{"_id":12,"OBJECTID":160,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-11-05","PROJECT":"Local Road Resurfacing","LOCATION":"FINCHGATE CRT&lt;br&gt; From: HEATHVIEW AVE&lt;br&gt; To: [40 m W] HEATHVIEW AVE [CUL-DE-SAC] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Jennifer Harris, Engineering and Construction Services","CONTACT_EMAIL":"Jennifer.Harris@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3855412132363, 43.783674790335], [-79.3859085958929, 43.7835946963807]]}"},{"_id":13,"OBJECTID":164,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-07-18","PROJECT":"Local Road Resurfacing","LOCATION":"CHAPLIN CRES&lt;br&gt; From: EGLINTON AVE W&lt;br&gt; To: SPADINA RD (TO) ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2027 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"2 - Backup projects in the Capital Works Program in the event that a priority 1 project must be cancelled or deferred. All outstanding priority 2 projects are carried forward into the next capital program.","OWNER":"Transportation Services","CONTACT_NAME":"Amran Durrani, Engineering and Construction Services","CONTACT_EMAIL":"adurran2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4173792342862, 43.7027195136785], [-79.4177973444693, 43.7029043413228], [-79.4183614754595, 43.7031747839506], [-79.4186040065538, 43.7033099760706]]}"},{"_id":14,"OBJECTID":181,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-11-06","PROJECT":"Local Road Resurfacing","LOCATION":"GOLDERS GREEN AVE&lt;br&gt; From: WINTER GARDENS TRL&lt;br&gt; To: EAST AVE (SC) ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2024 - Q4 2025","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Jennifer Harris, Engineering and Construction Services","CONTACT_EMAIL":"Jennifer.Harris@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.1374201299445, 43.7834956320335], [-79.1364169654777, 43.7837354850432], [-79.1355632622491, 43.783912797918], [-79.1354753608325, 43.7839395300247], [-79.1353882297273, 43.783966246519], [-79.1352629347138, 43.7840108524464], [-79.1351989886666, 43.7840556540685], [-79.1350915041372, 43.7841093177958], [-79.1349739735474, 43.7841539481951], [-79.1348487874119, 43.7841805517312], [-79.134697928238, 43.7842160742178], [-79.1345510548172, 43.7842336069664], [-79.1343893668307, 43.784260093278], [-79.1342867472579, 43.7842777672429], [-79.1342300144022, 43.7842865868353], [-79.1332039144024, 43.7844633302105]]}"},{"_id":15,"OBJECTID":200,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-19","PROJECT":"Local Road Resurfacing","LOCATION":"LESLIE ST (TO)&lt;br&gt; From: RAILWAY LANDS - CNR&lt;br&gt; To: COMMISSIONERS ST ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adrian Viegas, Engineering and Construction Services","CONTACT_EMAIL":"aviegas@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3241049925959, 43.6538505747314], [-79.3263363104009, 43.6565146418107]]}"},{"_id":16,"OBJECTID":213,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-07-18","PROJECT":"Local Road Resurfacing","LOCATION":"COLBORNE ST&lt;br&gt; From: SCOTT ST&lt;br&gt; To: LEADER LANE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3763520394708, 43.648767810626], [-79.3754504279513, 43.6489765546027]]}"},{"_id":17,"OBJECTID":237,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Resurfacing","LOCATION":"CRESCENT RD&lt;br&gt; From: [N] CLUNY DR [BRANCH]&lt;br&gt; To: ROSEDALE RD ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Nicholas Mah, Engineering and Construction Services","CONTACT_EMAIL":"nmah@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3864131481886, 43.6775440044107], [-79.3863558099742, 43.6775259447861], [-79.3862686238194, 43.6775123560986], [-79.3861574109295, 43.67749424276], [-79.3860636726859, 43.6774761377306], [-79.385956295284, 43.6774760306544], [-79.3858000520118, 43.6775028696207], [-79.385652319453, 43.6775477285235], [-79.3855309544746, 43.6775791026646], [-79.3854382459514, 43.6776195157184], [-79.3853490604155, 43.6776464302542], [-79.3852629753356, 43.6776733478324], [-79.3851427757039, 43.6777047227304], [-79.3850346108044, 43.6777271172901], [-79.3849590148834, 43.6777360425534], [-79.3848900169049, 43.6777449654096]]}"},{"_id":18,"OBJECTID":282,"PROJ_NUM":"TS2023-22-043","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Local Road Resurfacing","LOCATION":"ROSS AVE&lt;br&gt; From: AGINCOURT DR&lt;br&gt; To: DONALDA CRES ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2830727567353, 43.7861306132887], [-79.2811764021485, 43.7865681353132]]}"},{"_id":19,"OBJECTID":325,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-12","PROJECT":"Local Road Resurfacing","LOCATION":"GRENVIEW (S) BLVD&lt;br&gt; From: RIDGEGATE CRES&lt;br&gt; To: KENRIDGE AVE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5029770898364, 43.6370031120777], [-79.5032598789658, 43.6376872183908]]}"},{"_id":20,"OBJECTID":383,"PROJ_NUM":"TS2023-24_25-325","LAST_UPDATED_DATE":"2025-11-04","PROJECT":"Major Road Resurfacing","LOCATION":"ELLESMERE RD&lt;br&gt; From: MEADOWVALE RD&lt;br&gt; To: [600 m E] MEADOWVALE RD [BRANCH] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Shams Khan, Engineering and Construction Services","CONTACT_EMAIL":"skhan5@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.1635657067808, 43.7924871522047], [-79.1618403392248, 43.7928965802799], [-79.1592048275186, 43.7935180659222], [-79.1579291127792, 43.7938148114918], [-79.1577819787652, 43.7938489443563], [-79.1560820802199, 43.7942433207575], [-79.1556178138543, 43.7943510254197]]}"},{"_id":21,"OBJECTID":476,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-07-18","PROJECT":"Local Road Resurfacing","LOCATION":"HOUNSLOW HEATH RD&lt;br&gt; From: SPRING GROVE AVE&lt;br&gt; To: [N-S] HOUNSLOW HEATH RD [LEG] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4584575967532, 43.6731665166737], [-79.458703929799, 43.6731921426887], [-79.4593708297161, 43.6732499721449], [-79.4594419410844, 43.6732645795441], [-79.4595006028938, 43.6732772922107], [-79.4595621622354, 43.6732965408342], [-79.4595968635094, 43.6733112522682]]}"},{"_id":22,"OBJECTID":504,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-07-08","PROJECT":"Local Road Resurfacing","LOCATION":"LANEWOOD CRES&lt;br&gt; From: BEVERLY GLEN BLVD&lt;br&gt; To: BROOKSHIRE BLVD ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Bill Dakogiannis, Engineering and Construction Services","CONTACT_EMAIL":"bdakogi@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3279237604047, 43.8018682084731], [-79.3278812740055, 43.802057168015], [-79.3278420742391, 43.8021921257686], [-79.3278465930185, 43.8022371381727], [-79.3278348447296, 43.8022731249535], [-79.3278036716737, 43.8023090824681], [-79.3277188971161, 43.8023449771898], [-79.3276381025229, 43.8023538474896], [-79.3267131674, 43.8025684937053], [-79.3256226151355, 43.8028368865684]]}"},{"_id":23,"OBJECTID":513,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-12","PROJECT":"Local Road Resurfacing","LOCATION":"CENTRE DR&lt;br&gt; From: ROYAL YORK RD&lt;br&gt; To: [279 m N/E] ROYAL YORK RD [END] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5225440776616, 43.6728378840124], [-79.522851902858, 43.6736636764673], [-79.5207939465296, 43.6740851962969]]}"},{"_id":24,"OBJECTID":535,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-12-05","PROJECT":"Local Road Resurfacing","LOCATION":"N WOODROW BLVD&lt;br&gt; From: ZENITH DR&lt;br&gt; To: DUNLOP AVE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2027 - Q2 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Sarmad Al-Douri, Engineering and Construction Services","CONTACT_EMAIL":"saldour@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2653989499396, 43.7120938603427], [-79.2660119108606, 43.7135213212552]]}"},{"_id":25,"OBJECTID":602,"PROJ_NUM":"TS2023-24_25-325","LAST_UPDATED_DATE":"2025-11-04","PROJECT":"Major Road Resurfacing","LOCATION":"ELLESMERE RD&lt;br&gt; From: ELLESMERE RD [BRANCH]&lt;br&gt; To: KINGSTON RD ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Shams Khan, Engineering and Construction Services","CONTACT_EMAIL":"skhan5@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.1545965299292, 43.7935798323195], [-79.1547777174203, 43.7937175479363], [-79.154983977543, 43.793879750011], [-79.1553675344254, 43.7941632725914], [-79.1554723953232, 43.7942288559123], [-79.1556178138543, 43.7943510254197]]}"},{"_id":26,"OBJECTID":673,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-22","PROJECT":"Local Road Resurfacing","LOCATION":"ELMHURST DR&lt;br&gt; From: ISLINGTON AVE&lt;br&gt; To: REDWATER DR ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Mehrshad Rahimi, Engineering and Construction Services","CONTACT_EMAIL":"mrahimi@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5589221718512, 43.723112035891], [-79.5599384904232, 43.7228504713272]]}"},{"_id":27,"OBJECTID":693,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-08-28","PROJECT":"Local Road Resurfacing","LOCATION":"PRINCESS ST&lt;br&gt; From: 50m North of The Esplanade&lt;br&gt; To: FRONT ST E ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q4 2024 - Q3 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Amran Durrani, Engineering and Construction