﻿_id	OBJECTID	PROJ_NUM	LAST_UPDATED_DATE	PROJECT	LOCATION	DETAILS	DURATION/ Construction Timeline	STATUS	INV_PRIORITY	OWNER	CONTACT_NAME	CONTACT_EMAIL	INV_WEB_SITE	INV_DISPLAY_PROGRAM	INV_DISPLAY_SYMBOL	START_YEAR	CONTR_NUMBER	geometry
1	251	 	2025-10-14	Local Road Rehabilitation	CARLTON ST&lt;br&gt; From: METCALFE ST&lt;br&gt; To: DERMOTT PL 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3667013421698, 43.6647859999478], [-79.3665810096809, 43.6648000780788]]}"
2	347	 	2025-10-31	Laneway Reconstruction	[195.70 m N] DAVENPORT RD&lt;br&gt; From: ST CLARENS AVE&lt;br&gt; To: [36.10 m W] ST CLARENS AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4481827185954, 43.6734808102383], [-79.4487804363014, 43.6733499753259]]}"
3	349	 	2025-10-31	Laneway Reconstruction	[34.40 m N] AUBURN AVE&lt;br&gt; From: [45.70 m W] VIA ITALIA&lt;br&gt; To: [143.30 m W] VIA ITALIA 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4465894578189, 43.6749583030507], [-79.4463538719074, 43.6750084237118], [-79.4454613970196, 43.6752205181024]]}"
4	352	 	2025-10-14	Local Road Rehabilitation	CARLTON ST&lt;br&gt; From: WOODSTOCK PL&lt;br&gt; To: BOWMAN ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3645021590854, 43.6652537495124], [-79.3644791353327, 43.6652587809706], [-79.3644459028372, 43.6652660785571], [-79.3638396631037, 43.6654072533266]]}"
5	412	 	2025-10-14	Local Road Rehabilitation	CARLTON ST&lt;br&gt; From: PARLIAMENT ST&lt;br&gt; To: BROADCAST LANE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3680571008485, 43.664463438273], [-79.3674857192746, 43.6645993879443]]}"
6	438	 	2025-10-14	Local Road Rehabilitation	REGENT ST&lt;br&gt; From: SUTTON AVE&lt;br&gt; To: ST DAVID WALK 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2026	Active	None	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3637847207681, 43.6579141528371], [-79.3640219901551, 43.6585296828335]]}"
7	537	 	2025-10-14	Local Road Rehabilitation	COPPERFIELD RD&lt;br&gt; From: MANSE RD&lt;br&gt; To: [550 m E] MANSE RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.1717492025288, 43.7598266941598], [-79.1702954453143, 43.7601015590377], [-79.1690864585156, 43.7603231135549], [-79.1678579659028, 43.760562608152], [-79.1666351880858, 43.7607481018212], [-79.1658636208942, 43.7608898883774], [-79.1645153888148, 43.7611559833378], [-79.1640918001094, 43.7612537575918], [-79.1640467301174, 43.761262627204], [-79.1636322775794, 43.761340768032], [-79.1634380173713, 43.7613774097402], [-79.1632032854737, 43.761420288499], [-79.1627937603589, 43.7614963813335], [-79.1627117981359, 43.7615107502041], [-79.1625852313278, 43.7615193796121], [-79.1624423592323, 43.7615279616256], [-79.1624092435622, 43.7615264875376], [-79.1621883602568, 43.7615166645084]]}"
8	661	TS2023-10_11-435	2025-09-05	Local Road Reconstruction	AUGUSTA AVE&lt;br&gt; From: NASSAU ST&lt;br&gt; To: OXFORD ST (TO) 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4023360050878, 43.6552350592144], [-79.40268459094, 43.6560924157566]]}"
9	771	 	2025-09-18	Local Road Reconstruction	MILITARY TRL&lt;br&gt; From: ELLESMERE RD&lt;br&gt; To: EAST HIGHLAND CREEK 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2022 - Q4 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2021	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2171425832307, 43.779752592019], [-79.2172054230981, 43.7798897828557], [-79.2172618688727, 43.7800130240546], [-79.2172988738821, 43.780093496774], [-79.2173281849658, 43.7801560930678], [-79.2173465597279, 43.7802276805612], [-79.2173509862785, 43.7802904196302], [-79.2173631534842, 43.7803532336477], [-79.2173636959151, 43.7804071329807], [-79.2173571732176, 43.7804789541351], [-79.2173460341897, 43.780541761821], [-79.2173264150536, 43.780595574385], [-79.21731141708, 43.7806494541822], [-79.2172956345333, 43.7807034670535], [-79.217279839068, 43.7807575789029], [-79.2172578313647, 43.7808117923965], [-79.2172389049035, 43.7808659505004], [-79.2172160313002, 43.7809378040969], [-79.2171947128177, 43.7810094464084], [-79.217173380283, 43.7810811597892], [-79.2171615409991, 43.7811261542425], [-79.2171426645065, 43.7811802143386], [-79.2171345661565, 43.7812433382607], [-79.2171280744207, 43.7812974470062], [-79.2171239324524, 43.7813514535526], [-79.2171236488227, 43.7814145077019], [-79.2171311298462, 43.7814775819681], [-79.2171339262548, 43.781540589732], [-79.21713825793, 43.7815944381251], [-79.2171433243883, 43.781666354542], [-79.2171569614542, 43.7817383731783], [-79.217172175822, 43.7817923214087], [-79.2171893754062, 43.7818547275276], [-79.2172072947776, 43.7819170445125], [-79.2172370945157, 43.7819707596857], [-79.2172779743002, 43.782024890209], [-79.2173119392395, 43.7820700294696], [-79.217340550313, 43.7821152814953], [-79.217378524429, 43.7821425003634], [-79.2174474739798, 43.7821878088975], [-79.2174954457882, 43.7822239545775], [-79.2175449514165, 43.782250985865], [-79.2175834386567, 43.7822777099693], [-79.2176093051846, 43.7823040509335], [-79.2176428873181, 43.7823303029394], [-79.2176824863478, 43.7823929821411], [-79.2177006717272, 43.7824200323033], [-79.2177267533991, 43.7824561220146], [-79.2177400525637, 43.7824921441479], [-79.2177549791326, 43.7825464156244], [-79.2177566365231, 43.7825931464741], [-79.2177474653666, 43.782638806449], [-79.2177256249172, 43.7826729928751], [-79.2177038361854, 43.7826990873932], [-79.2176712160266, 43.7827350114077], [-79.217627770915, 43.782779909816], [-79.2175847576316, 43.7828251693205], [-79.2175221552344, 43.7828910749319], [-79.217472705271, 43.7829262453011], [-79.2173183419151, 43.7830335893412], [-79.2171999969881, 43.7831249651533], [-79.2171161848366, 43.783206697879], [-79.2170426374135, 43.7832694077293], [-79.2169586035712, 43.78331377423], [-79.2168539765475, 43.783385580054], [-79.2167740827737, 43.7834213785823], [-79.2166983104, 43.783466026396], [-79.2166161520425, 43.7835106583254], [-79.2164667164212, 43.7835920469162], [-79.2163552876332, 43.7836548684647], [-79.2162462067748, 43.7837176867319], [-79.2161471429289, 43.7837821418777], [-79.2160599622416, 43.7838351040929], [-79.2156789503788, 43.7840665592682]]}"
10	1060	1	2025-08-21	Local Road Reconstruction	ST LEONARDS AVE&lt;br&gt; From: LEWES CRES&lt;br&gt; To: BAYVIEW AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Andrea Ramsay, Engineering and Construction Services	aramsay@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3840849904927, 43.7247559634183], [-79.3821241626606, 43.7251647415177], [-79.3811784911169, 43.7253741502017], [-79.3811055734359, 43.7253902874149], [-79.380203634747, 43.7255848040467]]}"
11	2584	 	2026-02-18	Local Road Reconstruction	BRAESIDE RD&lt;br&gt; From: LANGTON AVE&lt;br&gt; To: [N-S] BRAESIDE RD [BRANCH] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3923982481767, 43.7305233036032], [-79.391433883014, 43.7307240886428], [-79.3913668845037, 43.7307261492777], [-79.3913186997697, 43.7307197107964]]}"
12	3018	 	2026-03-11	Laneway Reconstruction	Alan Borovoy Lane&lt;br&gt; From: [39.3 m E] GRACE ST (TO)&lt;br&gt; To: JERSEY AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2026 - Q2 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4152006152564, 43.6554195662412], [-79.4164095716357, 43.6585765551403], [-79.4163697594062, 43.6585954981621]]}"
13	3047	 	2026-04-21	Local Road Reconstruction	ZAPH AVE&lt;br&gt; From: ELLESMERE RD&lt;br&gt; To: [762 m N] ELLESMERE AVE [CUL-DE-SAC] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.1667276247241, 43.7917396982679], [-79.1673478521731, 43.7930824701267], [-79.1677442462625, 43.793940627809], [-79.1678281423517, 43.7941287117041], [-79.1683264158111, 43.7952195732394], [-79.1687670413371, 43.7961779281127], [-79.1688008359139, 43.796251440119], [-79.1692238860574, 43.7971715413646], [-79.1698651130894, 43.7985584204752], [-79.170003313288, 43.7988717327379], [-79.1700847528557, 43.7990317890393], [-79.1700913760179, 43.7990386652109]]}"
14	3387	TS2023-10_11-435	2025-09-05	Local Road Reconstruction	AUGUSTA AVE&lt;br&gt; From: DENISON SQ&lt;br&gt; To: BALDWIN ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4017770621429, 43.6538823519038], [-79.4019129489346, 43.6542119676772], [-79.4019161459722, 43.654219729588], [-79.4020351684402, 43.6545084150705]]}"
15	3388	1	2025-08-21	Local Road Reconstruction	ST LEONARDS AVE&lt;br&gt; From: [155 m W] MILDENHALL RD&lt;br&gt; To: LEWES CRES 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Andrea Ramsay, Engineering and Construction Services	aramsay@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3868376928893, 43.7241643255961], [-79.3849823905845, 43.7245527091598], [-79.3840849904927, 43.7247559634183]]}"
16	3397	TS2023-10_11-435	2025-09-05	Local Road Reconstruction	AUGUSTA AVE&lt;br&gt; From: OXFORD ST (TO)&lt;br&gt; To: COLLEGE ST (TO) 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.40268459094, 43.6560924157566], [-79.4032003064351, 43.6573828857872]]}"
17	3411	TS2023-13-044	2025-08-28	Local Road Reconstruction	SACKVILLE PL&lt;br&gt; From: WOODSTOCK PL&lt;br&gt; To: FLAGLER ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2025 - Q3 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.364759658338, 43.6659572730188], [-79.3646466576578, 43.6659828749929]]}"
18	3427	 	2026-02-18	Local Road Reconstruction	[N-S] BRAESIDE RD [BRANCH]&lt;br&gt; From: BRAESIDE CRES&lt;br&gt; To: WANLESS CRES 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3905438757911, 43.7291351132711], [-79.3903556057391, 43.7285535654651], [-79.3902974312957, 43.7284420446276]]}"
19	3439	 	2021-04-12	Laneway Reconstruction	[32 m E] ST CLARENS AVE&lt;br&gt; From: COLLEGE ST (TO)&lt;br&gt; To: [27.80 m N] COLLEGE ST (TO) 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4382658698794, 43.6514385788415], [-79.4383769880856, 43.6517237208411]]}"
20	3453	 	2021-04-12	Laneway Reconstruction	[37 m N] WOBURN AVE&lt;br&gt; From: LEDBURY ST&lt;br&gt; To: [43 m W] LEDBURY ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4239127572605, 43.7243788422202], [-79.4244787396344, 43.7242666840196]]}"
21	3463	 	2021-09-01	Laneway Reconstruction	[27.40 m W] BAY ST&lt;br&gt; From: TEMPERANCE ST&lt;br&gt; To: RICHMOND ST W 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Gabor Szakter, Engineering and Construction Services	gszakte@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3815384546847, 43.6504649376741], [-79.3817994165711, 43.6510645453407]]}"
22	3512	 	2021-07-12	Local Road Rehabilitation	HENNING AVE&lt;br&gt; From: EGLINTON AVE W&lt;br&gt; To: [107 m N] EGLINTON AVE W [END] 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4014521157876, 43.7061002196874], [-79.4018118861901, 43.7071266382737]]}"
23	3703	 	2022-08-29	Laneway Reconstruction	[30.50 m W] OSSINGTON AVE&lt;br&gt; From: BADEN ST&lt;br&gt; To: [30.20 m N] BADEN ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4216355315554, 43.6500756097822], [-79.421591252616, 43.6500841307132], [-79.4217053489407, 43.6503902461918]]}"
24	3726	 	2022-09-27	Laneway Reconstruction	[28.60 m W] YORK ST&lt;br&gt; From: [52 m S] RICHMOND ST W&lt;br&gt; To: RICHMOND ST W 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3851110950526, 43.6503416018767], [-79.3848953663775, 43.64980495776]]}"
25	3739	 	2022-08-29	Laneway Reconstruction	[33.50 m E] EMERSON AVE&lt;br&gt; From: [30.50 m N] WALLACE AVE&lt;br&gt; To: ARMSTRONG AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4419968763231, 43.6632356139409], [-79.4420207671826, 43.6633025150236], [-79.4421819084151, 43.6637535367856]]}"
26	3796	TS2023-09-011	2023-02-13	Local Road Rehabilitation	ASCOT AVE&lt;br&gt; From: BOON AVE&lt;br&gt; To: EARLSCOURT AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4471291729001, 43.6794463072249], [-79.4483381993882, 43.6791741606789]]}"
27	3810	 	2023-03-24	Major Road Reconstruction	BLOOR ST W&lt;br&gt; From: AVENUE RD&lt;br&gt; To: BEDFORD RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2023 - Q2 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Ahmed Bhabha, Engineering and Construction Services	abhabha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2023	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3941414146867, 43.6687202616384], [-79.3958757488491, 43.6683327872895], [-79.3973807881437, 43.6680332274401]]}"
28	3817	TS2023-09-011	2023-02-13	Local Road Rehabilitation	ASCOT AVE&lt;br&gt; From: DUFFERIN ST&lt;br&gt; To: ST CLAIR GDNS 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4439547821963, 43.6801495411554], [-79.4454150061561, 43.679822893364], [-79.4459694905645, 43.6796988576399]]}"
29	3835	 	2023-05-05	Laneway Reconstruction	[30 m E] WINNIFRED AVE&lt;br&gt; From: [33.50 m N] EASTERN AVE&lt;br&gt; To: [35.10 m S] QUEEN ST E 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Shahid Virk, Engineering and Construction Services	svirk@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3348009845398, 43.6596999376606], [-79.3356450503918, 43.6616500378625]]}"
30	3843	 	2023-02-13	Laneway Reconstruction	[25 m N] ADELAIDE ST W&lt;br&gt; From: DUNCAN ST&lt;br&gt; To: [27.40 m W] DUNCAN ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3888050921048, 43.6485070667884], [-79.3892446711243, 43.6484187445784]]}"
31	4704	1	2024-03-14	Local Road Reconstruction	LEWES CRES&lt;br&gt; From: ST LEONARDS AVE&lt;br&gt; To: ST LEONARDS AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3840849904927, 43.7247559634183], [-79.3841050445765, 43.7248343962801], [-79.3840878575287, 43.7249536399168], [-79.384074005477, 43.725061310433], [-79.3839519974445, 43.7258025955114], [-79.3833269000062, 43.7259424820346], [-79.383250240381, 43.7259488144433], [-79.3831977340256, 43.7259497608385], [-79.3831326690852, 43.7259366605352], [-79.383096884996, 43.725930251964], [-79.3830435540253, 43.7259097465877], [-79.3829742839245, 43.7258711503764], [-79.382915476077, 43.7258338250141], [-79.3828594289637, 43.7257874733056], [-79.3828143247871, 43.7257434830128], [-79.3827678245418, 43.7256961959155], [-79.3827165309599, 43.7256259408137], [-79.3826783706125, 43.7255671667505], [-79.3826381264236, 43.7254956447763], [-79.3826162367751, 43.7254440532847], [-79.382588556623, 43.7254021681805], [-79.3825426327119, 43.7253523522319], [-79.382475561994, 43.7253072761805], [-79.3824204726173, 43.7252787215929], [-79.382344591599, 43.7252440247343], [-79.3822769630855, 43.7252170872946], [-79.3821241626606, 43.7251647415177]]}"
32	4717	 	2024-03-14	Local Road Reconstruction	HASLEMERE RD&lt;br&gt; From: LANGTON AVE&lt;br&gt; To: BRAESIDE RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3920647101273, 43.7297043106476], [-79.3908941022949, 43.7299304336252]]}"
33	4724	 	2024-04-05	Local Road Rehabilitation	FORD ST&lt;br&gt; From: CONNOLLY ST&lt;br&gt; To: ST CLAIR AVE W 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q4 2025 (Carry-Over)	Active	None	Transportation Services	Matthew McAinsh, Engineering and Construction Services	mmcains@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4617647312962, 43.6718978815109], [-79.4625167888994, 43.6736548248326]]}"
34	4725	 	2024-03-14	Local Road Reconstruction	ST AUBYNS CRES&lt;br&gt; From: BAYVIEW WOOD&lt;br&gt; To: LEWES CRES 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Andrea Ramsay, Engineering and Construction Services	aramsay@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3831977340256, 43.7259497608385], [-79.3830039406515, 43.7263523942656], [-79.3829824627989, 43.7264154016645], [-79.3829747617392, 43.7264551981646], [-79.3829761906555, 43.7265060665356], [-79.3829898337214, 43.7265503035951], [-79.3830186945982, 43.7266000928908], [-79.3830584921605, 43.7266504226414], [-79.3831346403131, 43.7267090886923], [-79.3832249519043, 43.7267621973951], [-79.3833231755616, 43.7268183457203], [-79.3834168364114, 43.7268598901964], [-79.3835078225155, 43.7268911974603], [-79.3835897492007, 43.7269089206562], [-79.3836793197926, 43.7269213318399]]}"
35	4733	TS2023-15-290	2024-03-14	Local Road Reconstruction	[E] WANLESS CRES [BRANCH]&lt;br&gt; From: BUCKINGHAM AVE&lt;br&gt; To: LAWRENCE AVE E 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3898692280134, 43.7268063967709], [-79.3898606757624, 43.7268139450712], [-79.3898435058525, 43.7268295096713], [-79.389826323171, 43.7268445881895], [-79.3898086797449, 43.7268611514654], [-79.3897915144474, 43.7268809556458], [-79.3897766920917, 43.7269023823061], [-79.3897282049896, 43.7269651002821], [-79.3896618767372, 43.7270370371875], [-79.3896140512742, 43.7271110883124], [-79.3895651208084, 43.7272061832458], [-79.3895301386397, 43.7273029577674], [-79.3895110684864, 43.7273865509427], [-79.3895042047883, 43.7274950632417], [-79.3895074426673, 43.7275844837754], [-79.3895222931819, 43.7276701179098], [-79.3895314578623, 43.7277907163564]]}"
36	4853	TS2023-13-001	2024-04-25	Major Road Reconstruction	GERRARD ST E&lt;br&gt; From: CENTRAL HOSPITAL LANE&lt;br&gt; To: SEATON ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2027 - Q3 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marilia Cimini, Engineering and Construction Services	mcimini@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3714388008979, 43.6614023360052], [-79.3707022026958, 43.6615644097245]]}"
37	4893	 	2024-04-05	Laneway Reconstruction	[38.10 m N] BLOOR ST W&lt;br&gt; From: DORVAL RD&lt;br&gt; To: INDIAN RD 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2024 - Q3 2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.45445936145, 43.656382165673], [-79.4569734001402, 43.6558233058766]]}"
38	5039	TS2023-04-223	2024-06-26	Local Road Rehabilitation	MARGDON RD&lt;br&gt; From: KENNEDY PARK RD&lt;br&gt; To: GLENDONWYNNE RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4732038861529, 43.6527118143564], [-79.4732867723957, 43.6526117962668], [-79.4733498847216, 43.6525856764555], [-79.473418683022, 43.6525690633652], [-79.474381054799, 43.6523617954893]]}"
39	5053	TS2023-04-089	2024-06-26	Local Road Rehabilitation	EVANS AVE (TO)&lt;br&gt; From: COLBECK ST&lt;br&gt; To: ARDAGH ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.483865437579, 43.6534273781895], [-79.4850005380202, 43.6561965500742]]}"
40	5360	TS2023-15-006	2024-06-28	Local Road Reconstruction	BRIDLE PATH THE&lt;br&gt; From: [350 m E] BAYVIEW AVE&lt;br&gt; To: BAYVIEW AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2024 - Q1 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Matthew McAinsh, Engineering and Construction Services	mmcains@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3822969117696, 43.7385257312075], [-79.3809399577641, 43.7388084673418], [-79.3781692763482, 43.739368560522], [-79.3780820753087, 43.7393863376641]]}"
41	5679	 	2024-08-13	Local Road Rehabilitation	REDPATH AVE&lt;br&gt; From: EGLINTON AVE E&lt;br&gt; To: ROEHAMPTON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2026 - Q4 2026	Active	None	Transportation Services	Bill Dakogiannis, Engineering and Construction Services	bdakogi@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3928193662151, 43.7078611540079], [-79.3932944623297, 43.709071936103]]}"
42	5794	 	2025-04-11	Laneway Reconstruction	CHESTNUT LANE&lt;br&gt; From: [42 m S] CHESTNUT HILLS CRES&lt;br&gt; To: [66 m S] CHESTNUT HILLS CRES 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Angela Au, Engineering and Construction Services	aau2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5260269023073, 43.6527792097134], [-79.52633760125, 43.6529222394311]]}"
43	5984	 	2024-10-03	Local Road Rehabilitation	MONOGRAM PL&lt;br&gt; From: [149 m W] ISLINGTON AVE&lt;br&gt; To: [329 m W] ISLINGTON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q4 2026	Active	None	Transportation Services	Angela Au, Engineering and Construction Services	aau2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5521526839498, 43.704483706961], [-79.5542971690567, 43.7039904367322]]}"
44	6299	TS2023-24-430	2025-10-14	Major Road Reconstruction	SCARBOROUGH GOLF CLUB RD&lt;br&gt; From: BRIMORTON DR&lt;br&gt; To: ELLESMERE RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2025 - Q3 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Mehrshad Rahimi, Engineering and Construction Services	mrahimi@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2186842206825, 43.7698112450039], [-79.2194785899252, 43.7717858741016], [-79.2200726388182, 43.7732636671943], [-79.2206551372909, 43.7747141361767], [-79.221052804192, 43.7756809894112], [-79.2214293864883, 43.776605839821], [-79.2214704733675, 43.7766988877025], [-79.2222172113688, 43.7785568936056]]}"
45	6410	TS2024-10_11-027	2025-03-19	Major Road Rehabilitation	[E] UNIVERSITY AVE [BRANCH]&lt;br&gt; From: DUNDAS ST W&lt;br&gt; To: EDWARD ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2027 (Carry-Over)	Active	None	Transportation Services	Manveer Ramburrun, Engineering and Construction Services	mrambur@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3881457854229, 43.6548243888577], [-79.3882868802567, 43.6551417615196], [-79.3884527451187, 43.6555123732583]]}"
46	6453	 	2025-10-14	Local Road Rehabilitation	REGENT ST&lt;br&gt; From: ST DAVID WALK&lt;br&gt; To: ST BARTHOLOMEW ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2026	Active	None	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3640219901551, 43.6585296828335], [-79.3642448102343, 43.6591221633683]]}"
47	6476	 	2025-12-03	Laneway Reconstruction	FITZROY TER&lt;br&gt; From: [50 m W] KENSINGTON AVE (TO)&lt;br&gt; To: [52 m W] KENSINGTON AVE (TO) [END] 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4007953113884, 43.6533083689239], [-79.4009283472529, 43.6532792298905]]}"
48	6488	TS2023-08-414	2025-10-31	Local Road Rehabilitation	ORIOLE PKWY&lt;br&gt; From: ORCHARD VIEW BLVD&lt;br&gt; To: ELWOOD BLVD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2027 - Q4 2028	Active	None	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.40711993841, 43.7070861600804], [-79.4072101079657, 43.7074777696901]]}"
49	6490	TS2023-10_11-435	2025-09-05	Local Road Reconstruction	AUGUSTA AVE&lt;br&gt; From: WALES AVE&lt;br&gt; To: DENISON SQ 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4015688258877, 43.6533468153691], [-79.4017770621429, 43.6538823519038]]}"
50	6491	TS2023-10_11-435	2025-09-05	Local Road Reconstruction	AUGUSTA AVE&lt;br&gt; From: DUNDAS ST W&lt;br&gt; To: WALES AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4011469079516, 43.6522746021317], [-79.4012953953978, 43.6526519332193], [-79.401310162027, 43.6526894546233], [-79.4014380216955, 43.6530143590906], [-79.4015688258877, 43.6533468153691]]}"
51	6496	 	2025-10-14	Local Road Rehabilitation	CARLTON ST&lt;br&gt; From: RAWLINGS AVE&lt;br&gt; To: SUMACH ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3632393117332, 43.6655390894353], [-79.3625174394227, 43.6656921436714]]}"
52	6504	 	2025-10-14	Local Road Rehabilitation	CARLTON ST&lt;br&gt; From: SACKVILLE ST&lt;br&gt; To: WOODSTOCK PL 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3650544654706, 43.6651339478541], [-79.3645021590854, 43.6652537495124]]}"
53	6506	1	2025-10-14	Local Road Reconstruction	ROCHESTER AVE&lt;br&gt; From: ST IVES CRES&lt;br&gt; To: LEWES CRES 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Rachele Joseph, Engineering and Construction Services	rgjoseph@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3894553293459, 43.7246704869109], [-79.3853886041248, 43.7255219245174]]}"
54	6509	 	2025-10-31	Laneway Reconstruction	[28.70 m N] SPRINGHURST AVE&lt;br&gt; From: COWAN AVE&lt;br&gt; To: DUNN AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4304991328845, 43.6343040121647], [-79.4318736417011, 43.6340241781122]]}"
55	6517	 	2025-10-14	Local Road Reconstruction	HIGHLAND GDNS&lt;br&gt; From: [73 m W] HIGHLAND AVE [END]&lt;br&gt; To: [73 m W] HIGHLAND AVE [END] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3815816319326, 43.6824393660884], [-79.3816929377368, 43.6824116177864], [-79.3817923972122, 43.6824002890171], [-79.3818622678438, 43.682416079336], [-79.3819005532954, 43.6824732763137], [-79.3818797874033, 43.6825196953142], [-79.381833453308, 43.6825510844999], [-79.3817536679897, 43.6825710074052], [-79.3816679835857, 43.6825859230207], [-79.3815842743853, 43.6825979809021], [-79.3815104376598, 43.6825957602774]]}"
56	6531	 	2025-09-10	Local Road Rehabilitation	BOSWELL AVE&lt;br&gt; From: [240.80 m E] BEDFORD RD [END]&lt;br&gt; To: BEDFORD RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Angela Au, Engineering and Construction Services	aau2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3959798989538, 43.6726076617825], [-79.3988644329508, 43.6720084791832]]}"
57	6760	TS2023-11-145	2025-10-30	Local Road Reconstruction	CLIFTON RD&lt;br&gt; From: [73 m S] GLENROSE AVE [END]&lt;br&gt; To: GLENROSE AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Hazel Breton, Engineering and Construction Services	hbreton@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3834818499899, 43.6885497285425], [-79.3835885044229, 43.6885746906983], [-79.3836512137071, 43.6885971416772], [-79.3836898389027, 43.6886162331368], [-79.3837153827839, 43.6886441235492], [-79.3837418307841, 43.6886920202643], [-79.3838774920874, 43.6889819072937], [-79.3839793704392, 43.6892205433723]]}"
58	6774	 	2025-10-30	Local Road Reconstruction	[E-W] RIPLEY AVE [LEG]&lt;br&gt; From: SOUTH KINGSWAY&lt;br&gt; To: RIPLEY AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4752735104859, 43.6367801192758], [-79.4750956391247, 43.6368789671545], [-79.4747420438052, 43.6370114124302], [-79.4746954643346, 43.6370258151427], [-79.4746477260908, 43.6370488949118], [-79.4746018648908, 43.6370880704496], [-79.4745885493667, 43.63714595808], [-79.4745930727818, 43.6371820456265]]}"
59	7220	 	2025-11-17	Local Road Rehabilitation	WALES AVE&lt;br&gt; From: DENISON AVE&lt;br&gt; To: BELLEVUE AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2027 - Q4 2028	Active	None	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4026878065616, 43.6531114634911], [-79.4029094143391, 43.6530886876627]]}"
60	7260	 	2026-02-18	Local Road Reconstruction	LANGTON AVE&lt;br&gt; From: HASLEMERE RD&lt;br&gt; To: BRAESIDE RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3920647101273, 43.7297043106476], [-79.3923982481767, 43.7305233036032]]}"
61	7535	 	2026-04-21	Laneway Reconstruction	[44.50 m N] DUNDAS ST W&lt;br&gt; From: [95.40 m E] HURON ST&lt;br&gt; To: HURON ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3958991824756, 43.6539042948101], [-79.3963577279059, 43.6538134539269]]}"
62	7593	 	2025-11-17	Local Road Rehabilitation	WALES AVE&lt;br&gt; From: AUGUSTA AVE&lt;br&gt; To: DENISON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2027 - Q4 2028	Active	None	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4015688258877, 43.6533468153691], [-79.4026878065616, 43.6531114634911]]}"
63	7784	 	2026-03-19	Local Road Reconstruction	RIDELLE AVE&lt;br&gt; From: MANITOU BLVD&lt;br&gt; To: LAWNHURST BLVD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4285835861986, 43.7067692737433], [-79.4306603358075, 43.7063224618657]]}"
64	7797	 	2026-03-19	Local Road Reconstruction	RIDELLE AVE&lt;br&gt; From: OLD PARK RD&lt;br&gt; To: OVERDALE RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4329630691003, 43.7058560969965], [-79.4340824104198, 43.7055975320004]]}"
65	7798	 	2026-03-19	Local Road Reconstruction	RIDELLE AVE&lt;br&gt; From: OVERDALE RD&lt;br&gt; To: MARWOOD RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4340824104198, 43.7055975320004], [-79.4352586953962, 43.7053528781632]]}"
66	7845	 	2026-04-16	Major Road Reconstruction	DON MILLS RD&lt;br&gt; From: [230m S]OVERLEA BLVD&lt;br&gt; To: OVERLEA BLVD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2026 - 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	&lt;Null&gt; Transportation Roads State of Good Repair	RoadSOGR@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3337008213934, 43.7075795821829], [-79.3337275235195, 43.7077431947881], [-79.3337524325715, 43.7078723119132], [-79.3337693390237, 43.7080020654836], [-79.3337815818777, 43.7081401105361], [-79.333801432322, 43.7082728027901], [-79.3338195269054, 43.7083673712154], [-79.3338403814811, 43.708449259962], [-79.3338437356063, 43.708506269866], [-79.3338657546189, 43.7085794650742], [-79.3339195914619, 43.7087862151086], [-79.3339800147647, 43.7089625413933], [-79.3340369402652, 43.7091384746075], [-79.3341004300905, 43.7093369753892], [-79.3342038743859, 43.7095852939869], [-79.3343136679024, 43.709848466571], [-79.3343949810683, 43.7099964508938]]}"
67	7863	 	2026-03-19	Local Road Reconstruction	RIDELLE AVE&lt;br&gt; From: LAWNHURST BLVD&lt;br&gt; To: BURMONT RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4306603358075, 43.7063224618657], [-79.4318104838685, 43.7060823742306]]}"
68	7867	 	2026-04-21	Laneway Reconstruction	[79.20 m W] HURON ST&lt;br&gt; From: DUNDAS ST W&lt;br&gt; To: D&apos;ARCY ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3972709063245, 43.6531172627229], [-79.3974500705277, 43.653578495542], [-79.3976430744263, 43.654075299388]]}"
69	7913	 	2026-04-21	Laneway Reconstruction	[46.30 m N] DUNDAS ST W&lt;br&gt; From: BEVERLEY ST&lt;br&gt; To: [42.70 m W] BEVERLEY ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.394051714682, 43.6542702785192], [-79.3945509542036, 43.6541713678773]]}"
70	7914	 	2026-04-21	Laneway Reconstruction	[43.30 m N] DUNDAS ST W&lt;br&gt; From: HURON ST&lt;br&gt; To: [79.20 m W] HURON ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3963577279059, 43.6538134539269], [-79.3974500705277, 43.653578495542]]}"
71	7921	 	2026-04-21	Laneway Reconstruction	[34 m N] FLORENCE AVE&lt;br&gt; From: [54 m E] EILEEN AVE&lt;br&gt; To: EILEEN AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4949862032112, 43.6695973684542], [-79.4946385510168, 43.6699354210539], [-79.4945038551901, 43.6700663912139]]}"
72	7991	 	2023-05-09	Local Road Rehabilitation	ROSLIN AVE&lt;br&gt; From: RONAN AVE&lt;br&gt; To: [230 m E] RONAN AVE [END] 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2026 - Q4 2026	Active	None	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3956034362273, 43.7309998722757], [-79.3930131020009, 43.7315380001873], [-79.3928150300386, 43.7315878461685], [-79.3927290931782, 43.7316280037581]]}"
73	8024	 	2023-02-13	Local Road Rehabilitation	ROSELAWN AVE&lt;br&gt; From: CASTLEWOOD RD&lt;br&gt; To: LATIMER AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2026 - Q4 2026	Active	None	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4162242647162, 43.7073587030923], [-79.4170993159339, 43.7071568142802]]}"
74	8071	 	2021-07-12	Local Road Rehabilitation	CARLING AVE&lt;br&gt; From: BLOOR ST W&lt;br&gt; To: IRENE AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2024 - Q2 2025 (Carry-Over)	Active	None	Transportation Services	Dennis Coronel, Engineering and Construction Services	dcorone@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4246453518477, 43.6621985657573], [-79.4248081618785, 43.6626166142716], [-79.4248969649302, 43.6628446316204]]}"
75	8077	 	2021-07-12	Local Road Rehabilitation	RAMPART RD&lt;br&gt; From: MARTIN GROVE RD&lt;br&gt; To: [105 m E] MARTIN GROVE RD [CUL-DE-SAC] 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2024 - Q4 2025 (Carry-Over)	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5903711963217, 43.7340113037318], [-79.5899604928695, 43.7341152948613], [-79.5891731945518, 43.7343146319075], [-79.5891327342896, 43.7343373645631], [-79.5890449793373, 43.7343866786798]]}"
76	8086	 	2023-02-13	Local Road Rehabilitation	MACPHERSON AVE&lt;br&gt; From: [N] DAVENPORT RD [BRANCH]&lt;br&gt; To: [15.20 m W] DAVENPORT RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4036901216454, 43.6766801432083], [-79.4040959554037, 43.6765933111377]]}"
77	8096	 	2022-08-18	Laneway Reconstruction	NUNES LANE&lt;br&gt; From: MC FARLAND AVE&lt;br&gt; To: VIA ITALIA 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2026 - Q2 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4425101582618, 43.673247569697], [-79.4437645179198, 43.6729581349581]]}"
78	8216	 	2023-05-05	Laneway Reconstruction	[30.50 m S] QUEEN ST E&lt;br&gt; From: WINNIFRED AVE&lt;br&gt; To: CAROLINE AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Shahid Virk, Engineering and Construction Services	svirk@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.336150518089, 43.6615353680845], [-79.3356450503918, 43.6616500378625], [-79.3351735966844, 43.6617449271971]]}"
79	8255	 	2022-08-29	Local Road Reconstruction	HOLLAMAN RD&lt;br&gt; From: GLEN PARK AVE&lt;br&gt; To: [40 m N] GLEN PARK AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2026 - Q2 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Matthew McAinsh, Engineering and Construction Services	mmcains@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4294173872541, 43.7130262491248], [-79.4298163688248, 43.713266387425]]}"
80	8267	 	2021-07-30	Laneway Rehabilitation	[84.40 m W] CHRISTIE ST&lt;br&gt; From: [39 m N] TYRREL AVE&lt;br&gt; To: ILFORD RD 	Replacement of partial or entire laneway pavement structure for either partial or full laneway width. This could include the asphalt, concrete and underlying support materials. Repair, improvement or replacement of laneway drainage, curbs and associated areas. Work may include the closure of individual lanes or the entire laneway.	Q4 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4255867536006, 43.678411215879], [-79.4257995807273, 43.678881537981]]}"
81	8294	 	2023-02-13	Local Road Rehabilitation	MACPHERSON AVE&lt;br&gt; From: [15.20 m W] DAVENPORT RD&lt;br&gt; To: HURON ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4040959554037, 43.6765933111377], [-79.4051682267088, 43.6763638637536]]}"
82	8497	 	2023-10-06	Local Road Rehabilitation	FOSTER PL&lt;br&gt; From: [57.70 m E] ELIZABETH ST (TO) [END]&lt;br&gt; To: ELIZABETH ST (TO) 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	2027	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3841195280987, 43.654736809786], [-79.3848612587942, 43.6545472112448]]}"
83	8568	 	2023-02-13	Local Road Rehabilitation	MACPHERSON AVE&lt;br&gt; From: WALMER RD&lt;br&gt; To: KENDAL AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4086770638926, 43.6756331312167], [-79.4092068145176, 43.6755228441598], [-79.409542868708, 43.6754528552707], [-79.4096177161817, 43.6754333996106], [-79.4096551291579, 43.6754262857373], [-79.4096781033274, 43.6754229698031], [-79.4097122263847, 43.6754239499999]]}"
84	8807	 	2023-05-19	Local Road Reconstruction	CLOVELLY AVE&lt;br&gt; From: OAKWOOD AVE&lt;br&gt; To: GLENHOLME AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2028 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4418148882369, 43.694986981084], [-79.4422965109564, 43.694883647374], [-79.4443384983444, 43.6944456048705]]}"
85	8890	 	2023-12-06	Local Road Rehabilitation	SNOOKER ST&lt;br&gt; From: HANNA AVE&lt;br&gt; To: ATLANTIC AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2027 - Q4 2027	Active	None	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4210127872498, 43.6394728683129], [-79.4205072940313, 43.6395829324299], [-79.4201913818353, 43.6396517204814], [-79.4201884569874, 43.6396515564146], [-79.4200008345386, 43.6396856350069]]}"