Services","CONTACT_EMAIL":"adurran2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3662976118133, 43.6497591549253], [-79.3665079581504, 43.6502499569073], [-79.3666927785397, 43.6506812387109]]}"},{"_id":28,"OBJECTID":698,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-07-11","PROJECT":"Local Road Resurfacing","LOCATION":"TERESA CRT&lt;br&gt; From: KAY DR&lt;br&gt; To: [79 m E] KAY DR [CUL-DE-SAC] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5923413978483, 43.757231258155], [-79.5922108176947, 43.757207834461], [-79.5920227792273, 43.7571697309428], [-79.5919481679478, 43.7571613028652], [-79.591390985014, 43.7571946941029], [-79.5912887012046, 43.7571754682854]]}"},{"_id":29,"OBJECTID":2071,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-11","PROJECT":"Major Road Resurfacing","LOCATION":"DANFORTH AVE&lt;br&gt; From: LUTTRELL AVE&lt;br&gt; To: [33.60 m E] LUTTRELL AVE [CITY LIMITS] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Nicholas Mah, Engineering and Construction Services","CONTACT_EMAIL":"nmah@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2937955640938, 43.6899650542206], [-79.2932788213424, 43.6900807236692]]}"},{"_id":30,"OBJECTID":2072,"PROJ_NUM":"None","LAST_UPDATED_DATE":"2026-03-11","PROJECT":"Local Road Resurfacing","LOCATION":"Bankview Circle&lt;br&gt; From: HONEYVIEW PL E&lt;br&gt; To: HONEYVIEW PL W ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.6199975062848, 43.7335512884052], [-79.6199874768747, 43.7335828032351], [-79.6199681260851, 43.7335963253902], [-79.6199483746183, 43.7336143485769], [-79.6199282169205, 43.7336278715719], [-79.6199073109586, 43.7336458959627], [-79.6198856139436, 43.733659420565], [-79.6198635320944, 43.7336729455666], [-79.6198410654108, 43.7336864709675], [-79.6198182014787, 43.7336999967803], [-79.619794567887, 43.7337135233952], [-79.6197705246146, 43.7337270414332], [-79.6197457365269, 43.7337405692477], [-79.6197209394623, 43.7337495964518], [-79.6196953568768, 43.7337631250874], [-79.6196693804926, 43.7337721535153], [-79.6196434165144, 43.7337811819243], [-79.6196166704643, 43.7337902111458], [-79.6195899119924, 43.7337992403741], [-79.6195623838619, 43.7338082704012], [-79.6195348557231, 43.7338173004216], [-79.6195069551464, 43.7338263218235], [-79.6194786483923, 43.7338308520303], [-79.6194503381658, 43.7338398828478], [-79.6194216465755, 43.7338444134425], [-79.6193913908512, 43.7338489456638], [-79.6193681454047, 43.7338579711706], [-79.6193441054724, 43.7338669975021], [-79.6193192834676, 43.7338760246449], [-79.6192948711086, 43.7338850513548], [-79.6192696677448, 43.7338895782707], [-79.6192444608936, 43.7338986057989], [-79.6192188726943, 43.733903133105], [-79.6191929085917, 43.7339121614116], [-79.6191669018049, 43.7339121885285], [-79.6191405315282, 43.7339167166324], [-79.6191145584874, 43.7339212443163], [-79.6190878033768, 43.7339257728092], [-79.6190614117579, 43.7339258003029], [-79.6190342718152, 43.7339303291841], [-79.6190075166766, 43.733934848657], [-79.618993936039, 43.733934862796], [-79.6189819071196, 43.7339348753181], [-79.6189694933741, 43.7339348882395], [-79.6189574768685, 43.7339349007462], [-79.6189454568569, 43.7339394138694], [-79.6189342189096, 43.7339439261776], [-79.6189117216909, 43.7339484501986], [-79.6188911823312, 43.7339574727929], [-79.6188814925846, 43.7339664840996], [-79.6188725973154, 43.7339754945793], [-79.6188559310324, 43.7339845131392], [-79.6188416074309, 43.733998029875], [-79.6188358031773, 43.7340070371379], [-79.6188303961625, 43.7340160439875], [-79.6188257587994, 43.7340250500367], [-79.6188222883289, 43.7340340548727], [-79.6188188178574, 43.7340430597085], [-79.6188168991061, 43.7340520629312], [-79.6188153651811, 43.7340610657539], [-79.6188146133234, 43.7340700677636], [-79.6188134518109, 43.734079070199], [-79.6187183268733, 43.7344257073097], [-79.618719511557, 43.7344347073068], [-79.6187218631431, 43.7344437060918], [-79.6187245995593, 43.7344527044771], [-79.6187284904648, 43.734461701663], [-79.6187327786148, 43.7344706984362], [-79.6187382301475, 43.7344841946144], [-79.6187440700332, 43.7344931897751], [-79.61875106441, 43.734502183736], [-79.6187584560324, 43.7345111772838], [-79.618775564196, 43.7345246613483], [-79.618794993761, 43.7345381429976], [-79.618805864795, 43.7345426323123], [-79.6188171171452, 43.7345516218433], [-79.6188287826712, 43.73455611033], [-79.6188404233712, 43.7345605988412], [-79.6188528461471, 43.7345650865381], [-79.6188660385852, 43.7345695734332], [-79.6188788586089, 43.7345740607141], [-79.618892439391, 43.7345740465886], [-79.618905631834, 43.7345785334792], [-79.618919212617, 43.7345785193505], [-79.6189331782303, 43.7345785048198], [-79.6189467555076, 43.7345829913051], [-79.6190057516736, 43.7345919311232], [-79.6190647354432, 43.7346008709237], [-79.6191237157378, 43.734614311311], [-79.6191830967912, 43.7346232506363], [-79.6192428502788, 43.7346321895423], [-79.6193026072633, 43.7346366277997], [-79.6193623607819, 43.7346455666431], [-79.61942212675, 43.7346545144435], [-79.6194826499656, 43.7346634524198], [-79.6195427794155, 43.7346678901623], [-79.6196029247448, 43.7346678272429], [-79.6196630631875, 43.7346767745275], [-79.6197821800702, 43.7346856509878], [-79.6199012970058, 43.7346945363251], [-79.620020410533, 43.7347079131542], [-79.6201399247744, 43.7347167888243], [-79.6202590294099, 43.7347256738017], [-79.6203610503076, 43.7347210658039], [-79.6204622981531, 43.7347209681445], [-79.6205635583939, 43.7347208613812], [-79.6206651910694, 43.7347207631361], [-79.6207664513091, 43.734720656193], [-79.6208676957725, 43.7347250497904], [-79.6209693408498, 43.7347249422606], [-79.6210550531647, 43.7347158502887], [-79.6211411502845, 43.7347067578446], [-79.6212272722241, 43.7346976743106], [-79.6213137756218, 43.7346930819192], [-79.6214002699143, 43.7346839888584], [-79.6214867517665, 43.7346748957454], [-79.6215732675251, 43.7346703031444], [-79.6215860753579, 43.7346747901345], [-79.6215988831926, 43.7346792771232], [-79.6216124515832, 43.7346792626877], [-79.6216256566656, 43.7346837492508], [-79.6216392374711, 43.7346837347989], [-79.6216528058627, 43.7346837203586], [-79.6216667839129, 43.7346837054806], [-79.6216803523045, 43.7346836910371], [-79.6216939331099, 43.7346836765787], [-79.6217078987462, 43.7346836617089], [-79.6217210823069, 43.7346836476703], [-79.6217346664092, 43.73467913259], [-79.6217478408509, 43.7346746179444], [-79.6217606395788, 43.7346746043111], [-79.621773044356, 43.7346700904826], [-79.6217854491313, 43.7346655766526], [-79.6217970718295, 43.7346610636548], [-79.6218083129866, 43.7346520504487], [-79.6218195508498, 43.7346475378586], [-79.6218300066362, 43.734643026101], [-79.6218400932933, 43.7346340141223], [-79.6218578922589, 43.7346204933072], [-79.6218660299466, 43.7346114924052], [-79.6218737703694, 43.734602482925], [-79.6218807287154, 43.7345934742783], [-79.6218919515899, 43.7345754598561], [-79.6218965885355, 43.7345664536838], [-79.6219004434057, 43.7345574483455], [-79.6219035286148, 43.7345484438278], [-79.6219062289931, 43.7345394397204], [-79.6219073776371, 43.734530437268], [-79.621908132321, 43.7345169346221], [-79.6219081016291, 43.7345079244262], [-79.62190731371, 43.7344989240392], [-79.6219061285476, 43.7344899240759], [-79.621903382524, 43.7344764251634], [-79.6219002608014, 43.7344674272653], [-79.6216409482707, 43.7336215880813], [-79.6216401297708, 43.7336035864948], [-79.6216381567998, 43.7335855861368], [-79.6216357865927, 43.7335675862014], [-79.6216322619161, 43.7335495874944], [-79.6216275703576, 43.733531590029], [-79.6216224815649, 43.7335135929859], [-79.6216162383054, 43.733495597171], [-79.6216096102265, 43.7334776017651], [-79.6216018152689, 43.7334596076001], [-79.6215936354931, 43.733441613844], [-79.6215842979454, 43.7334281219333], [-79.6215741692382, 43.7334101302487], [-79.621563270892, 43.7333921393817], [-79.6215519877297, 43.7333741489228], [-79.6215395467955, 43.7333606603085], [-79.6215263147076, 43.7333426719194], [-79.6215127069054, 43.7333291845427], [-79.6214983170515, 43.7333156979956], [-79.621483160876, 43.7332977116465], [-79.6214676165705, 43.7332842263225], [-79.6214509178066, 43.733270742223], [-79.6214338094011, 43.7332572585563], [-79.6214159437556, 43.7332437666901], [-79.6213957443796, 43.7332302863009], [-79.6213751568671, 43.7332213069349], [-79.621354187865, 43.7332078273556], [-79.6213324459023, 43.7331988492076], [-79.6213107039462, 43.7331898710555], [-79.6212881799404, 43.7331808937291], [-79.6212652744525, 43.7331674161881], [-79.6212423656408, 43.7331584392609], [-79.6212186962717, 43.7331539637504], [-79.6211950054165, 43.733144987643], [-79.6211709421609, 43.7331360119255], [-79.6211461059296, 43.7331315376369], [-79.6211216454522, 43.73312256233], [-79.6210964244092, 43.7331180884384], [-79.6210715881908, 43.7331136141336], [-79.6210459699209, 43.7331091406516], [-79.6210203764819, 43.7331046671376], [-79.6209947582196, 43.7331001936441], [-79.6209687517859, 43.7331002211705], [-79.6209427577657, 43.7331002486778], [-79.6209237344752, 43.7330912675753], [-79.6209043139562, 43.7330822868897], [-79.6208849024958, 43.7330778068061], [-79.6208647247594, 43.7330688269145], [-79.6208445312517, 43.733064347651], [-79.6208235805196, 43.7330598691843], [-79.6208030146111, 43.733055390307], [-79.6207816666512, 