86	9064	 	2023-12-08	Laneway Reconstruction	[36.60 m N] DUNDAS ST W&lt;br&gt; From: BEATRICE ST&lt;br&gt; To: MONTROSE AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2025 - Q2 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4150964902151, 43.6509001329198], [-79.4155810547327, 43.6508007945212], [-79.4161380940756, 43.6506865902031]]}"
87	9121	 	2024-03-14	Local Road Reconstruction	GLENALLAN RD&lt;br&gt; From: MILDENHALL RD&lt;br&gt; To: DANESWOOD RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3842067678901, 43.7226071675237], [-79.3816147933836, 43.7231452424089]]}"
88	9205	TS2023-13-097	2024-04-16	Local Road Rehabilitation	SEATON ST&lt;br&gt; From: SHUTER ST&lt;br&gt; To: DUNDAS ST E 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Angela Au, Engineering and Construction Services	aau2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.36862064895, 43.6563200859519], [-79.3686234388019, 43.6564347933699], [-79.3688276628731, 43.6569945761227], [-79.3688343056921, 43.6570127934754], [-79.3688388176363, 43.6570251665069], [-79.3688460151363, 43.6570448688177], [-79.3689648016937, 43.6573329654098], [-79.3693147465043, 43.6581815495749], [-79.3693565848024, 43.6582829993802], [-79.3695116514794, 43.6586590313533]]}"
89	9340	1	2024-03-14	Local Road Reconstruction	ROTHMERE DR&lt;br&gt; From: BRAESIDE RD&lt;br&gt; To: MILDENHALL RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3902974312957, 43.7284420446276], [-79.390213770356, 43.7284405583093], [-79.3886777136323, 43.728769851871], [-79.3885095242891, 43.7288058162057], [-79.3883398209852, 43.728842129862], [-79.3881624285215, 43.728887391073], [-79.3879871415069, 43.7289490273205], [-79.3878278937659, 43.7290094017647], [-79.3868903087035, 43.7293062854974]]}"
90	9354	TS2023-11-008	2024-06-26	Local Road Reconstruction	ALBANY AVE&lt;br&gt; From: [E] BARTON AVE [BRANCH]&lt;br&gt; To: [W] BARTON AVE [BRANCH] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4110991128806, 43.6682373685789], [-79.411166032323, 43.6683707897451]]}"
91	9355	TS2023-12-009	2024-06-26	Local Road Rehabilitation	ARCHER RD&lt;br&gt; From: BROWSIDE AVE&lt;br&gt; To: SPADINA RD (TO) 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2024 - Q3 2024	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4150224212979, 43.696282978252], [-79.4157924473889, 43.696086726832]]}"
92	9382	 	2024-04-12	Major Road Rehabilitation	DUPONT ST&lt;br&gt; From: DAVENPORT RD&lt;br&gt; To: ST GEORGE ST (TO) 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q3 2027	Active	None	Transportation Services	Shahid Virk, Engineering and Construction Services	svirk@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4025942432102, 43.6758100166045], [-79.403600319043, 43.675594773861]]}"
93	9385	 	2024-07-23	Local Road Rehabilitation	BALMORAL AVE&lt;br&gt; From: POPLAR PLAINS RD&lt;br&gt; To: WARREN RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2026 - Q4 2026	Active	None	Transportation Services	Bill Dakogiannis, Engineering and Construction Services	bdakogi@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.403098067211, 43.6842575369334], [-79.4032636209406, 43.6842311764075], [-79.405550262297, 43.6837768780741]]}"
94	9390	1	2024-03-14	Local Road Reconstruction	"DAWLISH AVE&lt;br&gt; From: DANESWOOD RD
DANESWOOD RD
DANESWOOD RD&lt;br&gt; To: BAYVIEW AVE "	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3819177709487, 43.7241363723062], [-79.379706620262, 43.7246178780895]]}"
95	9392	TS2023-13-001	2024-06-27	Major Road Reconstruction	GERRARD ST E&lt;br&gt; From: TILBURN PL&lt;br&gt; To: RATHMORE AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2029 - Q2 2032	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Sarmad Al-Douri, Engineering and Construction Services	saldour@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2818026874289, 43.687936378166], [-79.2808034597103, 43.6881509458582]]}"
96	9420	TS2023-12-106	2024-06-26	Local Road Rehabilitation	WINONA DR&lt;br&gt; From: [9.80 m N] BARRIE AVE&lt;br&gt; To: WATFORD AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2024 - Q3 2024	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4328154522714, 43.68080804266], [-79.4328744682301, 43.6808395018142], [-79.4329150694203, 43.6808701661178], [-79.4329423451893, 43.6809084998102], [-79.4329795709501, 43.6809709889518], [-79.4332738158106, 43.681678512999]]}"
97	9518	1	2024-03-14	Local Road Reconstruction	CHELTENHAM AVE&lt;br&gt; From: ST IVES AVE&lt;br&gt; To: [20.30 m E] ST IVES AVE [CITY LIMITS] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Andrea Ramsay, Engineering and Construction Services	aramsay@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3900333542572, 43.7256097066243], [-79.3898172073568, 43.7256413727689], [-79.3896602410674, 43.7256736537257]]}"
98	9597	1	2024-03-14	Local Road Reconstruction	BAYVIEW WOOD&lt;br&gt; From: MILDENHALL RD&lt;br&gt; To: [65.97 m N/E] ST AUBYNS CRES [END] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Andrea Ramsay, Engineering and Construction Services	aramsay@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""MultiLineString"", ""coordinates"": [[[-79.3847640639245, 43.7267010748062], [-79.3841382049786, 43.7268618910575]], [[-79.3841382049786, 43.7268618910575], [-79.3840794665047, 43.7268630214664], [-79.3839893147196, 43.7268687745076], [-79.3838939607067, 43.7268817051827], [-79.3838133640315, 43.7269021479121], [-79.3837559793898, 43.7269149901435], [-79.3836793197926, 43.7269213318399], [-79.3833170326876, 43.7274539592486]], [[-79.386156918345, 43.7274497588323], [-79.3860389327796, 43.7274833788024], [-79.3860152486876, 43.7274898810845], [-79.3858896993449, 43.72752518559], [-79.3857917706978, 43.7275398966215], [-79.3856925966543, 43.7275632925187], [-79.3855810828837, 43.727581042103], [-79.3854543417122, 43.7275901801369], [-79.3853566302999, 43.7275819927627], [-79.3852439301143, 43.7275579480779], [-79.3851618871654, 43.7275282453043], [-79.3850870322546, 43.7274920958103], [-79.3850174167655, 43.7274487856517], [-79.384944739288, 43.7273905312121], [-79.3848806697512, 43.727329143063], [-79.3848242702101, 43.7272624437742], [-79.3847689025409, 43.7271943043986], [-79.3847220129178, 43.7271266686143], [-79.3846866620751, 43.7270744815767], [-79.384647924085, 43.7270338748043], [-79.3845997840372, 43.7269905590549], [-79.3845474860626, 43.726952989977], [-79.3844854175864, 43.7269236030293], [-79.3844204563041, 43.7269068958691], [-79.3843534179204, 43.7268930588659], [-79.3843136877089, 43.7268851254747], [-79.3842554768726, 43.7268765171669], [-79.384169956676, 43.7268620123502], [-79.3841499735354, 43.7268616599525], [-79.3841382049786, 43.7268618910575]]]}"
99	9624	TS2023-08-092	2024-06-26	Local Road Reconstruction	GILGORM RD&lt;br&gt; From: EGLINTON AVE W&lt;br&gt; To: NEW HAVEN DR 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4170933784138, 43.7027823201514], [-79.4172531182922, 43.7033540116248], [-79.4176274947683, 43.7048709403106], [-79.4179105080564, 43.7060097537411]]}"
100	9789	 	2024-03-14	Local Road Reconstruction	DANESWOOD RD&lt;br&gt; From: GLENALLAN RD&lt;br&gt; To: STRATHEDEN RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Andrea Ramsay, Engineering and Construction Services	aramsay@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3814786566566, 43.7222201386792], [-79.3814653395746, 43.7222627934801], [-79.3814612224624, 43.7223466484254], [-79.3814808432434, 43.7224708625707], [-79.3815234400595, 43.7226921096576], [-79.3815864354799, 43.7229965349621], [-79.3816147933836, 43.7231452424089]]}"
101	9826	 	2024-04-16	Local Road Rehabilitation	SEATON ST&lt;br&gt; From: DUNDAS ST E&lt;br&gt; To: GERRARD ST E 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Angela Au, Engineering and Construction Services	aau2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3695116514794, 43.6586590313533], [-79.3696886692824, 43.6590910440869], [-79.3701538980114, 43.6602263551023], [-79.3705442832578, 43.6611790599356], [-79.3707022026958, 43.6615644097245]]}"
102	9913	 	2024-06-28	Major Road Rehabilitation	WELLESLEY ST E&lt;br&gt; From: WELLESLEY PL&lt;br&gt; To: HOMEWOOD AVE (TO) 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2026 - Q4 2026	Active	None	Transportation Services	Rooban Markandu, Engineering and Construction Services	rmarkan2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3765008836219, 43.6664289195821], [-79.3763109983227, 43.6664296126124], [-79.3761593353147, 43.6664382661163], [-79.3760344105356, 43.6664551288314], [-79.3758529017376, 43.6664862708985]]}"
103	9995	 	2024-06-26	Local Road Reconstruction	NEW HAVEN DR&lt;br&gt; From: GILGORM RD&lt;br&gt; To: SPADINA RD (TO) 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4179105080564, 43.7060097537411], [-79.4189712733396, 43.7057989887973], [-79.4190593243893, 43.7057765488975], [-79.4190946428576, 43.705754070718], [-79.4191132729259, 43.7057405828928]]}"
104	10071	 	2023-10-11	Laneway Reconstruction	[42.70 m N] SULLIVAN ST&lt;br&gt; From: GRANGE PL&lt;br&gt; To: HURON ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3939210771515, 43.6521174434477], [-79.3955234764178, 43.6517727809425]]}"
105	10097	TS2023-13-001	2024-06-27	Major Road Reconstruction	GERRARD ST E&lt;br&gt; From: VICTORIA PARK AVE&lt;br&gt; To: TILBURN PL 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2029 - Q2 2032	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Sarmad Al-Douri, Engineering and Construction Services	saldour@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2865765831036, 43.6869049614758], [-79.2839718355978, 43.6874525755274], [-79.2828341306258, 43.6877148995327], [-79.2818026874289, 43.687936378166]]}"
106	10169	 	2025-04-12	Local Road Reconstruction	JIMMY WISDOM WAY&lt;br&gt; From: BELGRAVIA AVE&lt;br&gt; To: WHITMORE AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4479434087337, 43.6978400862883], [-79.4482622786283, 43.6985974849065]]}"
107	10262	 	2024-10-28	Laneway Reconstruction	[40.20 m S] INNES AVE&lt;br&gt; From: HABIBI LANE&lt;br&gt; To: [40.2 m N] NORMAN AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4566428105757, 43.6780566539711], [-79.4576392528267, 43.6804243690658]]}"
108	10263	TS2023-06_07-301	2024-06-21	Local Road Reconstruction	SENTINEL RD&lt;br&gt; From: STILECROFT DR&lt;br&gt; To: GRANDRAVINE DR 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2024 - Q4 2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4941939944994, 43.7504412017151], [-79.4942774937375, 43.750585732842], [-79.4943385959284, 43.7507088768396], [-79.4943879517114, 43.75080465567], [-79.4944753552535, 43.7509159003885], [-79.4946241992533, 43.7510625874774], [-79.4947527429424, 43.7511657778305], [-79.4948499703961, 43.7512267950997], [-79.4949186879399, 43.7512713919295], [-79.4950927175776, 43.7513727926704], [-79.4952344757438, 43.7514490226441], [-79.4956576797227, 43.7516805909094]]}"
109	10297	TS2024-10_11-027	2025-03-19	Major Road Rehabilitation	[E] UNIVERSITY AVE [BRANCH]&lt;br&gt; From: EDWARD ST&lt;br&gt; To: ELM ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2027 (Carry-Over)	Active	None	Transportation Services	Manveer Ramburrun, Engineering and Construction Services	mrambur@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3884527451187, 43.6555123732583], [-79.3885321775094, 43.6557022136473], [-79.3888195268601, 43.6563725711916]]}"
110	10337	 	2024-12-20	Local Road Rehabilitation	MERRILL AVE E&lt;br&gt; From: MOBERLY AVE&lt;br&gt; To: WOODBINE AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2027 - Q4 2028	Active	None	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3131251812728, 43.6831350216294], [-79.3123878319493, 43.6833013299465], [-79.3118424441681, 43.6834243536101]]}"
111	10351	 	2026-04-21	Laneway Reconstruction	[24.90 m E] HURON ST&lt;br&gt; From: [23.80 m N] DUNDAS ST W&lt;br&gt; To: [44.30 m N] DUNDAS ST W 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3958991824756, 43.6539042948101], [-79.3958250685226, 43.6537224602289]]}"
112	10353	None	2025-04-02	Major Road Reconstruction	Sheppard Ave E&lt;br&gt; From: BAYVIEW AVE&lt;br&gt; To: Clairtrell Road  	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2025 - 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Brian Nolan, Engineering and Construction Services	bnolan3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3900394839206, 43.7661347864044], [-79.388907478446, 43.7663738161413], [-79.3884435131222, 43.7664865630412], [-79.3881795404021, 43.7665531388294], [-79.3880562118249, 43.7665892748458]]}"
113	10380	 	2024-10-03	Local Road Rehabilitation	MONOGRAM PL&lt;br&gt; From: [329 m W] ISLINGTON AVE&lt;br&gt; To: [389 m W] ISLINGTON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	2026	Active	None	Transportation Services	&lt;Null&gt; Transportation Roads State of Good Repair	RoadSOGR@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5542971690567, 43.7039904367322], [-79.5549610701561, 43.703837696326]]}"
114	10425	 	2023-05-19	Local Road Reconstruction	HOPEWELL AVE&lt;br&gt; From: MARLEE AVE&lt;br&gt; To: TIMES RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2028 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4406106476053, 43.7010844340071], [-79.443447899153, 43.7004764339604], [-79.4452427008093, 43.7000898071295], [-79.4453636692644, 43.7000476715019], [-79.44544233942, 43.7000148165905], [-79.445502550132, 43.6999812246217], [-79.4456050737352, 43.6999383454378]]}"
115	10426	 	2023-09-11	Laneway Reconstruction	DOUGLAS CAMPBELL LANE&lt;br&gt; From: COLLEGE ST (TO)&lt;br&gt; To: [45.70 m N] COLLEGE ST (TO) 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4010554289409, 43.6578112833012], [-79.4012453655503, 43.6582724129034]]}"
116	10430	 1	2024-03-14	Local Road Reconstruction	CHELTENHAM AVE&lt;br&gt; From: ST IVES CRES&lt;br&gt; To: MILDENHALL RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Andrea Ramsay, Engineering and Construction Services	aramsay@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3896602410674, 43.7256736537257], [-79.3895327540185, 43.7257001292561], [-79.3892730757739, 43.7257582708495], [-79.3866603171166, 43.7263022392061], [-79.3857736626135, 43.7264958670832]]}"
117	10438	 	2024-08-14	Major Road Rehabilitation	GREENWOOD AVE&lt;br&gt; From: GLEBEHOLME BLVD&lt;br&gt; To: MILVERTON BLVD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Promil Sarkar, Engineering and Construction Services	psarkar@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3334189364099, 43.6839276597938], [-79.3337588108849, 43.6847137012434]]}"
118	10457	 	2023-10-31	Laneway Reconstruction	[30.20 m N] BADEN ST&lt;br&gt; From: [30.50 m W] OSSINGTON AVE&lt;br&gt; To: [67.10 m W] OSSINGTON AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4217053427412, 43.6503902470876], [-79.4221133490483, 43.6503136226759]]}"
119	10458	 	2024-01-17	Laneway Reconstruction	ALEXANDER PL&lt;br&gt; From: ALEXANDER ST&lt;br&gt; To: MAITLAND ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3794628415358, 43.6638277585622], [-79.3796143503058, 43.6641775689253], [-79.3798773197217, 43.6647847472791]]}"
120	10460	TS2023-13-001 	2024-04-25	Major Road Reconstruction	GERRARD ST E&lt;br&gt; From: BERKELEY ST&lt;br&gt; To: [N] GERRARD ST E [BRANCH] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2027 - Q3 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marilia Cimini, Engineering and Construction Services	mcimini@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3685391029701, 43.6620435108171], [-79.3681759581657, 43.6621129619358]]}"
121	10461	 	2024-04-05	Laneway Reconstruction	Reggae LN ([30 m S] EGLINTON AVE W)&lt;br&gt; From: [48 m W] ALAMEDA AVE&lt;br&gt; To: OAKWOOD AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2025 - Q3 2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Angela Au, Engineering and Construction Services	aau2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4426455658532, 43.6969425186823], [-79.4419622463682, 43.69709103167], [-79.4419478252956, 43.6970551722199], [-79.4407554354441, 43.6973174718272]]}"
122	10483	TS2023-20-173	2026-03-19	Local Road Reconstruction	PARKCREST DR&lt;br&gt; From: HILL CRES&lt;br&gt; To: 126 m S KINGSTON RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Gabor Szakter, Engineering and Construction Services	gszakte@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2160018111796, 43.7326164714789], [-79.2163601447073, 43.7334635133611], [-79.2168030130416, 43.7344996613504], [-79.2168560133695, 43.7346168004549], [-79.2168920696714, 43.7347068956969], [-79.2169281959793, 43.7347789895541], [-79.2169760113981, 43.7348421120208], [-79.2170331385244, 43.7349052575197], [-79.2170709850669, 43.7349413623993], [-79.2171204895772, 43.7349774772163], [-79.2171629914554, 43.735013583685], [-79.2172542159454, 43.7350858128629], [-79.2173153276073, 43.7351219653079], [-79.2174346218274, 43.7351672591917], [-79.2175228666099, 43.7352124780208], [-79.2176344434893, 43.735248761302], [-79.2177204380888, 43.7352759638739], [-79.2178103182339, 43.7353031939763], [-79.2178677350827, 43.7353033231135], [-79.2179391175277, 43.7353034965873], [-79.2180096346661, 43.7353216694256], [-79.2180972756157, 43.7353308832327], [-79.2181763745795, 43.7353400759115], [-79.2182368948968, 43.7353402224167], [-79.2183215155728, 43.7353314261625], [-79.2184014685945, 43.7353226183462], [-79.2185365579262, 43.7353049423375], [-79.2186973301611, 43.7352693260355], [-79.2188441885773, 43.7352246839619], [-79.2189389312257, 43.7352069010244], [-79.2190492752979, 43.7351711620143]]}"
123	10716	 	2024-08-14	Major Road Rehabilitation	GREENWOOD AVE&lt;br&gt; From: [34.60 m N] MILVERTON BLVD&lt;br&gt; To: SPRINGDALE BLVD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Promil Sarkar, Engineering and Construction Services	psarkar@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3339042258784, 43.6850841471032], [-79.3340637582019, 43.6854622211506]]}"
124	10766	TS2024-02-033	2026-01-14	Major Road Reconstruction	RATHBURN RD&lt;br&gt; From: ELMCREST RD&lt;br&gt; To: MILL RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Brian Nolan, Engineering and Construction Services	bnolan3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5868317826081, 43.6475271143042], [-79.5874367656735, 43.6471609078845], [-79.5874991567889, 43.6471217186069], [-79.5894788287718, 43.6458786051533], [-79.5900293986254, 43.6455330874282], [-79.5900630207061, 43.6455117727079]]}"
125	10913	 	2025-09-10	Local Road Rehabilitation	WINONA DR&lt;br&gt; From: LANARK AVE&lt;br&gt; To: EGLINTON AVE W 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2025	Active	None	Transportation Services	Cherry Chen, Engineering and Construction Services	cchen9@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.438721019606, 43.6972723920108], [-79.4388960372676, 43.6977113929368], [-79.439054621064, 43.6981091760147]]}"
126	10922	TS2023-10_11-435	2025-09-05	Local Road Reconstruction	AUGUSTA AVE&lt;br&gt; From: BALDWIN ST&lt;br&gt; To: NASSAU ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4020351684402, 43.6545084150705], [-79.4023360050878, 43.6552350592144]]}"
127	10998	 	2023-05-19	Local Road Reconstruction	AMHERST AVE&lt;br&gt; From: WESTMOUNT AVE&lt;br&gt; To: NORTHCLIFFE BLVD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2028 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.44575001914, 43.6904886833956], [-79.4468253424522, 43.6902652579895]]}"
128	11100	 	2026-03-19	Local Road Reconstruction	RIDELLE AVE&lt;br&gt; From: MARWOOD RD&lt;br&gt; To: FERNWOOD RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4352586953962, 43.7053528781632], [-79.4364077172101, 43.705102179694]]}"
129	11180	 	2026-04-21	Laneway Reconstruction	[46.30 m N] DUNDAS ST W&lt;br&gt; From: [42.70 m W] BEVERLEY ST&lt;br&gt; To: [95.40 m E] HURON ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3945509542036, 43.6541713678773], [-79.3958991824756, 43.6539042948101]]}"
130	11359	TS2023-06_07-301	2024-06-21	Local Road Reconstruction	SENTINEL RD&lt;br&gt; From: SHEPPARD AVE W&lt;br&gt; To: STILECROFT DR 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2024 - Q4 2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.491850160701, 43.7436491508556], [-79.4919846606537, 43.743976244666], [-79.4919899356773, 43.7439890798659], [-79.4922405714424, 43.7445986151828], [-79.4922802047785, 43.7447025593652], [-79.4923030039636, 43.7448018865781], [-79.4923257895678, 43.7449012038824], [-79.4923445000958, 43.745041069566], [-79.4923770516071, 43.7452049784027], [-79.4924007053594, 43.7453240353992], [-79.4924013381764, 43.7453272398725], [-79.4925168784975, 43.7459087527128], [-79.4925853268331, 43.7469846537346], [-79.4926105768131, 43.7470666284757], [-79.4926272726266, 43.7471324985966], [-79.4926568540871, 43.7472207024407], [-79.4932497435437, 43.7486062831026], [-79.4936034952622, 43.7493576277629], [-79.4938019613215, 43.7497105660265], [-79.4941939944994, 43.7504412017151]]}"
131	11393	 	2025-10-14	Local Road Reconstruction	HIGHLAND AVE&lt;br&gt; From: [45.70 m E] HIGHLAND GDNS&lt;br&gt; To: [289.60 m E] HIGHLAND GDNS 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3810608091521, 43.6824335694948], [-79.3809993074092, 43.6824251585712], [-79.3809520772989, 43.682410819814], [-79.3808891159895, 43.6823859853215], [-79.3808051827283, 43.68234588701], [-79.3807435545494, 43.6823105763025], [-79.3806727596541, 43.682263823429], [-79.3805901616246, 43.682212295589], [-79.3805023311883, 43.6821512352325], [-79.3804302616098, 43.6820863819406], [-79.3803713069641, 43.6820272572603], [-79.3803293918988, 43.681980535292], [-79.3802704185115, 43.6819309366259], [-79.3802101001075, 43.681898483116], [-79.3801471409532, 43.6818717426375], [-79.3800343088847, 43.6818420927786], [-79.3799621097891, 43.6818420160843], [-79.3798544634212, 43.6818447600091], [-79.3797704257373, 43.6818570538532], [-79.379539493169, 43.6819026012952], [-79.379299128058, 43.6819516992292], [-79.3792281882877, 43.6819606247115], [-79.379169666216, 43.6819560613108], [-79.3791022510116, 43.6819379874093], [-79.3790430635348, 43.6819220095784], [-79.3789866851057, 43.6818876549146], [-79.3789395434463, 43.6818285419992], [-79.3788936981127, 43.6817780023853], [-79.3788412707095, 43.6817360286247], [-79.3787743724755, 43.6817102346528], [-79.3786654307819, 43.6817034463966], [-79.3785435145386, 43.6817156190147]]}"
132	11399	 	2024-03-14	Local Road Reconstruction	STRATHEDEN RD&lt;br&gt; From: MILDENHALL RD&lt;br&gt; To: DANESWOOD RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Andrea Ramsay, Engineering and Construction Services	aramsay@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3838624792093, 43.721721433073], [-79.3814786566566, 43.7222201386792]]}"
133	11490	 	2024-03-14	Local Road Reconstruction	[N-S] BRAESIDE RD [BRANCH]&lt;br&gt; From: BRAESIDE RD&lt;br&gt; To: HASLEMERE RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3913186997697, 43.7307197107964], [-79.3912737441587, 43.7307137020249], [-79.3912370645812, 43.7306787684459], [-79.3911855115988, 43.7306171401397], [-79.3911451638329, 43.7305240784712], [-79.3908941022949, 43.7299304336252]]}"
134	11615	TS2023-11-436	2025-09-05	Local Road Reconstruction	BALDWIN ST&lt;br&gt; From: SPADINA AVE&lt;br&gt; To: [98 m W] SPADINA AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3989262173483, 43.6551380274871], [-79.4002782277325, 43.6548582970667]]}"
135	11620	1	2026-03-11	Local Road Reconstruction	BRAESIDE CRES&lt;br&gt; From: BRAESIDE RD&lt;br&gt; To: [1 m E] BRAESIDE RD [CITY LIMITS] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3905438757911, 43.7291351132711], [-79.3904295275255, 43.729155812771]]}"
136	11674	TS2023-04-113	2025-04-12	Laneway Reconstruction	[36.60 m W] FORT ROUILLE ST&lt;br&gt; From: [54.90 m S] SPRINGHURST AVE&lt;br&gt; To: SPRINGHURST AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4274709502319, 43.6345420008847], [-79.4272707358038, 43.6339712748967]]}"
137	11678	 	2024-03-14	Local Road Reconstruction	MILDENHALL RD&lt;br&gt; From: ROTHMERE DR&lt;br&gt; To: [2 m E] BRAESIDE RD [CITY LIMITS] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3868903087035, 43.7293062854974], [-79.3869392556659, 43.7294154297994], [-79.3870203107194, 43.7295413130125], [-79.3870840585627, 43.7296157955182], [-79.3871593850583, 43.7296864458912], [-79.3872427180014, 43.7297564641244], [-79.3873304144408, 43.7298098424138], [-79.3874222565454, 43.7298574747298], [-79.3875189441001, 43.7298895657074], [-79.3876311150474, 43.729900075163], [-79.3877481437263, 43.7298950252441], [-79.3878991261169, 43.7298690068292], [-79.3880418559178, 43.7298545026125], [-79.388197007331, 43.7298419645363], [-79.3883486150172, 43.7298326452301], [-79.3884742830484, 43.7298208250764], [-79.3886143022664, 43.7298153466387], [-79.3887377556083, 43.7298136585276], [-79.3889231083606, 43.7298220938335], [-79.3891848599272, 43.7298596418166], [-79.38950740977, 43.7299123808643], [-79.389791667429, 43.7299570160804], [-79.3899509816379, 43.7300036816581], [-79.3901011902939, 43.7300331819058], [-79.3902320183964, 43.7300370341305], [-79.3903657763575, 43.7300209422797], [-79.3904700384731, 43.7300055862166], [-79.3905581358335, 43.7299987126477], [-79.3906478729751, 43.7299911294821]]}"
138	11694	 	2026-02-11	Local Road Reconstruction	QUEEN ELIZABETH BLVD&lt;br&gt; From: ROYAL YORK RD&lt;br&gt; To: CANMOTOR AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2026 - Q3 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Nicholas Mah, Engineering and Construction Services	nmah@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5024114897152, 43.62332421573], [-79.50238831985, 43.623231465748], [-79.5023765482619, 43.6231957871272], [-79.5023476768618, 43.6230885242889], [-79.502391564286, 43.6230560292091], [-79.5024931686164, 43.6230238542183], [-79.5059383076482, 43.6222961012901], [-79.5086603410743, 43.6217266767635], [-79.5104959110868, 43.6213926562924], [-79.5115732591841, 43.6211650507351], [-79.5117278712598, 43.6211414440896], [-79.5120476160102, 43.6211074512303], [-79.512187063814, 43.6211063553806], [-79.5122988421262, 43.621098267347], [-79.5125856955201, 43.6211110406292], [-79.5126262010587, 43.6211211699473], [-79.5127254676382, 43.6211613169201], [-79.5127903514855, 43.6212174982648], [-79.5128860912137, 43.6213816974857], [-79.5129525632846, 43.6215272517268], [-79.5129642841548, 43.6217029542579], [-79.5129053071663, 43.6218943803404], [-79.5128157886533, 43.6220136095358], [-79.5126016104699, 43.6222467337542], [-79.5125470483571, 43.6223629839086], [-79.5125368398686, 43.6224478349775], [-79.5125415420439, 43.6225485079798], [-79.5125764302078, 43.6226699961131], [-79.5127198820854, 43.6230366155614], [-79.5127314291368, 43.623095064896], [-79.5127345171743, 43.6231841361487], [-79.5127067126589, 43.6232585304477], [-79.5126600556551, 43.6232997503533], [-79.5126288101257, 43.6233273233097], [-79.5125609765848, 43.6233615613223], [-79.5124218206509, 43.6234032863331], [-79.5123754563584, 43.6234171796277], [-79.511436969647, 43.6236306790489]]}"
139	11713	 	2023-05-19	Local Road Reconstruction	GIBSON ST&lt;br&gt; From: DUFFERIN ST&lt;br&gt; To: WESTMOUNT AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2028 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4470016686532, 43.6905738251561], [-79.447061790115, 43.6905918916155], [-79.4471245131365, 43.6905842794449], [-79.4471920812408, 43.6905684422923], [-79.4480879069253, 43.6903913695446]]}"
140	11730	 	2023-03-24	Major Road Reconstruction	BLOOR ST W&lt;br&gt; From: ST GEORGE ST (TO)&lt;br&gt; To: HURON ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2023 - Q2 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Ahmed Bhabha, Engineering and Construction Services	abhabha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2023	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3998364722679, 43.6675168783568], [-79.4015389542218, 43.6671618641117]]}"
141	11806	 	2025-10-14	Local Road Reconstruction	[S] HIGHLAND AVE [BRANCH]&lt;br&gt; From: HIGHLAND GDNS&lt;br&gt; To: [45.70 m E] HIGHLAND GDNS 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3815816319326, 43.6824393660884], [-79.3814447258037, 43.6824678015376], [-79.3813885925331, 43.6824748876452], [-79.3813334539154, 43.6824769736302], [-79.3812753746204, 43.6824733407027], [-79.3812202555661, 43.682466138202], [-79.38114841278, 43.6824510592442], [-79.3810608091521, 43.6824335694948]]}"
142	11827	TS2023-14-293	2023-09-25	Laneway Reconstruction	[26.20 m E] LOGAN AVE&lt;br&gt; From: LANGLEY AVE&lt;br&gt; To: RIVERDALE AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2025 - Q3 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.345680498002, 43.6694958180803], [-79.3458495631847, 43.6699107707319], [-79.3460254936088, 43.6703425450318]]}"
143	11867	 	2025-04-12	Local Road Reconstruction	JIMMY WISDOM WAY&lt;br&gt; From: EGLINTON AVE W&lt;br&gt; To: LIVINGSTONE AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.447332887316, 43.6963589175388], [-79.4476356665481, 43.6971054479328]]}"
144	11879	 	2024-04-12	Major Road Rehabilitation	DUPONT ST&lt;br&gt; From: MADISON AVE&lt;br&gt; To: [21.30 m E] SPADINA RD (TO) 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q3 2027	Active	None	Transportation Services	Shahid Virk, Engineering and Construction Services	svirk@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4059769635791, 43.6751085658455], [-79.4068632086908, 43.6749142174177]]}"
145	11883	"TS2023-08-169
"	2024-04-25	Local Road Reconstruction	ELM RIDGE DR&lt;br&gt; From: [W] WILLIAM R ALLEN RD [BRIDGE]&lt;br&gt; To: [163.50 m] ROSELAWN AVE [CITY LIMITS] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2025 - 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adel Roufail, Engineering and Construction Services	aroufai@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4378387212772, 43.7029345485977], [-79.438994439253, 43.7026791478934]]}"
146	11892	 	2025-04-12	Laneway Reconstruction	[30.50 m N] QUEEN ST W&lt;br&gt; From: DOVERCOURT RD&lt;br&gt; To: LISGAR ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.422546740236, 43.6438386322858], [-79.4231276282313, 43.6437226564523], [-79.42375343732, 43.6435962462406]]}"
147	11913	1	2024-03-14	Local Road Reconstruction	BUCKINGHAM AVE&lt;br&gt; From: ST IVES AVE&lt;br&gt; To: [32.60 m] ST IVES AVE [CITY LIMITS] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Andrea Ramsay, Engineering and Construction Services	aramsay@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3904034038827, 43.7265557747091], [-79.3901317578124, 43.7266286111942], [-79.3898757853593, 43.726695999282]]}"
148	11914	 	2024-03-14	Local Road Reconstruction	WANLESS CRES&lt;br&gt; From: ST IVES AVE&lt;br&gt; To: [E] BUCKINGHAM AVE [CITY LIMITS] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3904034038827, 43.7265557747091], [-79.3903233027828, 43.7265842939174], [-79.3902424601504, 43.7266116971037], [-79.3901487546399, 43.7266540290297], [-79.3900433447988, 43.7267028305125], [-79.3899831097828, 43.726735096004], [-79.3899295542119, 43.7267657566741], [-79.3898944124013, 43.7267875139293], [-79.3898762535612, 43.726800197185], [-79.3898692280134, 43.7268063967709]]}"
149	11946	 	2022-08-29	Laneway Reconstruction	[30.50 m N] WALLACE AVE&lt;br&gt; From: [33.50 m E] EMERSON AVE&lt;br&gt; To: EMERSON AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4425523348517, 43.6631192100523], [-79.4419968763231, 43.6632356139409]]}"
150	11991	 	2023-02-13	Laneway Reconstruction	[33.50 m W] YONGE ST&lt;br&gt; From: WELLINGTON ST W&lt;br&gt; To: MELINDA ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3778722643263, 43.6477124723191], [-79.3781701427466, 43.6484220499392]]}"
151	12002	 	2025-10-30	Local Road Reconstruction	CLIFTON RD&lt;br&gt; From: GLENROSE AVE&lt;br&gt; To: ST CLAIR AVE E (TO) 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Hazel Breton, Engineering and Construction Services	hbreton@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3839793704392, 43.6892205433723], [-79.3843590690759, 43.6901390533539]]}"
152	12015	 	2025-10-31	Laneway Reconstruction	[36 m W] HOPEDALE AVE&lt;br&gt; From: [81 m N] O&apos;CONNOR DR&lt;br&gt; To: [171 m N] O&apos;CONNOR DR 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3531025231468, 43.6935649128476], [-79.3536153141476, 43.6942004911605]]}"
153	12093	 	2023-03-24	Major Road Reconstruction	BLOOR ST W&lt;br&gt; From: BEDFORD RD&lt;br&gt; To: DEVONSHIRE PL 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2023 - Q2 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Ahmed Bhabha, Engineering and Construction Services	abhabha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2023	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3973807881437, 43.6680332274401], [-79.3983645805034, 43.667831627684]]}"
154	12130	TS2023-11-447	2024-06-28	Local Road Reconstruction	RAMSDEN PARK RD&lt;br&gt; From: YONGE ST&lt;br&gt; To: [126 m W] YONGE ST [END] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.389572829349, 43.6770385952618], [-79.3900593468608, 43.6769302976837], [-79.3911833618606, 43.6766801085893]]}"
155	12137	 	2025-10-31	Laneway Reconstruction	[40 m S] ST CLAIR AVE W&lt;br&gt; From: [39 m E] LANSDOWNE AVE (TO)&lt;br&gt; To: LANSDOWNE AVE (TO) 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4503959602035, 43.6758632648315], [-79.4499284342664, 43.6759758574483]]}"
156	12332	 	2024-12-12	Laneway Reconstruction	LEADER LANE&lt;br&gt; From: WELLINGTON ST E&lt;br&gt; To: COLBORNE ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3751775496455, 43.6483447528471], [-79.3753269587146, 43.6486930796184], [-79.3754504316776, 43.6489765510062]]}"
157	12383	 	2024-04-12	Major Road Rehabilitation	DUPONT ST&lt;br&gt; From: HURON ST&lt;br&gt; To: MADISON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q3 2027	Active	None	Transportation Services	Shahid Virk, Engineering and Construction Services	svirk@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4047887916673, 43.6753576543882], [-79.4059769635791, 43.6751085658455]]}"
158	12402	 	2024-08-14	Major Road Rehabilitation	GREENWOOD AVE&lt;br&gt; From: MILVERTON BLVD&lt;br&gt; To: [34.60 m N] MILVERTON BLVD [CITY LIMITS] 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Promil Sarkar, Engineering and Construction Services	psarkar@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3337588108849, 43.6847137012434], [-79.3339042258784, 43.6850841471032]]}"
159	12467	 	2021-04-12	Laneway Reconstruction	NICHOLSON LANE&lt;br&gt; From: PRINCESS ST&lt;br&gt; To: BERKELEY ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.363853361954, 43.6508503853498], [-79.3665079581504, 43.6502499569073]]}"
160	12504	TS2023-13-001	2024-04-25	Major Road Reconstruction	GERRARD ST E&lt;br&gt; From: SHERBOURNE ST&lt;br&gt; To: CENTRAL HOSPITAL LANE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2027 - Q3 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marilia Cimini, Engineering and Construction Services	mcimini@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3722361254016, 43.6612269152213], [-79.3714388008979, 43.6614023360052]]}"
161	12534	1	2024-03-14	Local Road Reconstruction	DAWLISH AVE&lt;br&gt; From: FIDELIA AVE&lt;br&gt; To: DANESWOOD RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3873757562745, 43.7229736520902], [-79.3870839377461, 43.7230690240233], [-79.386596054027, 43.7231698176319], [-79.3846013974838, 43.7235922398659], [-79.3819177709487, 43.7241363723062]]}"