43.7330509122525], [-79.6207603311081, 43.7330464341808], [-79.6207389921964, 43.7330464567235], [-79.6207168746037, 43.7330419794698], [-79.6206955356936, 43.7330420020045], [-79.6206734147292, 43.7330420253608], [-79.6206517034122, 43.7330420482804], [-79.6206299672681, 43.7330420712221], [-79.6206078587171, 43.7330420945526], [-79.6205865288373, 43.7330466176722], [-79.6205702422449, 43.7330466348532], [-79.6205547343213, 43.7330511518254], [-79.6205388506018, 43.7330601698067], [-79.6205241032877, 43.7330601853579], [-79.6205093864364, 43.7330692021047], [-79.6204950544013, 43.7330782184439], [-79.6204814829807, 43.7330827333647], [-79.6204683178138, 43.7330917484706], [-79.6204555250502, 43.7331007631825], [-79.6204435143379, 43.7331097770688], [-79.6204322856774, 43.73311879013], [-79.6204210570134, 43.7331278031899], [-79.6204113800436, 43.7331368146142], [-79.6203931805586, 43.7331548362442], [-79.6203850642938, 43.733168346637], [-79.6203777052544, 43.7331818562318], [-79.6203715289021, 43.7331908639658], [-79.6203661187912, 43.7332043715073], [-79.6203610968992, 43.733213378025], [-79.6203572384837, 43.733226883932], [-79.6203537773017, 43.7332403894207], [-79.620338693565, 43.7332583987597], [-79.6203220457225, 43.7332764187444], [-79.6203054068795, 43.7332989393317], [-79.6202876045494, 43.7333169605264], [-79.6202694049728, 43.7333349821362], [-79.6202504233269, 43.7333530045659], [-79.6202310692608, 43.7333710273841], [-79.6202113179468, 43.7333890506167], [-79.6201903997392, 43.7334070750729], [-79.6201691001106, 43.7334205993116], [-79.6201474122335, 43.7334386245691], [-79.6201249332877, 43.7334521500392], [-79.6201016936799, 43.7334701769186], [-79.6200784574793, 43.7334837031751], [-79.6200544357671, 43.7335017218652], [-79.620030020246, 43.7335152493505], [-79.6200052198905, 43.7335287772346], [-79.6199975062848, 43.7335512884052]]}"},{"_id":31,"OBJECTID":2080,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-11","PROJECT":"Local Road Resurfacing","LOCATION":"BOLER ST&lt;br&gt; From: MARIA ST&lt;br&gt; To: [84.50 m N] BOLER ST [END] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4746267325872, 43.6663296168319], [-79.4749334213204, 43.6670955001119]]}"},{"_id":32,"OBJECTID":2173,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-11","PROJECT":"Local Road Resurfacing","LOCATION":"EXBURY RD&lt;br&gt; From: DEEVALE RD&lt;br&gt; To: CALVINGTON DR ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.494606351194, 43.7289696755049], [-79.4946112306289, 43.7290944598831], [-79.4946616737851, 43.7292606970902], [-79.4949545682867, 43.7299773077965], [-79.4953660601451, 43.7309121394517]]}"},{"_id":33,"OBJECTID":2181,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-13","PROJECT":"Local Road Resurfacing","LOCATION":"DENISON RD E&lt;br&gt; From: JANE ST&lt;br&gt; To: [190 m W] JANE ST ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q4 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Matthew McAinsh, Engineering and Construction Services","CONTACT_EMAIL":"mmcains@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5046287409232, 43.6970819543237], [-79.5023795727008, 43.6975937104383]]}"},{"_id":34,"OBJECTID":2191,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-05-15","PROJECT":"Local Road Resurfacing","LOCATION":"RADWAY AVE&lt;br&gt; From: BASKERVILLE CRES&lt;br&gt; To: STEVENHARRIS DR ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2027 - Q2 2029","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Shailaja Patel, Engineering and Construction Services","CONTACT_EMAIL":"spatelz@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.562677666178, 43.6329877781735], [-79.562726080564, 43.6329710900488], [-79.5628050799234, 43.6329654928181], [-79.5629324737724, 43.6329598599005], [-79.5630547853436, 43.6329412856474], [-79.5633117981758, 43.6328776297993]]}"},{"_id":35,"OBJECTID":2202,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-14","PROJECT":"Major Road Resurfacing","LOCATION":"YONGE ST&lt;br&gt; From: CRESCENT RD&lt;br&gt; To: ROXBOROUGH ST E ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Nicholas Mah, Engineering and Construction Services","CONTACT_EMAIL":"nmah@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3895318905153, 43.6769620472002], [-79.3895728256234, 43.6770385979586], [-79.3897032139863, 43.6773807649293], [-79.389901577034, 43.6778535163201]]}"},{"_id":36,"OBJECTID":2253,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-11","PROJECT":"Local Road Resurfacing","LOCATION":"SILVER BIRCH AVE&lt;br&gt; From: GLENFERN AVE&lt;br&gt; To: BALMY AVE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Bill Dakogiannis, Engineering and Construction Services","CONTACT_EMAIL":"bdakogi@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2844409698313, 43.6712066988024], [-79.2848358535719, 43.6721740229946]]}"},{"_id":37,"OBJECTID":2267,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-11","PROJECT":"Local Road Resurfacing","LOCATION":"GLENDORA AVE&lt;br&gt; From: DUDLEY AVE&lt;br&gt; To: BURNWELL ST ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2024 - Q4 2025","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Jennifer Harris, Engineering and Construction Services","CONTACT_EMAIL":"Jennifer.Harris@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4038966904873, 43.7604428417215], [-79.4012832489401, 43.7610298770636], [-79.4010024056933, 43.7611753993584]]}"},{"_id":38,"OBJECTID":2308,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-10","PROJECT":"Local Road Resurfacing","LOCATION":"GLENHURST AVE&lt;br&gt; From: ROSENEATH GDNS&lt;br&gt; To: ROBINA AVE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.434608786033, 43.6823029691068], [-79.4356115154702, 43.6820834292704]]}"},{"_id":39,"OBJECTID":2605,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-11","PROJECT":"Major Road Resurfacing","LOCATION":"GREENWOOD AVE&lt;br&gt; From: WALPOLE AVE&lt;br&gt; To: [S] RAILWAY LANDS - CNR [BRIDGE] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2028 - Q3 2029","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Tazeen Fatema, Engineering and Construction Services","CONTACT_EMAIL":"tfatema@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3293178626648, 43.6740845641402], [-79.3296412002196, 43.6748753714819]]}"},{"_id":40,"OBJECTID":2732,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-27","PROJECT":"Local Road Resurfacing","LOCATION":"AUSTIN TER&lt;br&gt; From: LYNDHURST CRT&lt;br&gt; To: WELLS HILL AVE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4120300662333, 43.6784182033741], [-79.4121476167684, 43.6784257828723], [-79.4130617490192, 43.6785585670821], [-79.4131613352873, 43.678570353491]]}"},{"_id":41,"OBJECTID":2778,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-11","PROJECT":"Local Road Resurfacing","LOCATION":"NEW TORONTO ST&lt;br&gt; From: ISLINGTON AVE&lt;br&gt; To: [104 m W] ISLINGTON AVE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5065697087673, 43.6067664999963], [-79.5070871375088, 43.6066534111256], [-79.5070979144145, 43.6066510520822], [-79.5075961410106, 43.6065421387599], [-79.5076735613341, 43.6065277763077], [-79.507793259273, 43.6065055526799]]}"},{"_id":42,"OBJECTID":2794,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-07-15","PROJECT":"Local Road Resurfacing","LOCATION":"NEVILLE PARK BLVD&lt;br&gt; From: [250 m S] QUEEN ST E&lt;br&gt; To: QUEEN ST E ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"&lt;Null&gt; Transportation Roads State of Good Repair","CONTACT_EMAIL":"RoadSOGR@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"MultiLineString\", \"coordinates\": [[[-79.2814978565579, 43.6715585266408], [-79.2821675684963, 43.6731868120204], [-79.2821675720777, 43.6731858218818]], [[-79.2821680680262, 43.6731858498308], [-79.2823901709103, 43.6737221665442]]]}"},{"_id":43,"OBJECTID":2795,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-27","PROJECT":"Local Road Resurfacing","LOCATION":"BELINDA SQ&lt;br&gt; From: WINTERMUTE BLVD&lt;br&gt; To: BELINDA SQ ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Bill Dakogiannis, Engineering and Construction Services","CONTACT_EMAIL":"bdakogi@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"MultiLineString\", \"coordinates\": [[[-79.3212297683937, 43.8173008823879], [-79.3210288145691, 43.8173237907036], [-79.3209800759812, 43.8173267837437], [-79.3209313476406, 43.8173305058678], [-79.3208826047644, 43.8173349300338], [-79.3208341088858, 43.8173398946319], [-79.3207857476133, 43.8173455705071], [-79.3207374838406, 43.8173518945935], [-79.3206893673441, 43.8173588489674], [-79.3206414727352, 43.8173664247448], [-79.3205938619517, 43.8173746940319], [-79.3205463488238, 43.8173835575249], [-79.3205035725625, 43.8173922034104], [-79.3204990697676, 43.8173931234512], [-79.3191271407914, 43.8177106883584], [-79.319118287151, 43.8177156969572], [-79.3191089497305, 43.8177203627479], [-79.3190992537373, 43.8177243888925], [-79.3190890366983, 43.8177280631689], [-79.3190785853704, 43.8177311069968], [-79.3190678745929, 43.8177336193484], [-79.3190569416862, 43.8177355912817], [-79.3190457372255, 43.8177369237062], [-79.3190345592575, 43.8177377161058], [-79.3190232340467, 43.8177378691935], [-79.3190119352477, 