162	12548	 	2022-02-22	Local Road Rehabilitation	DOROTHY ST&lt;br&gt; From: HILTZ AVE&lt;br&gt; To: GREENWOOD AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2025	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.326923741667, 43.665894202187], [-79.3260210547978, 43.6660953799296]]}"
163	12581	 	2024-04-10	Major Road Reconstruction	STEELES AVE E&lt;br&gt; From: BRIMLEY RD&lt;br&gt; To: MIDLAND AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q4 2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Brian Nolan, Engineering and Construction Services	bnolan3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2973325250841, 43.8259504750552], [-79.2965905096487, 43.8261287202774], [-79.2965858186382, 43.8261298460644], [-79.2959933857037, 43.826272150295], [-79.2954561631618, 43.8263959252406], [-79.2941324768324, 43.8267008885968], [-79.2939728335849, 43.8267377861768], [-79.2931126512135, 43.826936523393], [-79.2917460839233, 43.8272522790495], [-79.2913492036578, 43.8273439593373], [-79.2894795688682, 43.8277725977523], [-79.2875393354156, 43.828201042818], [-79.287202145524, 43.8282949348903]]}"
164	12602	 	2024-01-04	Local Road Reconstruction	[N-S] HILLSIDE DR [LEG]&lt;br&gt; From: GAMBLE AVE&lt;br&gt; To: [85 m S] GAMBLE AVE [END] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2019 - Q3 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3562022750222, 43.6884311460419], [-79.3561617189354, 43.6885266411123], [-79.3561387779063, 43.6886482252004], [-79.3561387539168, 43.6887106815864], [-79.3561366142216, 43.6887916149763], [-79.356143979534, 43.6889028749024], [-79.3561610067079, 43.688978331716], [-79.3561978341166, 43.6891046239681]]}"
165	12639	 	2025-09-10	Local Road Rehabilitation	WINONA DR&lt;br&gt; From: BELVIDERE AVE&lt;br&gt; To: BUDE ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2025	Active	None	Transportation Services	Cherry Chen, Engineering and Construction Services	cchen9@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4372030869412, 43.6935452718115], [-79.4377070698746, 43.6947908537938]]}"
166	12683	TS2023-11-283	2024-06-26	Local Road Rehabilitation	YARMOUTH GDNS&lt;br&gt; From: PALMERSTON AVE&lt;br&gt; To: MANNING AVE (TO) 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2024 - Q3 2024	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4161150546134, 43.6709813156484], [-79.4166836084404, 43.6708603089348], [-79.4183959867239, 43.6704958895007], [-79.4184777760067, 43.6704826645972], [-79.4184924300699, 43.6704852863324]]}"
167	12693	 	2024-04-05	Local Road Rehabilitation	EUCLID AVE (TO)&lt;br&gt; From: ROBINSON ST&lt;br&gt; To: DUNDAS ST W 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Angela Au, Engineering and Construction Services	aau2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4083232928497, 43.648086892589], [-79.4083917325098, 43.6482331071066], [-79.409208592822, 43.6502714737392], [-79.4093284605902, 43.650570899226], [-79.4097223439915, 43.6515546833211]]}"
168	12725	 	2024-06-26	Laneway Reconstruction	[30.50 m E] JONES AVE&lt;br&gt; From: [23.20 m N] QUEEN ST E&lt;br&gt; To: [115.10 m N] QUEEN ST E 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2023 - Q4 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2023	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3324316859436, 43.6631086314602], [-79.3327373082778, 43.6638731162871]]}"
169	12732	TS2023-13-001	2024-04-25	Major Road Reconstruction	GERRARD ST E&lt;br&gt; From: SEATON ST&lt;br&gt; To: ONTARIO ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2027 - Q3 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marilia Cimini, Engineering and Construction Services	mcimini@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3707022026958, 43.6615644097245], [-79.3697172755116, 43.6617810438202]]}"
170	12733	 	2025-10-31	Local Road Rehabilitation	WALES AVE&lt;br&gt; From: BELLEVUE AVE&lt;br&gt; To: LEONARD AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2027 - Q4 2028	Active	None	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4029094143391, 43.6530886876627], [-79.403221472379, 43.6530196310293], [-79.4033423418426, 43.6529970309717], [-79.4042150473904, 43.652833895848]]}"
171	12821	TS2024-02-033	2026-01-14	Major Road Reconstruction	RATHBURN RD&lt;br&gt; From: MILL RD&lt;br&gt; To: DEAD END 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Brian Nolan, Engineering and Construction Services	bnolan3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5900630207061, 43.6455117727079], [-79.5902383845055, 43.6453794556182], [-79.5904179293046, 43.6452501306051], [-79.5906015585175, 43.6451238634358], [-79.5907616675944, 43.6449710813087], [-79.5909144107884, 43.6448143739136], [-79.5910596086761, 43.6446539277507], [-79.5911205140883, 43.6445945610926], [-79.5911747444221, 43.6445318737193], [-79.5912219606568, 43.6444662619708], [-79.5912618647072, 43.6443981392568]]}"
172	12827	TS2023-13-049	2024-04-25	Local Road Rehabilitation	ST PAUL ST&lt;br&gt; From: RAY LANE&lt;br&gt; To: QUEEN ST E 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2024 - Q4 2025 (Carry-Over)	Active	None	Transportation Services	Javier Saborio, Engineering and Construction Services	jsabori@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.360355685286, 43.6560617016883], [-79.3603641264084, 43.6560838463216], [-79.3605137833925, 43.6564794961722]]}"
173	12896	 	2025-10-31	Laneway Reconstruction	[36.60 m N] QUEEN ST W&lt;br&gt; From: MACDONELL AVE&lt;br&gt; To: FULLER AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4380817460055, 43.6407411385031], [-79.4386550799761, 43.6406342394106], [-79.4392718356435, 43.6405192070685]]}"
174	12929	 	2025-09-10	Local Road Rehabilitation	WINONA DR&lt;br&gt; From: BUDE ST&lt;br&gt; To: AVA RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2025	Active	None	Transportation Services	Cherry Chen, Engineering and Construction Services	cchen9@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4377070698746, 43.6947908537938], [-79.4378210729329, 43.6951081285457]]}"
175	13025	TS2023-11-436	2025-09-05	Local Road Reconstruction	BALDWIN ST&lt;br&gt; From: [98 m W] SPADINA AVE&lt;br&gt; To: KENSINGTON AVE (TO) 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4002782277325, 43.6548582970667], [-79.4007089226048, 43.6547691715106]]}"
176	13037	 	2025-12-03	Laneway Reconstruction	FITZROY TER&lt;br&gt; From: KENSINGTON AVE (TO)&lt;br&gt; To: [50 m W] KENSINGTON AVE (TO) 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4001992199015, 43.6534389269145], [-79.4007953113884, 43.6533083689239]]}"
177	13083	TS2023-13-001	2024-04-25	Major Road Reconstruction	GERRARD ST E&lt;br&gt; From: [N] GERRARD ST E [BRANCH]&lt;br&gt; To: PARLIAMENT ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2027 - Q3 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marilia Cimini, Engineering and Construction Services	mcimini@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3681759581657, 43.6621129619358], [-79.3670355355869, 43.6619503721934]]}"
178	13121	TS2023-13-044	2025-03-24	Local Road Reconstruction	SACKVILLE PL&lt;br&gt; From: BOWMAN ST&lt;br&gt; To: RAWLINGS AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2025 - Q3 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3641587769398, 43.6660933151395], [-79.3635261310259, 43.6662363354209]]}"
179	13139	TS2023-11-101	2025-09-05	Local Road Reconstruction	KENSINGTON AVE (TO)&lt;br&gt; From: DUNDAS ST W&lt;br&gt; To: FITZROY TER 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3998708217879, 43.6525513319222], [-79.400183198789, 43.6533979036494], [-79.4001992199015, 43.6534389269145]]}"
180	13297	 	2025-10-14	Local Road Reconstruction	ST LEONARDS AVE&lt;br&gt; From: CITY LIMIT&lt;br&gt; To: [155 m W] MILDENHALL RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Rachele Joseph, Engineering and Construction Services	rgjoseph@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3892506899957, 43.7236794705968], [-79.3887718742843, 43.7237594020805], [-79.3868376928893, 43.7241643255961]]}"
181	13321	 	2025-10-14	Local Road Rehabilitation	CARLTON ST&lt;br&gt; From: BOWMAN ST&lt;br&gt; To: RAWLINGS AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3638396631037, 43.6654072533266], [-79.3632393117332, 43.6655390894353]]}"
182	13352	TS2023-11-008	2024-06-26	Local Road Reconstruction	ALBANY AVE&lt;br&gt; From: [W] BARTON AVE [BRANCH]&lt;br&gt; To: WELLS ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.411166032323, 43.6683707897451], [-79.4114268214077, 43.6690129328934], [-79.4115134966097, 43.6692330780659], [-79.4119663434579, 43.6703831730007]]}"
183	13373	 	2024-06-26	Laneway Reconstruction	POULTER&apos;S LANE&lt;br&gt; From: MARKHAM ST&lt;br&gt; To: [55.50 m E] MARKHAM ST [CUL-DE-SAC] 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4120663249703, 43.6654395909042], [-79.4120217141538, 43.6654883987337], [-79.412074331673, 43.6656059291664]]}"
184	13375	 	2025-10-14	Local Road Rehabilitation	REGENT ST&lt;br&gt; From: ST BARTHOLOMEW ST&lt;br&gt; To: DUNDAS ST E 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2026	Active	None	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3642448102343, 43.6591221633683], [-79.3644998900192, 43.6597622879658]]}"
185	13376	 	2025-10-14	Local Road Reconstruction	HIGHLAND AVE&lt;br&gt; From: [289.60 m E] HIGHLAND GDNS&lt;br&gt; To: ROXBOROUGH DR 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3785435145386, 43.6817156190147], [-79.3776022649132, 43.6819003219836], [-79.3775600098701, 43.6819047764862], [-79.3771063502459, 43.6819898012094]]}"
186	13379	 	2023-05-19	Local Road Reconstruction	HOPEWELL AVE&lt;br&gt; From: Jimmy Wisdom Way&lt;br&gt; To: DUFFERIN ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2028 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4485519869181, 43.6993205079126], [-79.4500749112898, 43.6990174879929], [-79.4502373179003, 43.6989758468592], [-79.4503977112861, 43.6989214588022], [-79.4505394784797, 43.6988579801655], [-79.4506672668563, 43.6988203380082], [-79.4509256579014, 43.6987636331241], [-79.451305430912, 43.6986934775011]]}"
187	13387	 	2025-09-10	Local Road Rehabilitation	WINONA DR&lt;br&gt; From: AVA RD&lt;br&gt; To: CLOVELLY AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2025	Active	None	Transportation Services	Cherry Chen, Engineering and Construction Services	cchen9@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4378210729329, 43.6951081285457], [-79.4380315034335, 43.6956078171111]]}"
188	13393	TS2023-11-241	2024-06-26	Laneway Reconstruction	[36.60 m N] BLOOR ST W&lt;br&gt; From: [35.10 m E] MARKHAM ST&lt;br&gt; To: MARKHAM ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4125770149826, 43.6653093092945], [-79.4121105824931, 43.6654042658881], [-79.4120663249703, 43.6654395909042]]}"
189	13450	 	2025-07-18	Local Road Rehabilitation	HAZEL AVE&lt;br&gt; From: FERNWOOD PARK AVE&lt;br&gt; To: BEECH AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2026 - Q2 2027	Active	None	Transportation Services	Tony Rodrigues, Engineering and Construction Services	trodrig@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2884618650676, 43.6714813993987], [-79.2879610380909, 43.6716000288966], [-79.2872199936983, 43.6717511235502]]}"
190	13587	 	2025-10-31	Laneway Reconstruction	[79 m N] O&apos;CONNOR DR&lt;br&gt; From: HOPEDALE AVE&lt;br&gt; To: [35 m W] HOPEDALE AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3525191549885, 43.6936711609227], [-79.3531025231468, 43.6935649128476]]}"
191	13610	 	2025-10-31	Laneway Reconstruction	[33.50 m W] DUFFERIN ST&lt;br&gt; From: WALLACE AVE&lt;br&gt; To: ARMSTRONG AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4375930489412, 43.6637435697705], [-79.4377521981833, 43.664152275056], [-79.4379324075646, 43.6646151687842]]}"
192	15171	 	2026-04-21	Laneway Reconstruction	[31 m E] EILEEN AVE&lt;br&gt; From: [39 m N] FLORENCE AVE&lt;br&gt; To: [70 m N] FLORENCE AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4946385510168, 43.6699354210539], [-79.4949789913813, 43.6700994974601]]}"
193	15302	TS2023-11-101	2025-09-05	Local Road Reconstruction	KENSINGTON AVE (TO)&lt;br&gt; From: FITZROY TER&lt;br&gt; To: KENSINGTON PL 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4001992199015, 43.6534389269145], [-79.400279997395, 43.6536457378437], [-79.4003105474089, 43.6537239574635], [-79.4003885376535, 43.6539374358791]]}"
194	15317	 	2021-07-30	Laneway Rehabilitation	[43.30 m N] TYRREL AVE&lt;br&gt; From: CHRISTIE ST&lt;br&gt; To: [29.60 m E] RUSHTON RD 	Replacement of partial or entire laneway pavement structure for either partial or full laneway width. This could include the asphalt, concrete and underlying support materials. Repair, improvement or replacement of laneway drainage, curbs and associated areas. Work may include the closure of individual lanes or the entire laneway.	Q4 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4244727718885, 43.6786923885046], [-79.424953126144, 43.678584698081], [-79.4250050082343, 43.6785424259437], [-79.4255867536006, 43.678411215879]]}"
195	15320	 	2021-07-12	Local Road Rehabilitation	CARLING AVE&lt;br&gt; From: IRENE AVE&lt;br&gt; To: LEEDS ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2024 - Q2 2025 (Carry-Over)	Active	None	Transportation Services	Dennis Coronel, Engineering and Construction Services	dcorone@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4248969649302, 43.6628446316204], [-79.4252099904837, 43.6636456591171], [-79.4254609709207, 43.6643217516281]]}"
196	15472	 	2023-02-13	Laneway Reconstruction	[27.40 m W] DUNCAN ST&lt;br&gt; From: [25 m N] ADELAIDE ST W&lt;br&gt; To: NELSON ST (TO) 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3892446711243, 43.6484187445784], [-79.389371363459, 43.6487226740694]]}"
197	15486	TS2023-09-011	2023-02-13	Local Road Rehabilitation	ASCOT AVE&lt;br&gt; From: EARLSCOURT AVE&lt;br&gt; To: NAIRN AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4483381993882, 43.6791741606789], [-79.4495473959531, 43.6789139380522]]}"
198	15487	 	2023-02-13	Local Road Rehabilitation	BRIDGMAN AVE&lt;br&gt; From: DARTNELL AVE&lt;br&gt; To: [15 m W] DARTNELL AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4115365763733, 43.6750145911824], [-79.4117988856133, 43.6749637113763]]}"
199	15568	TS2022-03-001	2023-10-05	Major Road Reconstruction	THE QUEENSWAY EB&lt;br&gt; From: HUMBER RIVER&lt;br&gt; To: HIGH ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amir Gafoor, Engineering and Construction Services	Amir.Gafoor@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4754552420102, 43.6334533490102], [-79.4755693926282, 43.6333419110731], [-79.4758617917272, 43.6330631830845], [-79.4758652251398, 43.6330587011179], [-79.4762272223262, 43.632585945705], [-79.4764116363253, 43.632347451582], [-79.4766363038711, 43.63211346428], [-79.4768806972972, 43.6319289872655], [-79.4772145174171, 43.6317580269671], [-79.4777113489372, 43.6316275975456], [-79.4782023911683, 43.6315376630168], [-79.4784018234047, 43.6315151910907], [-79.4800604404825, 43.6312363970807], [-79.4803853595993, 43.6311689329529], [-79.4808663364015, 43.631105989422], [-79.4815169216916, 43.6309710539785]]}"
200	15582	 	2023-02-13	Local Road Rehabilitation	CORTLEIGH BLVD&lt;br&gt; From: AVENUE RD&lt;br&gt; To: MONA DR 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2026 - Q4 2026	Active	None	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4117758968158, 43.7130486454782], [-79.4135913428213, 43.7126674831447], [-79.4156786733477, 43.7122280026321], [-79.4162892475766, 43.7120934387677]]}"
201	15638	 	2023-09-11	Laneway Reconstruction	DOUGLAS CAMPBELL LANE&lt;br&gt; From: [57.90 m W] SPADINA AVE&lt;br&gt; To: ROBERT ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4012453655503, 43.6582724129034], [-79.402023594678, 43.6581118072005]]}"
202	15788	 	2023-05-19	Local Road Reconstruction	AMHERST AVE&lt;br&gt; From: GLENHOLME AVE&lt;br&gt; To: LAUDER AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2028 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4434416242263, 43.6907768698416], [-79.4445525426019, 43.6905352900118]]}"
203	15811	 	2023-12-08	Laneway Reconstruction	[30.50 m W] BEATRICE ST&lt;br&gt; From: [36.60 m N] DUNDAS ST W&lt;br&gt; To: [30.50 m S] COLLEGE ST (TO) 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2025 - Q2 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4155810547327, 43.6508007945212], [-79.4171087607406, 43.6546673031688], [-79.4171565928882, 43.6547878740736]]}"
204	15914	TS2023-13-001	2024-06-27	Major Road Reconstruction	GERRARD ST E&lt;br&gt; From: RATHMORE AVE&lt;br&gt; To: CLONMORE DR 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2029 - Q2 2032	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Sarmad Al-Douri, Engineering and Construction Services	saldour@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2808034597103, 43.6881509458582], [-79.2782247733673, 43.6887149349539], [-79.2781532794758, 43.6887363858347], [-79.2780668158708, 43.6887837349446]]}"
205	16073	"TS2023-08-169
"	2024-04-25	Local Road Reconstruction	ROSELAWN AVE&lt;br&gt; From: ELMRIDGE DR&lt;br&gt; To: LYON CRT 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2025 - 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adel Roufail, Engineering and Construction Services	aroufai@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.438994439253, 43.7026791478934], [-79.4403057695744, 43.7024159677482]]}"
206	16332	 	2024-03-14	Local Road Reconstruction	DANESWOOD RD&lt;br&gt; From: DAWLISH AVE&lt;br&gt; To: GLENALLAN RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Andrea Ramsay, Engineering and Construction Services	aramsay@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3816147933836, 43.7231452424089], [-79.3816913465234, 43.7235596165761], [-79.3817351371492, 43.7236940450744], [-79.3818625949369, 43.7239984738434], [-79.3819177709487, 43.7241363723062]]}"