43.8177375092595], [-79.3190007500412, 43.8177365824353], [-79.3189895666841, 43.8177350435385], [-79.3189787458134, 43.8177328481348], [-79.3189680753942, 43.817730229917], [-79.318957643097, 43.8177269729977], [-79.3189475729605, 43.8177231675843], [-79.3189380262351, 43.8177189309467], [-79.3189288413989, 43.8177142358258], [-79.3189201554927, 43.8177089834268], [-79.3189119681086, 43.8177033087656], [-79.3189044157434, 43.8176972930685], [-79.3188974615663, 43.8176907832585], [-79.3188911545941, 43.817684013442], [-79.3188855696578, 43.8176769027277], [-79.3188806071458, 43.8176695049645], [-79.318876552618, 43.8176619376192], [-79.3188730707354, 43.8176541011485], [-79.3188704965644, 43.8176461851064], [-79.3188686439385, 43.817638090186], [-79.318867686647, 43.8176298976724], [-79.3188674625691, 43.8176217783296], [-79.318885706273, 43.8175659014412], [-79.3190605262366, 43.817030181115], [-79.3190575729878, 43.817020185223], [-79.3190556374436, 43.8170107310079], [-79.3190543980579, 43.8170012688938], [-79.3190540661285, 43.8169918082164], [-79.3190545794463, 43.8169823668794], [-79.3190558634796, 43.8169729267627], [-79.3190580050542, 43.8169635510112], [-79.3190608796705, 43.8169543024356], [-79.3190646488754, 43.8169451992938], [-79.3190690144358, 43.816936205109], [-79.3190742614739, 43.8169275813644], [-79.3190802662511, 43.816919138841], [-79.3190870160917, 43.8169109585285], [-79.3190943739841, 43.8169031302208], [-79.3191024516974, 43.8168956900991], [-79.3191111875117, 43.8168884940481], [-79.3191204065525, 43.8168818208246], [-79.3191302458853, 43.8168755626326], [-79.3191405811744, 43.8168697282761], [-79.3191515488062, 43.816864434985], [-79.3191627513461, 43.816859565116], [-79.3191744368955, 43.8168552900825], [-79.3191864814176, 43.8168515196771], [-79.3191987977336, 43.8168483077684], [-79.3192113610907, 43.8168456183128], [-79.3192241959706, 43.8168435773641], [-79.3192371162638, 43.8168420676138], [-79.3192501714497, 43.8168411701499], [-79.3192632124939, 43.8168408397312], [-79.3192762764994, 43.8168411394241], [-79.319289338632, 43.8168420601881], [-79.3204718039169, 43.8165731257839], [-79.320755881065, 43.8165085297458], [-79.3207710723232, 43.8165041250305], [-79.3207864981224, 43.8165002697478], [-79.3208021708129, 43.8164969909204], [-79.3208180779105, 43.8164943065307], [-79.3208341325885, 43.8164921534348], [-79.320850309582, 43.8164906666096], [-79.3208664477215, 43.8164897017848], [-79.3208827582775, 43.8164892772938], [-79.3208991664502, 43.8164894650279], [-79.3209154234628, 43.8164903186041], [-79.3209315920078, 43.8164916580985], [-79.3209476344703, 43.8164935914655], [-79.3209635383394, 43.8164961456888], [-79.3209793038845, 43.8164992307579], [-79.3209948316864, 43.8165028375161], [-79.3210099845495, 43.8165071187673], [-79.3210534418581, 43.8165240998797], [-79.3210963879694, 43.8165416022388], [-79.3211388472621, 43.8165597879034], [-79.321179937364, 43.8165785834843], [-79.3211904950947, 43.8165856028561], [-79.3212003055552, 43.816593098116], [-79.3212096050651, 43.8166010246283], [-79.3212181452498, 43.8166093009948], [-79.3212260751448, 43.8166179724542], [-79.3212332584135, 43.8166269037771], [-79.3212398193641, 43.8166360951579], [-79.3212456458772, 43.8166456274313], [-79.3212505770498, 43.8166552663172], [-79.3212549106845, 43.8166651923034], [-79.3212583488975, 43.8166752519055], [-79.3212609413312, 43.8166854722044], [-79.321262750542, 43.8166957182817], [-79.3212638508999, 43.8167060622624], [-79.3212639567903, 43.8167164046878], [-79.321263416196, 43.8167267731055], [-79.3212619060487, 43.8167371220046], [-79.3212297683937, 43.8173008823879]], [[-79.3222925491292, 43.8173503446765], [-79.3212351031056, 43.8173002786579], [-79.3212297683937, 43.8173008823879]]]}"},{"_id":44,"OBJECTID":2801,"PROJ_NUM":"None","LAST_UPDATED_DATE":"2026-08-14","PROJECT":"Local Road Resurfacing","LOCATION":"HOVE ST&lt;br&gt; From: SEARLE AVE&lt;br&gt; To: BRIGHTON AVE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2021 - Q1 2025","STATUS":"Completed","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Melissa Ho, Engineering and Construction Services","CONTACT_EMAIL":"mho@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4433850522605, 43.7597590382561], [-79.4436998914778, 43.7605379405164]]}"},{"_id":45,"OBJECTID":2809,"PROJ_NUM":"TS2023-11-441","LAST_UPDATED_DATE":"2026-04-02","PROJECT":"Local Road Resurfacing","LOCATION":"BARTON AVE&lt;br&gt; From: PENDRITH LANE&lt;br&gt; To: CRAWFORD ST ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4220171501831, 43.6659071551087], [-79.4220559918357, 43.665893202524], [-79.4223318263368, 43.6658241339861], [-79.4232668000949, 43.6656219653021]]}"},{"_id":46,"OBJECTID":2845,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-27","PROJECT":"Local Road Resurfacing","LOCATION":"DOWLING AVE&lt;br&gt; From: KING ST W&lt;br&gt; To: LEOPOLD ST ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4385961715737, 43.6366625200593], [-79.4391655007971, 43.638211935203]]}"},{"_id":47,"OBJECTID":2886,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-27","PROJECT":"Local Road Resurfacing","LOCATION":"DOWLING AVE&lt;br&gt; From: LEOPOLD ST&lt;br&gt; To: LAXTON AVE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4391655007971, 43.638211935203], [-79.4395027488599, 43.6391077154374]]}"},{"_id":48,"OBJECTID":2918,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"HENDRICK AVE&lt;br&gt; From: BENSON AVE&lt;br&gt; To: ST CLAIR AVE W ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Arthur Sinclair","CONTACT_EMAIL":"Arthur.Sinclair@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4305987387347, 43.6788763702373], [-79.4312931025535, 43.6805264966383]]}"},{"_id":49,"OBJECTID":2927,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-07-14","PROJECT":"Local Road Resurfacing","LOCATION":"DEWBOURNE AVE&lt;br&gt; From: ROSTREVOR RD&lt;br&gt; To: CAMBERWELL RD ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2027 - 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"&lt;Null&gt; Transportation Roads State of Good Repair","CONTACT_EMAIL":"RoadSOGR@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4279500669363, 43.698109637986], [-79.4290044859024, 43.6978670649995]]}"},{"_id":50,"OBJECTID":2942,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-07-15","PROJECT":"Local Road Resurfacing","LOCATION":"[E-W] FURNIVAL RD [LEG]&lt;br&gt; From: [N] FURNIVAL RD [LEG]&lt;br&gt; To: [N] FURNIVAL RD [LEG] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2025 - 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"&lt;Null&gt; Transportation Roads State of Good Repair","CONTACT_EMAIL":"RoadSOGR@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.303458546386, 43.7106959843518], [-79.3030479318186, 43.7107988191153]]}"},{"_id":51,"OBJECTID":2947,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-07-15","PROJECT":"Local Road Resurfacing","LOCATION":"[N] FURNIVAL RD [LEG]&lt;br&gt; From: [E-W] FURNIVAL RD [LEG]&lt;br&gt; To: [E-W] FURNIVAL RD [LEG] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2025 - 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"&lt;Null&gt; Transportation Roads State of Good Repair","CONTACT_EMAIL":"RoadSOGR@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.303458546386, 43.7106959843518], [-79.3034448533535, 43.7107319748615], [-79.3034462426792, 43.7107814841992], [-79.3034596268457, 43.7108400154247], [-79.3034738392166, 43.7108805455457], [-79.3034853487521, 43.7109165703863], [-79.3034859834646, 43.7109615777929], [-79.3034805019284, 43.710979570895], [-79.303465701257, 43.7109975479739], [-79.3034318877381, 43.7110199929877], [-79.3033930361509, 43.711042429326], [-79.3033418197048, 43.7110513424838], [-79.3032960406565, 43.7110557733458], [-79.3032599778597, 43.711060211912], [-79.3032293548206, 43.7110556585684], [-79.3031813017852, 43.7110420829439], [-79.303151546616, 43.7110150189152], [-79.303129507466, 43.7109924868024], [-79.3031106567059, 43.7109474390172], [-79.3030944940345, 43.7109114061235], [-79.3030752314746, 43.7108708672553], [-79.3030479318186, 43.7107988191153]]}"},{"_id":52,"OBJECTID":2959,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"ROSSANDER CRT&lt;br&gt; From: PERIVALE CRES&lt;br&gt; To: PERIVALE CRES ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Julfiker Hassan","CONTACT_EMAIL":"Julfiker.Hassan@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2423010111066, 43.7509143785885], [-79.2421242470197, 43.7509529461018], [-79.2420354093172, 43.7509771118774], [-79.2419929614633, 43.7509899687909], [-79.2418967420501, 43.7510241361289], [-79.2417810723971, 43.7510709331325], [-79.2416597480604, 43.7511476732243], [-79.2416327037951, 43.7511619510028], [-79.2415235060162, 43.7512600061924], [-79.2415199142884, 43.7512751560867], [-79.2414229158658, 43.7514064531845], [-79.2413461705309, 43.7514914488664], [-79.2413056701636, 43.7515565528792], [-79.2412787211363, 43.7516581964074], [-79.2412808565398, 43.7517822377348], [-79.2412892183695, 43.7518618182402], [-79.2413077380851, 43.7519499638705], [-79.2413490206585, 43.7520175752738], [-79.2413846945334, 43.7520756237017], [-79.241410840373, 43.7521345686839], [-79.2413903865732, 43.7521725524612], [-79.2413325442176, 43.7521959597006], [-79.2412572790058, 