207	16376	 1	2024-03-14	Local Road Reconstruction	PROCTOR CRES&lt;br&gt; From: ROTHMERE DR&lt;br&gt; To: MILDENHALL RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Andrea Ramsay, Engineering and Construction Services	aramsay@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3886777136323, 43.728769851871], [-79.3888309677892, 43.7291432921981], [-79.3889085643097, 43.7292759981522], [-79.3889395483323, 43.7293550465098], [-79.3889413069241, 43.7294566523656], [-79.3889333266775, 43.7295554133678], [-79.3889301180713, 43.7296386419724], [-79.3889271838447, 43.7297204927532], [-79.3889231083606, 43.7298220938335]]}"
208	16472	TS2023-13-001	2024-04-25	Major Road Reconstruction	GERRARD ST E&lt;br&gt; From: ONTARIO ST&lt;br&gt; To: BERKELEY ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2027 - Q3 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marilia Cimini, Engineering and Construction Services	mcimini@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3697172755116, 43.6617810438202], [-79.3685391029701, 43.6620435108171]]}"
209	16485	1	2024-03-14	Local Road Reconstruction	ST LEONARDS CRES&lt;br&gt; From: ST LEONARDS AVE&lt;br&gt; To: DAWLISH AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3887718742843, 43.7237594020805], [-79.3887339277786, 43.7237414616731], [-79.3886770081116, 43.723713854342], [-79.3885830754939, 43.723666937445], [-79.3884872590131, 43.7236186405419], [-79.3883819533554, 43.723559991862], [-79.3882425397906, 43.7234751692258], [-79.3881239918271, 43.723389637742], [-79.3880118406689, 43.7233156790014], [-79.3878695675333, 43.7232141098886], [-79.3876617295223, 43.7230827441636], [-79.3875622437126, 43.72301967183], [-79.3874907278577, 43.7229994827745], [-79.3874814849419, 43.722996863315], [-79.3873757562745, 43.7229736520902]]}"
210	16509	TS2024-09-008	2024-04-05	Major Road Reconstruction	DUFFERIN ST&lt;br&gt; From: DUPONT ST&lt;br&gt; To: GEARY AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2024 - Q3 2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Yang (Seamus) Liu, Engineering and Construction Services	sliu@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4390359214977, 43.6684648165049], [-79.4392790786271, 43.6689836989929], [-79.4392895711699, 43.6690064959376], [-79.4394758311778, 43.6694112099503], [-79.4395193759996, 43.6695390617975]]}"
211	16641	 	2024-06-28	Major Road Rehabilitation	WELLESLEY ST E&lt;br&gt; From: JARVIS ST&lt;br&gt; To: WELLESLEY PL 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2026 - Q4 2026	Active	None	Transportation Services	Rooban Markandu, Engineering and Construction Services	rmarkan2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3783470452101, 43.6662853080065], [-79.3774153017427, 43.6664850775114], [-79.3773127709555, 43.6665039729333], [-79.3772673732739, 43.6665060593174], [-79.3771889515577, 43.6665157901478], [-79.376986444433, 43.6664726333384], [-79.3768000444419, 43.6664473341763], [-79.3766627877851, 43.666432284456], [-79.3765008836219, 43.6664289195821]]}"
212	17114	 	2025-09-10	Local Road Rehabilitation	WINONA DR&lt;br&gt; From: [W] GLOUCESTER GRV [BRANCH]&lt;br&gt; To: [E] GLOUCESTER GRV [BRANCH] 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2025	Active	None	Transportation Services	Cherry Chen, Engineering and Construction Services	cchen9@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4383663285969, 43.696450021006], [-79.4384007794188, 43.6965537587194]]}"
213	17136	 	2025-10-31	Local Road Reconstruction	[36.60 m W] PAPE AVE&lt;br&gt; From: DINGWALL AVE&lt;br&gt; To: FRIZZELL AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3432662224613, 43.6735457324523], [-79.3435691363315, 43.6742692893272]]}"
214	17198	TS2023-11-186	2025-10-31	Local Road Reconstruction	GLENROSE AVE&lt;br&gt; From: CLIFTON RD&lt;br&gt; To: [E] GLENROSE AVE [END] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3839793704392, 43.6892205433723], [-79.3832170202299, 43.6893831118331]]}"
215	17214	TS2023-11-436	2025-09-05	Local Road Reconstruction	BALDWIN ST&lt;br&gt; From: KENSINGTON AVE (TO)&lt;br&gt; To: AUGUSTA AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4007089226048, 43.6547691715106], [-79.4015134783601, 43.654614691359], [-79.4020351684402, 43.6545084150705]]}"
216	17247	 	2024-08-14	Major Road Rehabilitation	GREENWOOD AVE&lt;br&gt; From: SPRINGDALE BLVD&lt;br&gt; To: QUEENSDALE AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Promil Sarkar, Engineering and Construction Services	psarkar@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3340637582019, 43.6854622211506], [-79.3344095530242, 43.6862688982361]]}"
217	17253	 	2025-09-10	Local Road Reconstruction	RIPLEY AVE&lt;br&gt; From: [E-W] RIPLEY AVE [LEG]&lt;br&gt; To: ORMSKIRK AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4745930727818, 43.6371820456265], [-79.4745961015679, 43.6372062159108], [-79.4746219600916, 43.6372650825915], [-79.4749660380039, 43.6377761731919], [-79.4752688187965, 43.6381989808467], [-79.4756074787958, 43.6385754715282], [-79.4759083851249, 43.6388873368296], [-79.4761854910703, 43.639134154202]]}"
218	17297	 	2024-08-14	Major Road Rehabilitation	GREENWOOD AVE&lt;br&gt; From: SAMMON AVE&lt;br&gt; To: MORTIMER AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Promil Sarkar, Engineering and Construction Services	psarkar@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3346688950647, 43.6868847097714], [-79.3355044691125, 43.6886606926582]]}"
219	17336	 	2025-10-31	Local Road Reconstruction	DEWBOURNE AVE&lt;br&gt; From: BATHURST ST&lt;br&gt; To: CHILTERN HILL RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4247659211015, 43.6990228426484], [-79.4250754201436, 43.6988465982607], [-79.4252296354115, 43.6987770211974], [-79.4256101198034, 43.6986053269079], [-79.4258025337746, 43.6985525046097], [-79.426880109488, 43.6983304531931]]}"
220	17355	 	2025-10-14	Local Road Rehabilitation	CARLTON ST&lt;br&gt; From: BROADCAST LANE&lt;br&gt; To: METCALFE ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3674857192746, 43.6645993879443], [-79.3667013421698, 43.6647859999478]]}"
221	17356	TS2023-24-430	2025-10-14	Major Road Reconstruction	SCARBOROUGH GOLF CLUB RD&lt;br&gt; From: LAWRENCE AVE E&lt;br&gt; To: BRIMORTON DR 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2025 - Q3 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Mehrshad Rahimi, Engineering and Construction Services	mrahimi@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2158381238168, 43.7618520435907], [-79.215828397595, 43.761950016156], [-79.2158324447904, 43.7620534695775], [-79.2158488821821, 43.7622024988695], [-79.2158485237521, 43.7623157526185], [-79.2158533224095, 43.7624097557626], [-79.2158620406353, 43.7625208357846], [-79.2158722112088, 43.7626349690136], [-79.2158872729591, 43.7627527229704], [-79.2159039667724, 43.7628665294621], [-79.2159326974007, 43.762993300559], [-79.2159616966173, 43.7630971913185], [-79.216003587844, 43.7632196925343], [-79.21606220225, 43.7633968796273], [-79.2161691132971, 43.763684334037], [-79.2162850205334, 43.7639235634562], [-79.2163939438197, 43.7641961499806], [-79.2164369274849, 43.7643170056097], [-79.2166796504369, 43.7648884954113], [-79.2177392055452, 43.7675540537722], [-79.2183042255374, 43.7688979326568], [-79.2186842206825, 43.7698112450039]]}"
222	17370	 	2025-10-14	Local Road Rehabilitation	CARLTON ST&lt;br&gt; From: DERMOTT PL&lt;br&gt; To: SACKVILLE ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3665810096809, 43.6648000780788], [-79.3665330111327, 43.6648056856891], [-79.3663490728968, 43.6648465249815], [-79.3663342369936, 43.664849820127], [-79.3650544654706, 43.6651339478541]]}"
223	17371	 	2025-10-14	Local Road Rehabilitation	REGENT ST&lt;br&gt; From: SHUTER ST&lt;br&gt; To: SUTTON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2026	Active	None	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3635196654214, 43.6572869062608], [-79.3636245791047, 43.6575166189766], [-79.3637305759413, 43.6577737410838], [-79.3637847207681, 43.6579141528371]]}"
224	17415	TS2023-08-235	2024-12-19	Local Road Rehabilitation	ORCHARD VIEW BLVD&lt;br&gt; From: [28.70 m E] ORIOLE PKWY [END]&lt;br&gt; To: ORIOLE PKWY 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2027 - Q4 2028	Active	None	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4066656579704, 43.7071719025079], [-79.40711993841, 43.7070861600804]]}"
225	18033	 	2026-04-21	Local Road Reconstruction	WEST HILL DR&lt;br&gt; From: LAWRENCE AVE E&lt;br&gt; To: KINGSTON RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.1798927774532, 43.7698408574246], [-79.180921252663, 43.7722488443744], [-79.1816823595394, 43.7740183311175], [-79.181731009347, 43.7741562734533], [-79.1817424416343, 43.7742377396766], [-79.1817559650317, 43.7743163124469]]}"
226	18118	 	2026-02-18	Local Road Reconstruction	HASLEMERE RD&lt;br&gt; From: KAPPELE AVE&lt;br&gt; To: LANGTON AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3937229185515, 43.7293319729461], [-79.3920647101273, 43.7297043106476]]}"
227	18309	 	2026-03-19	Local Road Reconstruction	RIDELLE AVE&lt;br&gt; From: BATHURST ST&lt;br&gt; To: MANITOU BLVD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4268565582106, 43.7071050983717], [-79.4285835861986, 43.7067692737433]]}"
228	18338	 	2026-04-21	Laneway Reconstruction	[42.70 m E] SPADINA AVE&lt;br&gt; From: D&apos;ARCY ST&lt;br&gt; To: BALDWIN ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3976430744263, 43.654075299388], [-79.397842054292, 43.6545627611997], [-79.3980490810434, 43.655069908559]]}"
229	18353	 	2026-03-19	Local Road Reconstruction	RIDELLE AVE&lt;br&gt; From: BURMONT RD&lt;br&gt; To: OLD PARK RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4318104838685, 43.7060823742306], [-79.4329630691003, 43.7058560969965]]}"
230	18375	 	2021-04-12	Laneway Reconstruction	[33.20 m N] DOUGLAS AVE&lt;br&gt; From: JEDBURGH RD&lt;br&gt; To: GREER RD 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2024 - Q3 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4063354943867, 43.7262409379777], [-79.4095119643438, 43.725568889742]]}"
231	18407	 	2023-02-13	Local Road Rehabilitation	MACPHERSON AVE&lt;br&gt; From: MADISON AVE&lt;br&gt; To: SPADINA RD (TO) 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4063298369843, 43.6761221387338], [-79.4066741646819, 43.6760507059513], [-79.4068049039809, 43.6760167777231], [-79.4069870403323, 43.6759529194814], [-79.4071208602984, 43.6759146808652], [-79.407379142515, 43.6758583981441], [-79.4074931331635, 43.6758691741159]]}"
232	18473	 	2023-05-09	Major Road Rehabilitation	DUNCAN ST&lt;br&gt; From: NELSON ST (TO)&lt;br&gt; To: RICHMOND ST W 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	2027	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3889254829888, 43.6488121554155], [-79.389043209377, 43.6491094398326], [-79.3891808409803, 43.6494570313201]]}"
233	18545	 	2023-03-24	Major Road Reconstruction	BLOOR ST W&lt;br&gt; From: MADISON AVE&lt;br&gt; To: SPADINA RD (TO) 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2023 - Q2 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Ahmed Bhabha, Engineering and Construction Services	abhabha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2023	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4027071807526, 43.6669054451141], [-79.4038707403777, 43.6666572968697]]}"
234	18613	 	2023-03-24	Major Road Reconstruction	BLOOR ST W&lt;br&gt; From: HURON ST&lt;br&gt; To: MADISON AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2023 - Q2 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Ahmed Bhabha, Engineering and Construction Services	abhabha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2023	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4015389542218, 43.6671618641117], [-79.4027071807526, 43.6669054451141]]}"
235	18707	 	2023-02-13	Local Road Rehabilitation	MACPHERSON AVE&lt;br&gt; From: SPADINA RD (TO)&lt;br&gt; To: WALMER RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4074931331635, 43.6758691741159], [-79.4080897468529, 43.6757501952466], [-79.4086770638926, 43.6756331312167]]}"
236	18768	TS2023-13-139	2023-09-26	Laneway Reconstruction	CALLAGHAN LANE&lt;br&gt; From: BERKELEY ST&lt;br&gt; To: PARLIAMENT ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2025 - Q3 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3675321846406, 43.6595666170583], [-79.3661821836771, 43.6598516538301]]}"
237	18810	 	2022-08-31	Local Road Rehabilitation	FERNWOOD PARK AVE&lt;br&gt; From: FIR AVE&lt;br&gt; To: HAZEL AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2026 - Q2 2027	Active	None	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2881650445252, 43.6703271470925], [-79.28817907089, 43.6704078969828], [-79.288402242705, 43.6709805696214], [-79.2884127267979, 43.6710213830359], [-79.2883999949919, 43.6710697145906], [-79.2883572749416, 43.6711330318403], [-79.2883355382896, 43.6711677547129], [-79.2883289174626, 43.6711991660805], [-79.2884618675573, 43.671481396703]]}"
238	18813	 	2023-03-24	Major Road Reconstruction	BLOOR ST W&lt;br&gt; From: DEVONSHIRE PL&lt;br&gt; To: ST GEORGE ST (TO) 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2023 - Q2 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Ahmed Bhabha, Engineering and Construction Services	abhabha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2023	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3983645805034, 43.667831627684], [-79.3998364722679, 43.6675168783568]]}"
239	18863	 	2023-05-19	Local Road Reconstruction	AMHERST AVE&lt;br&gt; From: LAUDER AVE&lt;br&gt; To: NORTHCLIFFE BLVD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2028 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4446388111249, 43.6907330363232], [-79.44575001914, 43.6904886833956]]}"
240	18960	 	2024-04-26	Local Road Reconstruction	MINUK ACRES&lt;br&gt; From: BEECHGROVE DR&lt;br&gt; To: [193 m S] BEECHGROVE DR [CUL-DE-SAC] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.1578992581969, 43.7663211783042], [-79.1579477710083, 43.7662314198049], [-79.1579588735707, 43.7660470235359], [-79.1579068533898, 43.765920147557], [-79.1573528687072, 43.7646543904454]]}"
241	19002	 	2024-04-12	Major Road Rehabilitation	KEELE ST&lt;br&gt; From: FINCH AVE W&lt;br&gt; To: STEELES AVE W 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2028 - Q4 2029	Active	None	Transportation Services	Adel Roufail, Engineering and Construction Services	aroufai@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4910534144174, 43.7635021636324], [-79.4916590122106, 43.7657154548501], [-79.4917365830686, 43.7660340878092], [-79.4918108279281, 43.7663390476703], [-79.492012041353, 43.767165649925], [-79.4920222716224, 43.7672076510298], [-79.4920479063207, 43.7673129251761], [-79.4932398858887, 43.7719900679568], [-79.4939610227479, 43.7748195513112], [-79.4940388269615, 43.7751688725797], [-79.4940486722192, 43.7752130688079], [-79.4940587288642, 43.7752553117934], [-79.4945741239377, 43.7774193338241], [-79.4946234866197, 43.7775764865151], [-79.4946446695939, 43.777664256922], [-79.494649409077, 43.7777179760671], [-79.4946566182132, 43.7777997690444], [-79.4946727146159, 43.7779103094385], [-79.4946735458159, 43.7779930355349], [-79.4946836092977, 43.7780664827646], [-79.4946870634698, 43.7781438172861], [-79.494680742704, 43.7782137352969], [-79.4946841926938, 43.7783102863908], [-79.494679272462, 43.7784027334653], [-79.4946799137436, 43.7785119310534], [-79.4946774394164, 43.7786062144747], [-79.4946752364054, 43.7787088410808], [-79.4946483297321, 43.7788578927048], [-79.4945988029888, 43.7789927853305], [-79.4945677521232, 43.7791091103228], [-79.4945386917629, 43.7792069659241], [-79.4945185875296, 43.7792871796776], [-79.4944932896992, 43.7793745751997], [-79.4944589432657, 43.7794832382108], [-79.4944443892126, 43.7795802204717], [-79.4944246694092, 43.7796651589292], [-79.4944072970319, 43.7797555882027], [-79.4943710468301, 43.779879084993], [-79.4943572618942, 43.779985517588], [-79.4943428958292, 43.7800752629071], [-79.4943343886777, 43.78019012894], [-79.4943094593848, 43.7803014756016], [-79.4943066096639, 43.7803910315595], [-79.4943036434677, 43.7805034594465], [-79.4943143542658, 43.7806284158206], [-79.49432827732, 43.7807454549342], [-79.4943429634807, 43.7808334842589], [-79.4943600083899, 43.7809269945], [-79.4943742165601, 43.7810523866875], [-79.4944003867822, 43.7811979141397], [-79.494427418631, 43.7813108133401], [-79.4944517289804, 43.7814327315561], [-79.4945063620089, 43.7815790704563]]}"
242	19012	 	2024-04-12	Major Road Rehabilitation	DUPONT ST&lt;br&gt; From: ST GEORGE ST (TO)&lt;br&gt; To: HURON ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q3 2027	Active	None	Transportation Services	Shahid Virk, Engineering and Construction Services	svirk@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.403600319043, 43.675594773861], [-79.4041738521104, 43.6754803452256], [-79.4047887916673, 43.6753576543882]]}"
243	19040	TS2024-07-026	2024-04-25	Major Road Rehabilitation	YORK GATE BLVD&lt;br&gt; From: FINCH AVE (N YK)&lt;br&gt; To: [90 m S] HULLMAR DR 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q4 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Tazeen Fatema, Engineering and Construction Services	tfatema@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5207024166112, 43.7567321291054], [-79.5214560836887, 43.7582764947319], [-79.5214689107933, 43.7583035048966], [-79.5214813392587, 43.758330496232], [-79.5214933715785, 43.7583574975418], [-79.5215042489616, 43.7583845080686], [-79.5215143535261, 43.7584070001422], [-79.5215236677644, 43.7584385025552], [-79.5215322212356, 43.7584610048204], [-79.5215399939401, 43.758488006927], [-79.5215469982981, 43.7585195106731], [-79.521553217044, 43.7585420124763], [-79.5215586566381, 43.7585735156163], [-79.5215637083951, 43.7586005191341], [-79.5215672090387, 43.7586275220441], [-79.5215707221047, 43.7586545258517], [-79.5215726703939, 43.7586815290542], [-79.5215742336994, 43.7587085332294], [-79.5215746283878, 43.7587355367249], [-79.5215746533688, 43.7587670417851], [-79.5215738678862, 43.7587895449082], [-79.5215723405024, 43.7588210502611], [-79.5215700291082, 43.7588480551669], [-79.5215665366716, 43.7588750593953], [-79.5215622755036, 43.7589020736697], [-79.5215576293378, 43.758929069114], [-79.5215522148125, 43.758960575199], [-79.5215456284282, 43.7589830803149], [-79.521538262501, 43.7590100852719], [-79.5215301265919, 43.7590370912734], [-79.5215215920267, 43.7590640973493], [-79.5215021969311, 43.7591046072522], [-79.521481645237, 43.7591406257754], [-79.5214606961042, 43.7591766263669], [-79.5214389757301, 43.7592126370004], [-79.5214161016042, 43.7592486469455], [-79.5213928271971, 43.7592801563663], [-79.5213687732143, 43.7593161755235], [-79.5213439492203, 43.7593521867182], [-79.521317967383, 43.7593836876275], [-79.5212915785313, 43.7594196982021], [-79.5212640458541, 43.7594557098834], [-79.5212361153871, 43.7594872291383], [-79.5212074012418, 43.7595187305293], [-79.521177919917, 43.7595547425508], [-79.5211476657469, 43.7595862532129], [-79.5211166291462, 43.7596177730126], [-79.5210961709434, 43.7596418018629], [-79.521085980321, 43.7596537762242], [-79.5210561110446, 43.7596852867906], [-79.5210274091359, 43.7597168070355], [-79.5209990949986, 43.7597528088936], [-79.5209715495739, 43.7597888196045], [-79.5209443891092, 43.7598248311381], [-79.5209184056188, 43.7598563400553], [-79.5208927974835, 43.759892350392], [-79.5208679717236, 43.7599283605799], [-79.5208439283405, 43.7599643706195], [-79.5208364558879, 43.7599755433564], [-79.5208198725094, 43.7600003806561], [-79.5208039561433, 43.7600183868303], [-79.520788824975, 43.7600408925532], [-79.520774089652, 43.7600588985083], [-79.5207605093031, 43.7600769033515], [-79.5207473294705, 43.7601039102084], [-79.5207349165068, 43.7601219148365], [-79.520723672493, 43.7601444207453], [-79.5207128134655, 43.760166925683], [-79.5207027352879, 43.7601849307844], [-79.5206934162263, 43.7602074354412], [-79.5206852769827, 43.7602299407837], [-79.5206775242813, 43.7602569547505], [-79.5206705508786, 43.7602749493858], [-79.5206647340116, 43.7602974543065], [-79.5206593021359, 43.7603199582572], [-79.5206550500861, 43.7603424709955], [-79.5206515556005, 43.7603649664944], [-79.5206484600785, 43.7603919706159], [-79.5206465316572, 43.7604144739326], [-79.520645371986, 43.7604369771103], [-79.5206452382403, 43.7604453122339], [-79.520670053419, 43.7605543220271], [-79.5206867247553, 43.7606399653056]]}"
244	19219	 	2023-10-30	Local Road Reconstruction	WANLESS CRES&lt;br&gt; From: WANLESS AVE&lt;br&gt; To: [E] BRAESIDE RD [CITY LIMITS] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2025 - Q3 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3902974312957, 43.7284420446276], [-79.390371317861, 43.728473161684], [-79.3905152493255, 43.7284986948301], [-79.3906592049065, 43.7285171789492], [-79.3908440224484, 43.7285230020713], [-79.3910035909218, 43.7285161081759], [-79.3912021026766, 43.7284866571272], [-79.3913656441166, 43.7284317890138], [-79.3915331273827, 43.7283515391172], [-79.3916480509961, 43.7282867302922], [-79.3917883247868, 43.7281852734111], [-79.3918682376245, 43.7281035079852], [-79.3919579460683, 43.7279921376891], [-79.3920067177683, 43.7279145742056], [-79.392057487223, 43.7278172629703], [-79.3920926624174, 43.7277284089555], [-79.3921239543733, 43.7275686026018]]}"
245	19276	 	2024-12-12	Laneway Reconstruction	COLBORNE LANE&lt;br&gt; From: LEADER LANE&lt;br&gt; To: [29 m W] CHURCH ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3753269587146, 43.6486930796184], [-79.3744918944045, 43.6488825806721]]}"
246	19326	TS2023-08-230	2024-06-26	Local Road Reconstruction	NEW HAVEN DR&lt;br&gt; From: [49.80 m E] GILGORM RD [END]&lt;br&gt; To: GILGORM RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.417408604062, 43.7061309192784], [-79.4179105080564, 43.7060097537411]]}"
247	19353	TS2023-15-006	2024-06-26	Local Road Reconstruction	BRIDLE PATH THE&lt;br&gt; From: [190 m N] POST RD&lt;br&gt; To: [350 m E] BAYVIEW AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2024 - Q1 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Matthew McAinsh, Engineering and Construction Services	mmcains@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3780820753087, 43.7393863376641], [-79.375655524588, 43.7398809959938], [-79.3754164417334, 43.7399281819757], [-79.3753322153297, 43.7399709044375], [-79.3752644649023, 43.7400135719084], [-79.37522303406, 43.7400443765641], [-79.3751875403775, 43.7400618739855], [-79.3751520330384, 43.7400793614797], [-79.3751138776274, 43.7400866575902], [-79.3750735064446, 43.740084842033], [-79.3750467370264, 43.7400795200553], [-79.3750265536145, 43.740071298779], [-79.3750010491297, 43.7400421879529], [-79.3749895840118, 43.739995566204], [-79.3749840549609, 43.7399356102399], [-79.3749772379396, 43.7398687570324], [-79.3749769068464, 43.7398172597968], [-79.3749711404811, 43.7397645675544], [-79.3749631836111, 43.7396715555544], [-79.3749402660273, 43.7395783021538], [-79.3748983366336, 43.7394556758636], [-79.3748588304262, 43.7393505136745], [-79.3748128240472, 43.7392923694233], [-79.3747785014396, 43.7392580281778], [-79.3747335132574, 43.7392296439423], [-79.3747010485269, 43.7392152883175]]}"
248	19494	 	2024-12-12	Laneway Reconstruction	COLBORNE LANE&lt;br&gt; From: [30.50 m N] WELLINGTON ST E&lt;br&gt; To: COLBORNE ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3744918944045, 43.6488825806721], [-79.3746058771626, 43.6491629649767]]}"
249	19547	1	2024-03-14	Local Road Reconstruction	MILDENHALL RD&lt;br&gt; From: BLYTHWOOD RD&lt;br&gt; To: LAWRENCE AVE E 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3832254686457, 43.7201223674845], [-79.3835472674394, 43.7208965323133], [-79.3838624792093, 43.721721433073], [-79.3842067678901, 43.7226071675237], [-79.3846013974838, 43.7235922398659], [-79.3849823905845, 43.7245527091598], [-79.3853886041248, 43.7255219245174], [-79.3857736626135, 43.7264958670832], [-79.386156918345, 43.7274497588323], [-79.3865424099046, 43.72839676001]]}"
250	19582	 	2024-06-26	Local Road Rehabilitation	WALMER RD&lt;br&gt; From: BERNARD AVE&lt;br&gt; To: DUPONT ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2024 - Q3 2024	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4072000442044, 43.6719424719085], [-79.4072545488145, 43.6720174980939], [-79.4082614536457, 43.6746125535303]]}"
251	19591	TS2023-04-089	2024-06-26	Local Road Rehabilitation	EVANS AVE (TO)&lt;br&gt; From: ARDAGH ST&lt;br&gt; To: ANNETTE ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4850005380202, 43.6561965500742], [-79.4853256417031, 43.6569701684169], [-79.4858924359026, 43.6583188841092], [-79.486049605417, 43.6586927663044]]}"
252	19598	 	2025-03-13	Laneway Reconstruction	[37 m S] EGLINTON AVE W&lt;br&gt; From: SCOTT RD&lt;br&gt; To: KEELE ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q3 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Matthew McAinsh, Engineering and Construction Services	mmcains@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4725949854874, 43.6903503685633], [-79.4730714030187, 43.690232095816], [-79.4730302442544, 43.6900932023795], [-79.4742979990668, 43.6898074367883]]}"
253	19623	 	2024-04-05	Laneway Reconstruction	[31.40 m N] ST CLAIR AVE W&lt;br&gt; From: SILVERTHORN AVE&lt;br&gt; To: CLOVERDALE RD 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2025 - Q4 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Matthew McAinsh, Engineering and Construction Services	mmcains@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4601960815277, 43.6746117523388], [-79.4616994597075, 43.6742792673888]]}"
254	19640	1	2024-03-14	Local Road Reconstruction	ROCHESTER AVE&lt;br&gt; From: MILDENHALL RD&lt;br&gt; To: LEWES CRES 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Rachele Joseph, Engineering and Construction Services	rgjoseph@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3853886041248, 43.7255219245174], [-79.3839519974445, 43.7258025955114]]}"
255	19706	TS2023-19-440	2024-03-14	Local Road Rehabilitation	BARKER AVE (E YK)&lt;br&gt; From: KING EDWARD AVE&lt;br&gt; To: GLEDHILL AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	2027	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3134045612865, 43.6950339831121], [-79.3122779029998, 43.6952964072236]]}"
256	19746	 	2025-04-12	Local Road Reconstruction	JIMMY WISDOM WAY&lt;br&gt; From: LIVINGSTONE AVE&lt;br&gt; To: BELGRAVIA AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4476356665481, 43.6971054479328], [-79.4479434087337, 43.6978400862883]]}"
257	19762	TS2023-12-009	2024-06-26	Local Road Rehabilitation	ARCHER RD&lt;br&gt; From: DUNLOE RD&lt;br&gt; To: BROWSIDE AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2024 - Q3 2024	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4139535093099, 43.6965057544061], [-79.4150224212979, 43.696282978252]]}"
258	19774	TS2024-10_11-027	2025-03-19	Major Road Rehabilitation	[E] UNIVERSITY AVE [BRANCH]&lt;br&gt; From: ELM ST&lt;br&gt; To: GERRARD ST W 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2027 (Carry-Over)	Active	None	Transportation Services	Manveer Ramburrun, Engineering and Construction Services	mrambur@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3888228239046, 43.6563763459643], [-79.3891509992519, 43.6571339644754], [-79.3893409813778, 43.6575640997989]]}"
259	19810	TS2023-13-044	2025-03-24	Local Road Reconstruction	SACKVILLE PL&lt;br&gt; From: SACKVILLE ST&lt;br&gt; To: WOODSTOCK PL 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2025 - Q3 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3653496007707, 43.6658238675451], [-79.3647928557414, 43.6659497421659], [-79.364759658338, 43.6659572730188]]}"
260	19828	 	2022-08-29	Laneway Reconstruction	[45.70 m E] BEECH AVE&lt;br&gt; From: CEDAR AVE&lt;br&gt; To: PINE AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q2 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Augustine Anifowose, Engineering and Construction Services	aanifow@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2875937208785, 43.674543323986], [-79.2879796582391, 43.6754832201276], [-79.2883565320521, 43.6764082458593]]}"
261	19836	 	2025-09-10	Local Road Rehabilitation	WINONA DR&lt;br&gt; From: CLOVELLY AVE&lt;br&gt; To: [W] GLOUCESTER GRV [BRANCH] 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2025	Active	None	Transportation Services	Cherry Chen, Engineering and Construction Services	cchen9@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4380315034335, 43.6956078171111], [-79.4383663285969, 43.696450021006]]}"
262	19853	 	2024-10-03	Local Road Rehabilitation	MONOGRAM PL&lt;br&gt; From: ISLINGTON AVE&lt;br&gt; To: [149 m W] ISLINGTON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	2026	Active	None	Transportation Services	&lt;Null&gt; Transportation Roads State of Good Repair	RoadSOGR@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5504401887582, 43.7051093412847], [-79.5506397989713, 43.7050555343207], [-79.5508200971026, 43.7049970549325], [-79.5509842798765, 43.7049432352074], [-79.5511516757264, 43.7048730764941], [-79.5513576867354, 43.7047725397907], [-79.5516055295401, 43.7046182714259], [-79.551679571599, 43.7045925357325], [-79.5521526839498, 43.704483706961]]}"
263	19936	 	2024-10-03	Local Road Rehabilitation	MONOGRAM PL&lt;br&gt; From: [389 m W] ISLINGTON AVE&lt;br&gt; To: [504 m W] ISLINGTON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	2026	Active	None	Transportation Services	&lt;Null&gt; Transportation Roads State of Good Repair	RoadSOGR@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5549610701561, 43.703837696326], [-79.5555025161576, 43.7037098704109]]}"
264	19944	 	2025-04-12	Laneway Reconstruction	[42.70 m S] NORTHUMBERLAND ST&lt;br&gt; From: [37.80 m W] OSSINGTON AVE&lt;br&gt; To: CONCORD AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4270812951849, 43.6623513366051], [-79.4265170795357, 43.6624741982785]]}"
265	19965	TS2023-19-440	2024-03-14	Local Road Rehabilitation	BARKER AVE (E YK)&lt;br&gt; From: CEDARVALE AVE&lt;br&gt; To: KING EDWARD AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	2027	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3146759823346, 43.6947314523992], [-79.3145799908176, 43.6947620820384], [-79.3134045612865, 43.6950339831121]]}"
266	19968	 1	2024-03-14	Local Road Reconstruction	BUCKINGHAM AVE&lt;br&gt; From: WANLESS CRES&lt;br&gt; To: MILDENHALL RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Andrea Ramsay, Engineering and Construction Services	aramsay@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3898757853593, 43.726695999282], [-79.386156918345, 43.7274497588323]]}"
267	20038	 	2024-06-26	Laneway Reconstruction	BARBARA BARRETT LANE&lt;br&gt; From: BRUNSWICK AVE&lt;br&gt; To: BORDEN ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4073084436925, 43.665493580025], [-79.4078890606607, 43.665356231679], [-79.4085026766956, 43.6652318318183]]}"
268	20119	None	2025-05-02	Laneway Reconstruction	[113 m W] HUMBERCREST BLVD&lt;br&gt; From: UNDERWOOD AVE&lt;br&gt; To: ST MARK&apos;S RD 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2026 - 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	 Toronto and Region Conservation Authority	info@trca.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4944723432002, 43.6604133685173], [-79.4946587574067, 43.6600939142195], [-79.4945341453956, 43.6594286188107]]}"
269	20125	 	2025-09-05	Laneway Reconstruction	KENSINGTON PL&lt;br&gt; From: [39 m S] KENSINGTON PL [BRANCH]&lt;br&gt; To: [18.40 m N] KENSINGTON PL [BRANCH] 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4007499872934, 43.6534883485982], [-79.4007728925547, 43.6535424297249], [-79.4009048452257, 43.6538315822093], [-79.4009158626777, 43.6538557063899], [-79.4009701358288, 43.6539746595193]]}"
270	20137	1	2024-03-14	Local Road Reconstruction	PEMBURY AVE&lt;br&gt; From: ST LEONARDS AVE&lt;br&gt; To: LAWRENCE BAYVIEW S [RAMP] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Andrea Ramsay, Engineering and Construction Services	aramsay@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3811784911169, 43.7253741502017], [-79.3813193309742, 43.7259049593112], [-79.3813273725343, 43.7259176594103], [-79.3813346688747, 43.7259306107699], [-79.3813410972023, 43.7259437691566], [-79.3813467790345, 43.7259571959051], [-79.3813516042565, 43.7259707117765], [-79.3813556484378, 43.7259843897594], [-79.3813589837494, 43.7259981381162], [-79.3813613133955, 43.726012030349], [-79.3813628982468, 43.7260259569136], [-79.3813636153853, 43.7260399365849], [-79.381363586412, 43.7260539883918], [-79.3813626888584, 43.7260679033785], [-79.3813609223651, 43.7260818633695], [-79.3813582884783, 43.7260957135451], [-79.3813549087439, 43.7261095008379], [-79.3813515297026, 43.7261229361828], [-79.3813473504182, 43.7261393420064]]}"
271	20150	TS2024-10_11-027	2025-03-19	Major Road Rehabilitation	[E] UNIVERSITY AVE [BRANCH]&lt;br&gt; From: GERRARD ST W&lt;br&gt; To: COLLEGE ST (TO) 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2027 (Carry-Over)	Active	None	Transportation Services	Manveer Ramburrun, Engineering and Construction Services	mrambur@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3893409813778, 43.6575640997989], [-79.3894883341719, 43.6579171042221], [-79.3897756908862, 43.6585848316182], [-79.3898303978546, 43.6587063485372], [-79.3901430171427, 43.6594579936092], [-79.3903322673134, 43.6598935461179]]}"
272	20170	 	2025-09-18	Local Road Reconstruction	MILITARY TRL&lt;br&gt; From: EAST HIGHLAND CREEK&lt;br&gt; To: HIGHCASTLE RD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2022 - Q4 2025 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2021	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2156789503788, 43.7840665592682], [-79.215622465804, 43.784112055445], [-79.2155803660269, 43.7841661573814], [-79.2155002979552, 43.784246188006], [-79.2150545239443, 43.7849107643258], [-79.2150073651678, 43.7849831689574], [-79.2149539848702, 43.7850365998439], [-79.2148845024549, 43.7851083438688], [-79.2148189818533, 43.7851620864484], [-79.214674615043, 43.7852967594842], [-79.2144252813211, 43.7854843740632], [-79.2141934273707, 43.785664403336], [-79.2141212818505, 43.7857338305359], [-79.2140508049784, 43.7857896611383], [-79.2140186270555, 43.7858154058046], [-79.2139814453889, 43.7858612923972]]}"
273	20216	 	2024-08-14	Major Road Rehabilitation	GREENWOOD AVE&lt;br&gt; From: STRATHMORE BLVD&lt;br&gt; To: GLEBEHOLME BLVD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Promil Sarkar, Engineering and Construction Services	psarkar@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3327160454509, 43.6822768313312], [-79.3334189364099, 43.6839276597938]]}"
274	20276	TS2023-09-011	2023-02-13	Local Road Rehabilitation	ASCOT AVE&lt;br&gt; From: ST CLAIR GDNS&lt;br&gt; To: BOON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4459694905645, 43.6796988576399], [-79.4465083593762, 43.6795814989939], [-79.4471291729001, 43.6794463072249]]}"