43.7522051865916], [-79.2400240464882, 43.7524970243381], [-79.2399578892028, 43.7525162444137], [-79.2398675670135, 43.752552709754], [-79.2398415239977, 43.7525677994912], [-79.2397872173086, 43.7525774241629], [-79.2397507868029, 43.7525710493828], [-79.239722890611, 43.7525495630159], [-79.2396916149565, 43.752494134438], [-79.2396534013804, 43.7523863480946], [-79.239604997085, 43.7521945933656], [-79.2395961808358, 43.7521773629929], [-79.2395713902624, 43.752058283692], [-79.2396111705724, 43.7519478306316], [-79.239674963017, 43.7518237684313], [-79.2397578440402, 43.7517218835998], [-79.2400200147491, 43.75137736533], [-79.2403780041224, 43.7509185508831], [-79.2405328587063, 43.7507003984331], [-79.2408185171753, 43.7503291890226], [-79.2408931952204, 43.750219516704], [-79.2409734019999, 43.7501349702104], [-79.2410789023984, 43.7500676552488], [-79.2411790839782, 43.7499955215044], [-79.2412909622331, 43.7499435588318], [-79.2413938150744, 43.7499055544923], [-79.241497249851, 43.7498650220389], [-79.2415386354158, 43.7498535940954], [-79.2418265752849, 43.7497812001117]]}"},{"_id":53,"OBJECTID":2972,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"MANORWOOD RD&lt;br&gt; From: MELDAZY DR&lt;br&gt; To: BRIMORTON DR ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Julfiker Hassan","CONTACT_EMAIL":"Julfiker.Hassan@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2510613351308, 43.7629418483269], [-79.2511615721924, 43.7632931125921], [-79.2512017124765, 43.7633472070498], [-79.2512318798949, 43.7633742762506], [-79.2512659223014, 43.7634013538762], [-79.2513131545153, 43.763428460191], [-79.2513751414441, 43.7634555985826], [-79.2514348059332, 43.7634827318897], [-79.2515300903473, 43.7635279539644], [-79.2515688028495, 43.7635550326503], [-79.2515973683636, 43.7635911084515], [-79.251613489371, 43.7636361403779], [-79.2516234377033, 43.7636721667108], [-79.2516216990247, 43.7637171688243], [-79.2516130052259, 43.7637531546445], [-79.2516058763149, 43.7637891438647], [-79.2515676108914, 43.7638430677668], [-79.2515340525537, 43.763887991709], [-79.2514950542312, 43.7639329128146], [-79.2514444805512, 43.7639598063787], [-79.2513961920663, 43.7639957060686], [-79.251316096219, 43.7640315365362], [-79.2512453525243, 43.7640583771229], [-79.2511745590011, 43.7640942277362], [-79.2510174592406, 43.7641658950385], [-79.2509109332807, 43.7642106688199], [-79.2507701901659, 43.7642643690714], [-79.2506651664094, 43.7643271482533], [-79.250592012298, 43.7643719945315], [-79.2505460205208, 43.7644169000484], [-79.2505380336238, 43.7644708896794], [-79.2505362941057, 43.764515891768], [-79.2505430994977, 43.7645609215076], [-79.2505677151074, 43.7646149732902], [-79.2505908031993, 43.7646600295582], [-79.2506131087316, 43.7647140852904], [-79.2506300366928, 43.7647501269318], [-79.2506469272859, 43.7647951696655], [-79.2506584277319, 43.7648311994611], [-79.2506652582531, 43.7648672190681], [-79.2506635562035, 43.7649032200609], [-79.2506688341903, 43.7649392452815], [-79.2506725721694, 43.7649752491398], [-79.2506689811062, 43.7650922655982]]}"},{"_id":54,"OBJECTID":2974,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-18","PROJECT":"Local Road Resurfacing","LOCATION":"KITTIWAKE AVE&lt;br&gt; From: KISKADEE DR&lt;br&gt; To: KISKADEE DR ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5950914732284, 43.7345660004269], [-79.5951160936382, 43.7346153606763], [-79.5951407414814, 43.734666341118], [-79.5951654265512, 43.7347172855181], [-79.5951901116914, 43.7347682479147], [-79.5952148092875, 43.7348192102953], [-79.5952394572698, 43.7348701727113], [-79.595264030853, 43.7349211621873], [-79.5952884927808, 43.734972169753], [-79.5953128306674, 43.7350232134214], [-79.5953370072565, 43.7350742842224], [-79.595360420075, 43.735129046158], [-79.5953747754063, 43.7351789549839], [-79.5953769863911, 43.735234517711], [-79.5954239325316, 43.7352712395371], [-79.5954985766416, 43.7352702590712], [-79.5955709500604, 43.7352543474203], [-79.5956419698107, 43.7352381218133], [-79.5957129646372, 43.7352218601781], [-79.5957839593823, 43.7352055714952], [-79.5958549416316, 43.7351892557749], [-79.5959259238136, 43.7351729220081], [-79.5959968810715, 43.7351565522132], [-79.5960678506326, 43.7351401373578], [-79.5961388077409, 43.7351237224686], [-79.5962097275252, 43.7351072805632], [-79.5962806720697, 43.7350908205904], [-79.5963516041469, 43.7350743515828], [-79.5964225361562, 43.7350578645287], [-79.5964934556692, 43.7350413504374], [-79.5965643627147, 43.7350248273114], [-79.5966352821352, 43.7350083041309], [-79.5967061766306, 43.7349917449225], [-79.5967770835154, 43.7349751946609], [-79.5968479903321, 43.7349586263528], [-79.5969188971241, 43.734942067002], [-79.5969897914339, 43.7349254896152], [-79.5970606981476, 43.7349089301763], [-79.5971315923645, 43.7348923437004], [-79.5972024865714, 43.7348757751829], [-79.5972733931385, 43.7348591976096], [-79.5973442872815, 43.7348426380054], [-79.5974151813855, 43.7348260783571], [-79.5974860754649, 43.7348095276661], [-79.5975569819046, 43.7347929679193], [-79.5976278883343, 43.7347764261309], [-79.5976988071534, 43.7347598932891], [-79.5977697259628, 43.7347433784058], [-79.597901325827, 43.7347127155979]]}"},{"_id":55,"OBJECTID":2985,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"FRANK CRES&lt;br&gt; From: HILLCREST DR&lt;br&gt; To: BRACONDALE HILL RD ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Arthur Sinclair","CONTACT_EMAIL":"Arthur.Sinclair@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4268914085036, 43.6756078948676], [-79.426852283858, 43.6757586959724], [-79.4268346367358, 43.6759215185704], [-79.4268436149588, 43.6760139588769], [-79.426865412891, 43.6761095488446], [-79.4271292504325, 43.6767648783993]]}"},{"_id":56,"OBJECTID":2986,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"GLENAYR RD&lt;br&gt; From: AVA RD&lt;br&gt; To: DEWBOURNE AVE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Arthur Sinclair","CONTACT_EMAIL":"Arthur.Sinclair@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4204342845713, 43.6978362802353], [-79.4206377906798, 43.6984155284074], [-79.4206759323894, 43.6985063688457], [-79.4207209372191, 43.6985861064448], [-79.4207761042713, 43.6986743662839], [-79.4208257802555, 43.6987495074203], [-79.4208770868251, 43.6988206890978], [-79.4209306351958, 43.6988854003787], [-79.4209839125447, 43.6989298405546], [-79.4210388215599, 43.6989978201904], [-79.4212435511671, 43.6994364859699]]}"},{"_id":57,"OBJECTID":2987,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"LYNDHURST AVE&lt;br&gt; From: AUSTIN TER&lt;br&gt; To: NINA ST ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Arthur Sinclair","CONTACT_EMAIL":"Arthur.Sinclair@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4120300662333, 43.6784182033741], [-79.4120416338371, 43.6784971898258], [-79.4128615775755, 43.6806479168336]]}"},{"_id":58,"OBJECTID":2988,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"DEWBOURNE AVE&lt;br&gt; From: GLENAYR RD&lt;br&gt; To: ROSEMARY RD ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Arthur Sinclair","CONTACT_EMAIL":"Arthur.Sinclair@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4212435511671, 43.6994364859699], [-79.4223042603734, 43.6992039616065]]}"},{"_id":59,"OBJECTID":2989,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"LAMBERTLODGE AVE&lt;br&gt; From: CHRISTIE ST&lt;br&gt; To: [E] MELITA CRES [BRANCH] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Arthur Sinclair","CONTACT_EMAIL":"Arthur.Sinclair@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4223833758975, 43.6738370540991], [-79.4234806118184, 43.6736326446733]]}"},{"_id":60,"OBJECTID":2997,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"LONSDALE RD&lt;br&gt; From: BAKER AVE&lt;br&gt; To: [E] ORIOLE PKWY [BRANCH] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Arthur Sinclair","CONTACT_EMAIL":"Arthur.Sinclair@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.397716248179, 43.6918229809213], [-79.400869285599, 43.69119755837]]}"},{"_id":61,"OBJECTID":3000,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"LASCELLES BLVD&lt;br&gt; From: ANDERSON AVE&lt;br&gt; To: EGLINTON AVE W ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Arthur Sinclair","CONTACT_EMAIL":"Arthur.Sinclair@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4029528449382, 43.7037369858869], [-79.4030583141486, 43.7038415982028], [-79.4037502206299, 43.7056026882376]]}"},{"_id":62,"OBJECTID":3004,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"HAZELRIDGE DR&lt;br&gt; From: SUNNYLEA AVE&lt;br&gt; To: IVY LEA CRES ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Frederik Meco","CONTACT_EMAIL":"Frederik.Meco@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4975690909063, 43.643191626084], [-79.497476535813, 43.6429215828916], [-79.4974749909599, 43.6428135663793]]}"},{"_id":63,"OBJECTID":3009,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"HEATHERDALE RD&lt;br&gt; From: CLOVERHILL RD&lt;br&gt; To: [149 m W] CLOVERHILL RD [CUL-DE-SAC] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Frederik Meco","CONTACT_EMAIL":"Frederik.Meco@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4901144565346, 43.6352701010564], [-79.4919167127756, 43.6348876838144]]}"},{"_id":64,"OBJECTID":3012,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"BURFORD RD&lt;br&gt; From: FERNALROY BLVD&lt;br&gt; To: LEAMINGTON AVE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Frederik Meco","CONTACT_EMAIL":"Frederik.Meco@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5125043888401, 43.638971924094], [-79.5121320446787, 43.6379372735695]]}"},{"_id":65,"OBJECTID":3013,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"BAYSHILL DR&lt;br&gt; From: NORSEMAN ST&lt;br&gt; To: [185 m S] NORSEMAN ST [RING] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Frederik Meco","CONTACT_EMAIL":"Frederik.Meco@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5098021232894, 43.6363381134914], [-79.5097197267095, 43.6362394563613], [-79.5095246281729, 43.6360179037196], [-79.5094255590059, 43.6359721939013], [-79.5093239247968, 43.6359282844827], [-79.5086305527534, 43.6356623120188], [-79.5084902537986, 43.6356320418669], [-79.5083986897284, 43.6356265847901], [-79.5082884624532, 43.6356314085759], [-79.5082106590477, 43.6356541696907], [-79.5081597403127, 43.6357003504393], [-79.5081315428786, 43.6357763241333], [-79.5081161307815, 43.6358170114858], [-79.5080783480005, 43.6358556120979], [-79.5080186506219, 43.6358737990971], [-79.5079492595799, 43.6358779175759], [-79.5078972552089, 43.6358706030549], [-79.5078382716141, 43.635850525026], [-79.5078073101509, 43.6358324253609], [-79.5077790493402, 43.6358053241193], [-79.5077562294694, 43.6357793656773], [-79.5077030522865, 43.635709995603]]}"},{"_id":66,"OBJECTID":3015,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"BYWORTH BLVD&lt;br&gt; From: [184.50 m E] EVERNBY BLVD [END]&lt;br&gt; To: EVERNBY BLVD ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Frederik Meco","CONTACT_EMAIL":"Frederik.Meco@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5598582264825, 43.6997851865345], [-79.5575696119005, 43.7003082294443]]}"},{"_id":67,"OBJECTID":3016,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"SMITH CRES&lt;br&gt; From: THE QUEENSWAY&lt;br&gt; To: COCHRANE DR ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Frederik Meco","CONTACT_EMAIL":"Frederik.Meco@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5060029029174, 43.6255803084494], [-79.5060195117276, 43.6256230372241], [-79.5060362569288, 43.6256663780842], [-79.506052952589, 43.6257097279455], [-79.5060696730552, 43.6257530688013], [-79.506086381154, 43.625796409655], [-79.5061031512325, 43.6258397324998], [-79.5061199709003, 43.6258830463378], [-79.506136877331, 43.6259263421654], [-79.5061538829165, 43.6259696199822], [-79.5061737136071, 43.6260110343538], [-79.5061959979257, 43.6260531687006], [-79.5062256675596, 43.6260944835135], [-79.506264927586, 43.6261288577141], [-79.5063164417949, 43.6261524655506], [-79.50636614722, 43.6261793499741], [-79.5064157163983, 43.6262063874072], [-79.5064652608368, 43.6262334158187], [-79.5065148548813, 43.6262603991988], [-79.50656458526, 43.6262872205242], [-79.5066143032657, 43.6263138077922], [-79.5066671437002, 43.6263376764338], [-79.506727740235, 43.6263517600736], [-79.5067865868635, 43.6263416930309], [-79.5068377363326, 43.6263144067416], [-79.5068909804372, 43.626291512986], [-79.5069462817952, 43.6262711304708], [-79.5069995876102, 43.6262467874354], [-79.5070545421872, 43.626228637236], [-79.5071140575116, 43.6262162386208], [-79.5071752461257, 43.6262076294588], [-79.5072369679619, 43.6262023687508], [-79.5072992106062, 43.626200186455], [-79.5073606358861, 43.626201973795], [-79.5074240564933, 43.6262060293252], [-79.5074854083169, 43.62621493671], [-79.5075419782504, 43.6262337909239], [-79.5075941498359, 43.6262576591814], [-79.5076429023559, 43.6262892148388], [-79.5076817537975, 43.6263189078513], [-79.5077267648625, 43.6263560535929], [-79.5077615406962, 43.6263946852427], [-79.5077922151353, 43.6264347843895], [-79.5078107211378, 43.6264757304912], [-79.5078266375371, 43.626518414037], [-79.5078356273109, 43.626563303398], [-79.5078397224166, 43.6266083911245], [-79.5078315003469, 43.6266545688641], [-79.5078165616647, 43.626698370693], [-79.5078070753935, 43.6267428562536], [-79.5077865850971, 43.626785938345], [-79.5077660820934, 43.6268267970879], [-79.5077494949705, 43.6268686367137], [-79.5077550520295, 43.6269119600676], [-79.5077924181139, 43.6269508975761], [-79.5078402909871, 43.6269786276111], [-79.5078895393304, 43.6270059164626], [-79.5079389611791, 43.6270330252526], [-79.5079885441496, 43.6270600169917], [-79.5080382262865, 43.6270869186883], [-79.5080879704229, 43.6271137933545], [-79.5081377269906, 43.6271406319925], [-79.5081874340404, 43.6271675066179], [-79.5082385663629, 43.6271956503159]]}"},{"_id":68,"OBJECTID":3026,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"CARSLAKE CRES&lt;br&gt; From: DANFORTH RD&lt;br&gt; To: DANFORTH RD ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Julfiker Hassan","CONTACT_EMAIL":"Julfiker.Hassan@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2445582132202, 43.7463678886986], [-79.2444012599941, 43.7463470690804], [-79.2440026742811, 43.7462880112631], [-79.2428643961836, 43.7461341909049], [-79.2428465680609, 43.7461309013606], [-79.2427701902184, 43.7461176327428], [-79.2427125871153, 43.7461098610684], [-79.2426412126178, 43.7460967026401], [-79.2425743618374, 43.7460825732243], [-79.2425016590048, 43.7460780708772], [-79.242437759788, 43.7460908346328], [-79.2423852652376, 43.7461310237284], [-79.2423620610357, 43.746162439642], [-79.242350390491, 43.7462056821309], [-79.2423659049114, 43.7462562858754], [-79.2423689785248, 43.7462662841416], [-79.2425509422721, 43.7466683549286], [-79.2426659251189, 43.7469449598476], [-79.2426868572544, 43.74697151552], [-79.2427077537331, 43.7469861085074], [-79.2427554113893, 43.7470056403767], [-79.2428074424261, 43.7470158298157], [-79.2428783509309, 43.747027888943], [-79.2435460614317, 43.747100057505], [-79.2442936942516, 43.7471703217162], [-79.2445889941187, 43.7472028642391]]}"},{"_id":69,"OBJECTID":3030,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"KENCLIFF CRES&lt;br&gt; From: MELDAZY DR&lt;br&gt; To: MELDAZY DR ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Julfiker Hassan","CONTACT_EMAIL":"Julfiker.Hassan@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2487048603591, 43.7617665201375], [-79.2489052995606, 43.7622890201453], [-79.2489421440562, 43.7623881140668], [-79.2489651796423, 43.7624511729255], [-79.2489875333268, 43.7624872267409], [-79.24902937407, 43.7625053209825], [-79.2490557656329, 43.76250537893], [-79.2491536448787, 43.7624875914278], [-79.2509846877678, 43.7621405853286], [-79.2510514798259, 43.7621317296472], [-79.2511019774671, 43.7621228474454], [-79.2511547602649, 43.7621229623762], [-79.2511998181887, 43.7621140592865], [-79.2512457206967, 43.7620871556554], [-79.2512753287831, 43.7620602255492], [-79.2512909774404, 43.7620332470578], [-79.2512833893023, 43.7619882246406], [-79.251267206816, 43.7619611948832], [-79.2512424798421, 43.7619341285249], [-79.2511235657526, 43.7615918247618], [-79.2510323102878, 43.761321581562]]}"},{"_id":70,"OBJECTID":3031,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"GRENVIEW (N) BLVD&lt;br&gt; From: [60 m N] BLOOR ST&lt;br&gt; To: KING GEORGES RD ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Frederik Meco","CONTACT_EMAIL":"Frederik.Meco@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5079698501656, 43.6486666364364], [-79.508383497891, 43.6496398792507], [-79.5087305049052, 43.6504587701712]]}"},{"_id":71,"OBJECTID":3032,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"LORAHILL RD&lt;br&gt; From: NORSEMAN ST&lt;br&gt; To: SEVENOAKS AVE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Frederik Meco","CONTACT_EMAIL":"Frederik.Meco@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.509479072201, 43.6376131595615], [-79.5093468490707, 43.6376625520275], [-79.5087117910153, 43.6377980729759], [-79.5086179079257, 43.6378063343584], [-79.5085273814341, 43.6377994550903], [-79.5084428874386, 43.6377684065966], [-79.5083755949567, 43.6377274462605], [-79.5083069108514, 43.6376603999822], [-79.5081057033901, 43.6374438321835], [-79.5080750985153, 43.6374112763516], [-79.5080110741026, 43.6373359752954], [-79.5079438156614, 43.6372652831348], [-79.5078819823368, 43.6371674873981], [-79.5078444425492, 43.6370809326883], [-79.5078245799594, 43.6370216149397], [-79.5077229943386, 43.6367811679138]]}"},{"_id":72,"OBJECTID":3036,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-18","PROJECT":"Local Road Resurfacing","LOCATION":"WARNICA AVE&lt;br&gt; From: [59 m S] STANMILLS RD&lt;br&gt; To: TRUEMAN AVE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Jennifer Harris, Engineering and Construction Services","CONTACT_EMAIL":"Jennifer.Harris@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.523900600813, 43.6236204867406], [-79.5228014683699, 43.6238586003382], [-79.5217681846564, 43.6240924331752], [-79.5216684449731, 43.6241176290473], [-79.5207815532523, 43.6243119809694], [-79.5205930020843, 43.6243646912967], [-79.5199332759813, 43.6244963277217], [-79.5198158367805, 43.6245111734479], [-79.5197096013555, 43.6244946922428], [-79.5196228484419, 43.624412614378], [-79.5193349909974, 43.6237254873284], [-79.5191251694852, 43.6232454147483]]}"},{"_id":73,"OBJECTID":3037,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-18","PROJECT":"Local Road Resurfacing","LOCATION":"JEFF DR&lt;br&gt; From: RICKSHAW AVE&lt;br&gt; To: NEILSON DR ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5634863149789, 43.6300396014801], [-79.563451086863, 43.6301370611189], [-79.5634370393478, 43.630201158833], [-79.5634763254001, 43.6303327193864], [-79.5636940879183, 43.6308164681106], [-79.5637093471256, 43.6308789202662], [-79.5637053708402, 43.6309157471761], [-79.563698938905, 43.6309507571729], [-79.5637176193975, 43.6309788671102], [-79.5637676412383, 43.6309723132098], [-79.5638360711663, 43.6309472061427], [-79.5639151522611, 43.6309160891518], [-79.5655811863225, 43.6305214516533]]}"},{"_id":74,"OBJECTID":3042,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"TENBY ST&lt;br&gt; From: HOLBROOKE AVE&lt;br&gt; To: ROYAL YORK RD ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Frederik Meco","CONTACT_EMAIL":"Frederik.Meco@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.501037786236, 43.6285822475979], [-79.5022107365851, 43.6283481766348], [-79.5033256204441, 43.6280961015396]]}"},{"_id":75,"OBJECTID":3043,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"COSMO RD&lt;br&gt; From: [162 m S] BLOOR ST W [END]&lt;br&gt; To: BLOOR ST W ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Frederik Meco","CONTACT_EMAIL":"Frederik.Meco@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5158048748829, 43.6463805639437], [-79.5151881296274, 43.6449211386113]]}"},{"_id":76,"OBJECTID":3050,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"GREENSIDES AVE&lt;br&gt; From: BENSON AVE&lt;br&gt; To: ST CLAIR AVE W ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Arthur Sinclair","CONTACT_EMAIL":"Arthur.Sinclair@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4294268538971, 43.6791032420124], [-79.4299052728289, 43.6802803232493], [-79.4301131439499, 43.6807916621136]]}"},{"_id":77,"OBJECTID":3054,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"PAILTON CRES&lt;br&gt; From: [74 m N] MERTON ST&lt;br&gt; To: BALLIOL ST ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Arthur Sinclair","CONTACT_EMAIL":"Arthur.Sinclair@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.389442814831, 43.6980086610638], [-79.3894794605058, 43.6980168876709], [-79.3894933003074, 43.6980199884922], [-79.3896739118805, 43.6980471668117], [-79.3897328090195, 43.6980652262127], [-79.3897905399805, 43.6980832934602], [-79.3898443919544, 43.6981058575831], [-79.3898959157606, 43.6981329110791], [-79.3899439286278, 43.6981599521703], [-79.3899872932936, 43.6981915074126], [-79.3900279534471, 43.6982230420339], [-79.3900662605971, 43.6982590840213], [-79.3901030293837, 43.6982951335179], [-79.3901382268396, 43.6983356551308], [-79.3901714971248, 43.6983716922411], [-79.3902063306584, 43.6984077308431], [-79.3902473632326, 43.6984392837455], [-79.3902919069025, 43.6984708220002], [-79.3903360205813, 43.6985068694685], [-79.3904258649215, 43.6985699646189], [-79.3904754209743, 43.6986015166074]]}"},{"_id":78,"OBJECTID":3055,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"BENTLEY DR&lt;br&gt; From: [N] YORKVIEW DR (ETBK)&lt;br&gt; To: AMBLESIDE AVE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Frederik Meco","CONTACT_EMAIL":"Frederik.Meco@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5061586088121, 43.6308706998363], [-79.5063723779743, 43.6314368756585], [-79.5063962508639, 43.6314805760797], [-79.506421238591, 43.6315192266525], [-79.5064572309099, 43.6315565623954], [-79.5064990092241, 43.6315805847407], [-79.5065298941464, 43.6316022943359]]}"},{"_id":79,"OBJECTID":3056,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"EASTBOURNE AVE&lt;br&gt; From: HILLSDALE AVE W&lt;br&gt; To: ANDERSON AVE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Arthur Sinclair","CONTACT_EMAIL":"Arthur.Sinclair@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4035659021488, 43.7020878045721], [-79.4041233356974, 43.7035107094222]]}"},{"_id":80,"OBJECTID":3057,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"WILBERTON RD&lt;br&gt; From: LASCELLES BLVD&lt;br&gt; To: ORIOLE PKWY ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Arthur Sinclair","CONTACT_EMAIL":"Arthur.Sinclair@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3995848081693, 43.6951197048012], [-79.4021912875346, 43.6945752894132]]}"},{"_id":81,"OBJECTID":3058,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"BAIRSTOW CRES&lt;br&gt; From: JEFFCOAT DR&lt;br&gt; To: HEATHERGLEN RD ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Frederik Meco","CONTACT_EMAIL":"Frederik.Meco@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.582553539496, 43.7191168339639], [-79.5826473026329, 43.7191892172855], [-79.5827552403895, 43.7192715816574], [-79.5828158883581, 43.7193322331742], [-79.5828913154527, 43.719454289482], [-79.5837623931578, 43.7212910256689], [-79.5837906850746, 43.7213493960333], [-79.5838186229203, 43.7214030229917], [-79.5838405785951, 43.7214388318588], [-79.583855629431, 43.7214893988333], [-79.5838518698054, 43.7215345878584], [-79.5838172056782, 43.7215615720213], [-79.5837653979318, 43.7215948156046], [-79.5836998633391, 43.7216191669821], [-79.5836132839809, 43.7216290777136], [-79.5827689350128, 43.7218360368501]]}"},{"_id":82,"OBJECTID":3059,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"HILLCREST DR&lt;br&gt; From: [S] BRACONDALE HILL RD [BRANCH]&lt;br&gt; To: TYRREL AVE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Arthur Sinclair","CONTACT_EMAIL":"Arthur.Sinclair@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4284322596937, 43.6754958043515], [-79.4285999162371, 43.6755186555336], [-79.4287759853476, 43.6755695238231], [-79.4288597751006, 43.6756084347028], [-79.4289277415559, 43.6756568140749], [-79.4290038841399, 43.6757129486217], [-79.4290765736069, 43.6758475184843], [-79.4295219376359, 43.6770950618092]]}"},{"_id":83,"OBJECTID":3060,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"PARK LANE&lt;br&gt; From: PARK LAWN RD&lt;br&gt; To: [90 m W] PARK LAWN RD [END] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Frederik Meco","CONTACT_EMAIL":"Frederik.Meco@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4920720471119, 43.6330333909127], [-79.4932870005554, 43.6327453972622]]}"},{"_id":84,"OBJECTID":3061,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"AGATHA RD&lt;br&gt; From: RAVENCREST DR&lt;br&gt; To: MARTIN GROVE RD ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Frederik Meco","CONTACT_EMAIL":"Frederik.Meco@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5576701473885, 43.6641854327833], [-79.5584288672355, 43.6640076490995]]}"},{"_id":85,"OBJECTID":3063,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"SUNNYDALE DR&lt;br&gt; From: PRINCE EDWARD DR S&lt;br&gt; To: HUMBERVALE BLVD ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Frederik Meco","CONTACT_EMAIL":"Frederik.Meco@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5021201311301, 43.6408287534492], [-79.502175125746, 43.6408242517278], [-79.5022305045859, 43.6408197499725], [-79.5022967407295, 43.6408062465962], [-79.5046942714219, 43.6402930407974], [-79.5062760674646, 43.6399418661689]]}"},{"_id":86,"OBJECTID":3067,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"[30 m S] BLOOR ST W&lt;br&gt; From: ELSFIELD RD&lt;br&gt; To: HUMBERVALE BLVD ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Frederik Meco","CONTACT_EMAIL":"Frederik.Meco@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5100688231119, 43.6471775100073], [-79.509572520507, 43.6472813563997], [-79.5094083010428, 43.6473709516288], [-79.5090254898259, 43.6474532729815]]}"},{"_id":87,"OBJECTID":3071,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"THURLOE AVE&lt;br&gt; From: BELSIZE DR&lt;br&gt; To: DE-SAVERY CRES ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Arthur Sinclair","CONTACT_EMAIL":"Arthur.Sinclair@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3893167385112, 43.702164763973], [-79.3894084028191, 43.7022863609543], [-79.3895237776948, 43.7023809769432], [-79.3898178021311, 43.7025518619627]]}"},{"_id":88,"OBJECTID":3083,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"BALACLAVA DR&lt;br&gt; From: FLORA DR&lt;br&gt; To: MCGREGOR RD ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Julfiker Hassan","CONTACT_EMAIL":"Julfiker.Hassan@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2769249565321, 43.7429309663759], [-79.2773516235974, 43.7440119436188], [-79.2776883654518, 43.744867713981], [-79.2779112079905, 43.7454622359467]]}"},{"_id":89,"OBJECTID":3084,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"TURNER RD&lt;br&gt; From: DAVENPORT RD&lt;br&gt; To: [W] HILLCREST DR [BRANCH] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Arthur Sinclair","CONTACT_EMAIL":"Arthur.Sinclair@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4253646627859, 43.6750811950491], [-79.4254339265844, 43.6752809615782], [-79.425663774974, 43.6758470063364]]}"},{"_id":90,"OBJECTID":3103,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-01","PROJECT":"Local Road Resurfacing","LOCATION":"PALMERSTON AVE&lt;br&gt; From: BLOOR ST W&lt;br&gt; To: LONDON ST ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4136497797888, 43.6646169739641], [-79.4136832413691, 43.6647326934357], [-79.4137453536953, 43.6649209672979], [-79.4138017026253, 43.6650645001266], [-79.4142164889728, 43.6661209839969]]}"},{"_id":91,"OBJECTID":3115,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-13","PROJECT":"Local Road Resurfacing","LOCATION":"TYRREL AVE&lt;br&gt; From: CHRISTIE ST&lt;br&gt; To: CONRAD AVE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Arthur Sinclair","CONTACT_EMAIL":"Arthur.Sinclair@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.424277361002, 43.6782182408947], [-79.4252642731424, 43.6780177739656]]}"},{"_id":92,"OBJECTID":3161,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-01","PROJECT":"Local Road Resurfacing","LOCATION":"DALEWOOD RD&lt;br&gt; From: SHELDRAKE BLVD&lt;br&gt; To: STIBBARD AVE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3905136918966, 43.7165459003074], [-79.390859328131, 43.7174072729293], [-79.3908735286254, 43.7174329490643], [-79.3908963015038, 43.7174398657643]]}"},{"_id":93,"OBJECTID":3171,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-01","PROJECT":"Local Road Resurfacing","LOCATION":"HANNAFORD ST&lt;br&gt; From: SWANWICK AVE (TO)&lt;br&gt; To: GERRARD ST E ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Bill Dakogiannis, Engineering and Construction Services","CONTACT_EMAIL":"bdakogi@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2926998398399, 43.6836596593544], [-79.2928447055284, 43.6839966248152], [-79.2930267591796, 43.6844200159309], [-79.2934485744232, 43.6854010929191]]}"},{"_id":94,"OBJECTID":3174,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-01","PROJECT":"Local Road Resurfacing","LOCATION":"GLEBEMOUNT AVE&lt;br&gt; From: [35.70 m N] MILVERTON BLVD&lt;br&gt; To: SPRINGDALE BLVD ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Bill Dakogiannis, Engineering and Construction Services","CONTACT_EMAIL":"bdakogi@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3191714555861, 43.688251356676], [-79.3193208558313, 43.688622500447]]}"},{"_id":95,"OBJECTID":3193,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-01","PROJECT":"Local Road Resurfacing","LOCATION":"GLEBEMOUNT AVE&lt;br&gt; From: SPRINGDALE BLVD&lt;br&gt; To: QUEENSDALE AVE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Bill Dakogiannis, Engineering and Construction Services","CONTACT_EMAIL":"bdakogi@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3193208558313, 43.688622500447], [-79.3196292483107, 43.689328284203]]}"},{"_id":96,"OBJECTID":3347,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-11","PROJECT":"Local Road Resurfacing","LOCATION":"NURSEWOOD RD&lt;br&gt; From: QUEEN ST E&lt;br&gt; To: [250 m S] QUEEN ST E [CUL-DE-SAC] ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Jennifer Harris, Engineering and Construction Services","CONTACT_EMAIL":"Jennifer.Harris@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2803121438245, 43.6717965894041], [-79.2803313262368, 43.6718412998402], [-79.2811883437376, 43.6738382127174], [-79.2811947085604, 43.6738647157885], [-79.2812163446666, 43.6739546533931]]}"},{"_id":97,"OBJECTID":3348,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-11","PROJECT":"Local Road Resurfacing","LOCATION":"PEMBROKE ST&lt;br&gt; From: GLENHOLME PL&lt;br&gt; To: GERRARD ST E ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"&lt;Null&gt; Transportation Roads State of Good Repair","CONTACT_EMAIL":"RoadSOGR@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3733429261042, 43.6604265349279], [-79.3735651792028, 43.6609427019941]]}"},{"_id":98,"OBJECTID":3356,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-07-28","PROJECT":"Local Road Resurfacing","LOCATION":"TINDER CRES&lt;br&gt; From: SLOANE AVE&lt;br&gt; To: SLOANE AVE ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q4 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Ehsan Movahedi, Engineering and Construction Services","CONTACT_EMAIL":"emovahe@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3106938898587, 43.72789601117], [-79.3106331520755, 43.7278419031411], [-79.3106157285363, 43.7278328730372], [-79.310560755582, 43.7277967769941], [-79.3105061657034, 43.7277651821777], [-79.3104403462001, 43.7277245674756], [-79.3103543424149, 43.7276884198665], [-79.3102691065091, 43.7276567740854], [-79.310172185222, 43.7276386106901], [-79.3100718027139, 43.727615949844], [-79.3099749100083, 43.7275887850918], [-79.3098466282876, 43.7275570674242], [-79.3097063066655, 43.7275253385699], [-79.3095989221573, 43.7275071482669], [-79.3094876829938, 43.7274754585838], [-79.3093791461229, 43.7274527745361], [-79.3092659261377, 43.7274390838079], [-79.3091918796093, 43.7274254583678], [-79.3091469705465, 43.7273983796791], [-79.3091261309453, 43.7273668405504], [-79.3091246384464, 43.7273443349648], [-79.3091375908874, 43.7272993504068], [-79.3091758117632, 43.727231904941], [-79.3092089502737, 43.727177961836], [-79.3092207091629, 43.7271374758938], [-79.3092585289681, 43.7270790129643], [-79.3093084351123, 43.7269980850939], [-79.3093645757952, 43.7269081663607], [-79.3094156502614, 43.7268227397705], [-79.3094589241483, 43.7267508020104], [-79.309501741839, 43.7267013665685], [-79.3095697382756, 43.726665474919], [-79.3096725664733, 43.7266521443295], [-79.3097908795608, 43.7266523412744], [-79.3099269293641, 43.7266840719271], [-79.3100807463716, 43.7267338344169], [-79.3101923692292, 43.7267655331652], [-79.3103202487044, 43.7268062420184], [-79.3104570545048, 43.7268424739129], [-79.3105822585591, 43.72686968518], [-79.3107244587154, 43.7269194275504], [-79.3108522822044, 43.7269781471918], [-79.3109657308104, 43.727041334535], [-79.3110705957986, 43.727122519054], [-79.3111727286069, 43.7272082085823], [-79.3112454813991, 43.727262327171], [-79.3113147147139, 43.7273344603804], [-79.3113668722426, 43.7273975551296], [-79.3114205955744, 43.7274561428177]]}"},{"_id":99,"OBJECTID":3390,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-07-22","PROJECT":"Local Road Resurfacing","LOCATION":"ISLAND RD&lt;br&gt; From: EAST AVE (SC)&lt;br&gt; To: ROUGE HILLS DR ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q4 2026 - Q3 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Amran Durrani, Engineering and Construction Services","CONTACT_EMAIL":"adurran2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.1388930203493, 43.7980947026587], [-79.1366634978724, 43.798572580878], [-79.1345358350613, 43.7990334411664], [-79.1324930439905, 43.7994799529307], [-79.1323875838002, 43.7994964818603], [-79.1323160094552, 43.7994993840076], [-79.1322752002233, 43.7994929609305]]}"},{"_id":100,"OBJECTID":3396,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-11","PROJECT":"Local Road Resurfacing","LOCATION":"PEMBROKE ST&lt;br&gt; From: DUNDAS ST E&lt;br&gt; To: GLENHOLME PL ","DETAILS":"Replacement of old asphalt surface with new asphalt surface, including repairs of any damaged sidewalks and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Jessica Orjuela, Engineering and Construction Services","CONTACT_EMAIL":"jorjuel@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Resurfacing","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3723898861768, 43.6581705927939], [-79.3726546471116, 43.658799047073], [-79.3732192344591, 43.6601392639222], [-79.3733429261042, 43.6604265349279]]}"}], "fields": [{"id": "_id", "type": "int"}, {"id": "OBJECTID", "type": "int4", "info": {"notes": "Unique row identifier"}}, {"id": "PROJ_NUM", "type": "text", "info": {"notes": ""}}, {"id": "LAST_UPDATED_DATE", "type": "date", "info": {"notes": "The most recent date on which the project information was revised or updated"}}, {"id": "PROJECT", "type": "text", "info": {"notes": "Road Resurfacing"}}, {"id": "LOCATION", "type": "text", "info": {"notes": "The name, beginning and end of the street where the road resurfacing project is located"}}, {"id": "DETAILS", "type": "text", "info": {"notes": "Project scope summary"}}, {"id": "DURATION/ Construction Timeline", "type": "text", "info": {"notes": "The year in which the project begins and ends"}}, {"id": "STATUS", "type": "text", "info": {"notes": "The status of the project"}}, {"id": "INV_PRIORITY", "type": "text", "info": {"notes": ""}}, {"id": "OWNER", "type": "text", "info": {"notes": "Owner of all road resurfacing projects is Transportation Services"}}, {"id": "CONTACT_NAME", "type": "text", "info": {"notes": "Contact person information"}}, {"id": "CONTACT_EMAIL", "type": "text", "info": {"notes": "Contact email address"}}, {"id": "INV_WEB_SITE", "type": "text", "info": {"notes": ""}}, {"id": "INV_DISPLAY_PROGRAM", "type": "text", "info": {"notes": ""}}, {"id": "INV_DISPLAY_SYMBOL", "type": "text", "info": {"notes": ""}}, {"id": "START_YEAR", "type": "text", "info": {"notes": "The year in which the project begins"}}, {"id": "CONTR_NUMBER", "type": "text", "info": {"notes": ""}}, {"id": "geometry", "type": "text", "info": {"notes": ""}}], "_links": {"start": "/api/action/datastore_search?resource_id=86410703-6caa-4bed-b8ae-e42622e0fc62", "next": "/api/action/datastore_search?resource_id=86410703-6caa-4bed-b8ae-e42622e0fc62&offset=100"}, "total": 1644, "total_was_estimated": false}}