275	20350	 	2023-12-08	Laneway Reconstruction	[27.40 m S] COLLEGE ST (TO)&lt;br&gt; From: BEATRICE ST&lt;br&gt; To: [30.50 m W] BEATRICE ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2025 - Q2 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4166022309284, 43.6547698076285], [-79.4171087607406, 43.6546673031688]]}"
276	20357	 	2023-06-30	Local Road Reconstruction	TOFFEE CRT&lt;br&gt; From: NEW TORONTO ST&lt;br&gt; To: [128 m S] NEW TORONTO ST [CUL-DE-SAC] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5071503790768, 43.6053718274852], [-79.5076735563786, 43.6065277727074]]}"
277	20367	 	2026-04-21	Laneway Reconstruction	[43.70 m S] BALDWIN ST&lt;br&gt; From: HURON ST&lt;br&gt; To: [79.20 m W] HURON ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3967609641042, 43.6547857292458], [-79.397842054292, 43.6545627611997]]}"
278	20414	TS2023-12-084	2023-02-13	Local Road Rehabilitation	COLLEGE VIEW AVE&lt;br&gt; From: ORIOLE PKWY&lt;br&gt; To: HIGHBOURNE RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2026 - Q4 2026	Active	None	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4050543772978, 43.7023348701479], [-79.4063385693134, 43.7020610206571]]}"
279	20433	TS2023-08-414	2025-10-31	Local Road Rehabilitation	ORIOLE PKWY&lt;br&gt; From: ELWOOD BLVD&lt;br&gt; To: ROSELAWN AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2027 - Q4 2028	Active	None	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4072101079657, 43.7074777696901], [-79.4072759727031, 43.7077883597607], [-79.4073372664033, 43.7080404396191], [-79.4074163512529, 43.7083195376527], [-79.4074811493918, 43.7085536204118], [-79.4075478521891, 43.7088147093705], [-79.4076250520092, 43.7090443023238], [-79.4076714165776, 43.7091568556327]]}"
280	20448	 	2023-02-13	Local Road Rehabilitation	MACPHERSON AVE&lt;br&gt; From: HURON ST&lt;br&gt; To: MADISON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4051682267088, 43.6763638637536], [-79.4063298369843, 43.6761221387338]]}"
281	20553	 	2024-04-05	Local Road Reconstruction	DRAPER ST&lt;br&gt; From: FRONT ST W&lt;br&gt; To: WELLINGTON ST W 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2025 - Q3 2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Angela Au, Engineering and Construction Services	aau2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3975866728246, 43.6417692035288], [-79.3982472385781, 43.643300637109]]}"
282	20589	 	2025-04-12	Laneway Reconstruction	[37.80 m W] OSSINGTON AVE&lt;br&gt; From: [39.90 m S] NORTHUMBERLAND ST&lt;br&gt; To: NORTHUMBERLAND ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4265170795357, 43.6624741982785], [-79.4265122177632, 43.6624946182977], [-79.4266741792454, 43.6628937715732]]}"
283	20627	 	2025-10-31	Laneway Reconstruction	[119.70 m W] VIA ITALIA&lt;br&gt; From: AUBURN AVE&lt;br&gt; To: [34.40 m N] AUBURN AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4461915623151, 43.674627778711], [-79.4463538719074, 43.6750084237118]]}"
284	20679	 	2025-10-14	Local Road Rehabilitation	MAUD ST&lt;br&gt; From: ADELAIDE ST W&lt;br&gt; To: RICHMOND ST W 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2026	Active	None	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3996280936983, 43.6459341203161], [-79.4001233301106, 43.6471866306743]]}"
285	20712	 	2025-09-10	Local Road Rehabilitation	WINONA DR&lt;br&gt; From: [E] GLOUCESTER GRV [BRANCH]&lt;br&gt; To: LANARK AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q4 2025	Active	None	Transportation Services	Cherry Chen, Engineering and Construction Services	cchen9@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4384007794188, 43.6965537587194], [-79.438721019606, 43.6972723920108]]}"
286	20759	 	2026-04-20	Local Road Reconstruction	CHEMICAL CRT&lt;br&gt; From: [305 m S] CORONATION DR [CUL-DE-SAC]&lt;br&gt; To: CORONATION DR 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.1620622871605, 43.7627011717355], [-79.1622774220258, 43.7632646970804], [-79.1625531024077, 43.7639405985815], [-79.1629828782256, 43.7649679518757], [-79.1632110474337, 43.7655356839205]]}"
287	20768	 	2025-10-31	Local Road Reconstruction	WESTSIDE DR&lt;br&gt; From: THE WEST MALL&lt;br&gt; To: [457 m S/W] THE WEST MALL 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5662236039272, 43.6166682167921], [-79.5657476618787, 43.616804970045], [-79.5635206300727, 43.617310243505], [-79.5635340313081, 43.6174107197341], [-79.563620988626, 43.6177053776336], [-79.5636447908434, 43.6178570111825], [-79.5636253016292, 43.6180544599082], [-79.5635822375292, 43.6183091383118], [-79.5635705678914, 43.6184436474947], [-79.5635431880623, 43.6186267730273], [-79.5635512638389, 43.6188184850922], [-79.5635829218135, 43.6189644010616], [-79.563603489938, 43.6190131331591]]}"
288	20770	 	2023-02-13	Local Road Rehabilitation	CASTLEFIELD AVE&lt;br&gt; From: YONGE ST&lt;br&gt; To: DUPLEX AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2026 - Q4 2026	Active	None	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3994765803976, 43.7118389672036], [-79.3999992653582, 43.7117357599221], [-79.4012583548804, 43.7114871522528]]}"
289	20776	 	2026-04-20	Local Road Reconstruction	AMIENS RD&lt;br&gt; From: KINGSTON RD&lt;br&gt; To: FAIRWOOD CRES 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.184863359705, 43.7728112802124], [-79.1863638005539, 43.7735699522827], [-79.1868036619154, 43.7738546671156], [-79.1868450449427, 43.7738898382272], [-79.1868816769281, 43.773933277375], [-79.1869232842013, 43.7739923921575], [-79.1869513356938, 43.7740545391914], [-79.186996599507, 43.7741416476665], [-79.187177228674, 43.7745825554159], [-79.18736667914, 43.7750286896456], [-79.1881164928947, 43.7767670532607]]}"
290	20821	 	2026-04-01	Local Road Rehabilitation	PENROSE RD&lt;br&gt; From: DE-SAVERY CRES&lt;br&gt; To: MOUNT PLEASANT RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	2026	Active	None	Transportation Services	&lt;Null&gt; Transportation Roads State of Good Repair	RoadSOGR@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3895303356371, 43.7030380540573], [-79.3881569271875, 43.7032932683942]]}"
291	20822	 	2025-04-12	Local Road Reconstruction	JIMMY WISDOM WAY&lt;br&gt; From: WHITMORE AVE&lt;br&gt; To: HOPEWELL AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	2027 - 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4482622786283, 43.6985974849065], [-79.4485519869181, 43.6993205079126]]}"
292	20863	 	2025-10-31	Laneway Reconstruction	[87.20 m N] DAVENPORT RD&lt;br&gt; From: GREENLAW AVE&lt;br&gt; To: ST CLARENS AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2027 - Q4 2028	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Adriana Gomez, Engineering and Construction Services	AGOMEZ4@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4464401861922, 43.672909534591], [-79.4464681309669, 43.6728510030595], [-79.4465036843606, 43.6728113859667], [-79.4465549600059, 43.6727870163589], [-79.4471822074002, 43.6726508225971], [-79.44780806402, 43.6725149217989]]}"
293	20888	 	2024-04-16	Local Road Rehabilitation	SEATON ST&lt;br&gt; From: GERRARD ST E&lt;br&gt; To: CARLTON ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2025 - Q3 2025	Active	None	Transportation Services	Angela Au, Engineering and Construction Services	aau2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3707022026958, 43.6615644097245], [-79.3708667424657, 43.6619573872842], [-79.3708772649237, 43.6619825039129], [-79.3713166724191, 43.6630318662645], [-79.3713360896155, 43.6630782540242], [-79.3715181257567, 43.6635129822445]]}"
294	20927	 	2024-03-14	Local Road Reconstruction	MILDENHALL RD&lt;br&gt; From: BRAESIDE RD&lt;br&gt; To: [2 m E] BRAESIDE RD [CITY LIMITS] 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3906478729751, 43.7299911294821], [-79.3908941022949, 43.7299304336252]]}"
295	21023	 	2026-03-02	Local Road Reconstruction	DOVER AVE&lt;br&gt; From: BROWNS LINE&lt;br&gt; To: LLOYD GEORGE AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Nicholas Mah, Engineering and Construction Services	nmah@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5425605950632, 43.5957686235557], [-79.5429486575409, 43.5956784261486], [-79.5430568545606, 43.5956595238175], [-79.5445517101717, 43.595319512755]]}"
296	21024	 	2026-04-21	Local Road Reconstruction	ORCHARD PARK DR&lt;br&gt; From: KINGSTON RD&lt;br&gt; To: WEST HILL DR 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Niloufar Mohajerani, Engineering and Construction Services	nmohaje@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.1793273630366, 43.7746799814392], [-79.1793724937866, 43.7747707128139], [-79.1794136503585, 43.7748287408155], [-79.1794531636817, 43.7748595347893], [-79.1795028874367, 43.7748832464663], [-79.1795664299426, 43.7748966815375], [-79.1796418076897, 43.7748990774229], [-79.1798225588095, 43.7749044031346], [-79.1804253829807, 43.7748996607445], [-79.1810603904613, 43.7749045237125], [-79.1817180624308, 43.7749199236184]]}"
297	21059	TS2023-03-443	2025-06-03	Local Road Reconstruction	ALBRIGHT AVE&lt;br&gt; From: FOCH AVE&lt;br&gt; To: SUNSET AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2026 - Q1 2031	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Shailaja Patel, Engineering and Construction Services	spatelz@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5469216237026, 43.5976659312271], [-79.5481067030705, 43.5973842902768], [-79.5494843735706, 43.5970827623519], [-79.5496921738215, 43.5970175071547]]}"
298	21100	TS2023-13-044	2025-03-24	Local Road Reconstruction	SACKVILLE PL&lt;br&gt; From: FLAGLER ST&lt;br&gt; To: BOWMAN ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2025 - Q3 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3646466576578, 43.6659828749929], [-79.3641587769398, 43.6660933151395]]}"
299	21171	 	2025-04-12	Laneway Reconstruction	[38.10 m E] SHAW ST&lt;br&gt; From: PENDRITH ST&lt;br&gt; To: ESSEX ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4242734711621, 43.6665027197421], [-79.4246526071723, 43.6674602190107]]}"
300	21172	 	2025-04-12	Laneway Reconstruction	[35.30 m W] BATHURST ST&lt;br&gt; From: OLIVE AVE (TO)&lt;br&gt; To: [34.10 m N] OLIVE AVE (TO) 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4138092306099, 43.6702085230858], [-79.413930599998, 43.6705343159295]]}"
301	21268	 	2024-06-26	Laneway Reconstruction	[38.10 m E] BATHURST ST&lt;br&gt; From: LENNOX ST&lt;br&gt; To: BLOOR ST W 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2024 - Q3 2024	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4100747489274, 43.6639637726958], [-79.4102218830197, 43.6643400146966], [-79.4105942123266, 43.6652543887795]]}"
302	21274	 	2024-03-14	Local Road Reconstruction	[N-S] BRAESIDE RD [BRANCH]&lt;br&gt; From: HASLEMERE RD&lt;br&gt; To: BRAESIDE CRES 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2027 - Q1 2030	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Harry Persaud, Engineering and Construction Services	hpersau3@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3908941022949, 43.7299304336252], [-79.3905438757911, 43.7291351132711]]}"
303	21382	 	2024-12-12	Local Road Reconstruction	COLBORNE ST&lt;br&gt; From: LEADER LANE&lt;br&gt; To: CHURCH ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3754504316776, 43.6489765510062], [-79.3753002386409, 43.6490118796407], [-79.3746058771626, 43.6491629649767], [-79.3741453385907, 43.6492626935461]]}"
304	21397	 	2024-11-14	Local Road Reconstruction	MITRE PL&lt;br&gt; From: HOLYWELL DR&lt;br&gt; To: HOLYWELL DR 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2025 - Q1 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Martina Betkova, Engineering and Construction Services	mbetkov@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.5540771446468, 43.6887890391888], [-79.553917401962, 43.6886250047371], [-79.5538202859574, 43.6885259119776], [-79.5537166795524, 43.6884079122508], [-79.5536486863355, 43.6883190041267], [-79.5535904664044, 43.6881991116004], [-79.5535590488738, 43.6881031130436], [-79.5535355356589, 43.688010126211], [-79.5535167285522, 43.6879797565246], [-79.5534826918169, 43.6879525534185], [-79.5534515352455, 43.6879419545569], [-79.5533842784569, 43.6879424882594], [-79.5533342255082, 43.687942006651], [-79.5532895510738, 43.6879639618585], [-79.553198942574, 43.6879988886079], [-79.5530882438889, 43.688040764621], [-79.5526545907676, 43.6881798192757], [-79.5526215137251, 43.6881873127885], [-79.5525127692641, 43.6882107598793], [-79.5524357015741, 43.6882426184583], [-79.5524173913862, 43.6883151098341], [-79.552472969827, 43.6884212168754], [-79.5525248771413, 43.6885149667886], [-79.5525753931213, 43.6886630023605], [-79.5526250563884, 43.6887860317862], [-79.5527156074446, 43.6889273959899], [-79.552810292546, 43.6890438075051], [-79.5530985528429, 43.6893453714308]]}"
305	21411	TS2023-11-029	2024-06-26	Local Road Rehabilitation	HERRICK ST&lt;br&gt; From: MARKHAM ST&lt;br&gt; To: PALMERSTON BLVD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2024 - Q3 2024	Active	None	Transportation Services	Christy Manoharan, Engineering and Construction Services	cmanoha@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4114576723732, 43.6624292964346], [-79.4126645578283, 43.662169279564]]}"
306	21417	 	2024-08-14	Major Road Rehabilitation	GREENWOOD AVE&lt;br&gt; From: QUEENSDALE AVE&lt;br&gt; To: SAMMON AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2025 - Q3 2026 (Carry-Over)	Active	None	Transportation Services	Promil Sarkar, Engineering and Construction Services	psarkar@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3344095530242, 43.6862688982361], [-79.3346688950647, 43.6868847097714]]}"
307	21443	 	2024-06-26	Laneway Reconstruction	[23.20 m N] QUEEN ST E&lt;br&gt; From: JONES AVE&lt;br&gt; To: [30.50 m E] JONES AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2023 - Q4 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Jessica Orjuela, Engineering and Construction Services	jorjuel@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2023	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3329504462896, 43.6629909150906], [-79.3324316859436, 43.6631086314602]]}"
308	21529	TS2023-13-001	2024-04-25	Major Road Reconstruction	[N] GERRARD ST E [BRANCH]&lt;br&gt; From: GERRARD ST E&lt;br&gt; To: PARLIAMENT ST 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q1 2027 - Q3 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marilia Cimini, Engineering and Construction Services	mcimini@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3681759581657, 43.6621129619358], [-79.3671914091739, 43.6623343336908]]}"
309	21591	TS2023-13-049	2024-04-25	Local Road Rehabilitation	ST PAUL ST&lt;br&gt; From: [E-W] SACKVILLE ST [LEG]&lt;br&gt; To: RAY LANE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2024 - Q4 2025 (Carry-Over)	Active	None	Transportation Services	Javier Saborio, Engineering and Construction Services	jsabori@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3601728138743, 43.6555520349636], [-79.3601904337114, 43.6556400546295], [-79.3603190377128, 43.6559653937652], [-79.3603520870864, 43.6560522368728], [-79.360355685286, 43.6560617016883]]}"
310	21604	 	2024-10-28	Laneway Reconstruction	HABIBI LANE&lt;br&gt; From: CALEDONIA RD&lt;br&gt; To: GILBERT AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4569713816663, 43.6805719643924], [-79.4576392528267, 43.6804243690658], [-79.4582674458277, 43.6802855424369]]}"
311	21749	TS2023-06_07-301	2024-06-21	Local Road Reconstruction	SENTINEL RD&lt;br&gt; From: GRANDRAVINE DR&lt;br&gt; To: LAMBERTON BLVD 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2024 - Q4 2025	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2024	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4956576797227, 43.7516805909094], [-79.4957851261805, 43.751750424298], [-79.4958515122395, 43.7517703400838], [-79.4959177875805, 43.7517938842112], [-79.4959964927245, 43.7518194441049], [-79.4960643702896, 43.7518390357759], [-79.496123033533, 43.7518486627649], [-79.4962095750588, 43.7518616571009], [-79.4962542923808, 43.7518696174368], [-79.4963307619344, 43.7518860768128], [-79.4964156030577, 43.7518874413866], [-79.4964980964799, 43.7519025416579], [-79.4965898166639, 43.7519083709086], [-79.4966948843768, 43.7519376134956], [-79.4968959344254, 43.7519440972967], [-79.4970222130965, 43.7519649789414], [-79.497127281119, 43.7519942202306], [-79.4972333923803, 43.7520220392587], [-79.4973546649904, 43.7520620380644], [-79.4974302528735, 43.7520918895701], [-79.4975342649792, 43.7521417702134], [-79.4976295468306, 43.752182810502], [-79.4977049360446, 43.7522199077875], [-79.4978228051648, 43.7522750901515], [-79.4978913402718, 43.7523077306884], [-79.4979738066756, 43.7523420375541], [-79.4980639841615, 43.7523866238613], [-79.4981645191482, 43.7524360880141], [-79.4982814330221, 43.7524890726948], [-79.4983670909169, 43.7525346929316], [-79.4984539643572, 43.752590807619], [-79.4985164601967, 43.7526247960772], [-79.4985859107562, 43.7526788302588], [-79.4986510261448, 43.7527458521772], [-79.4987258412974, 43.7528046839751], [-79.4987864522099, 43.7528535071399], [-79.4988490376195, 43.752903087293], [-79.4989321995864, 43.7530044695063], [-79.4989576685949, 43.7530599810359], [-79.4990037760249, 43.7531096599641], [-79.499052131938, 43.7531876476622], [-79.4991116765112, 43.7532571202924], [-79.4991989755967, 43.7533719780316], [-79.4992660579152, 43.7534589678638], [-79.4993389643231, 43.7535518624751], [-79.4993761078269, 43.7536191475402], [-79.4994597321949, 43.7537408558645], [-79.4994927396691, 43.7537946570756], [-79.499578922753, 43.7538953655262]]}"
312	21795	TS2023-19-335	2025-07-18	Local Road Rehabilitation	HAZEL AVE&lt;br&gt; From: BALSAM AVE&lt;br&gt; To: FERNWOOD PARK AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2026 - Q2 2027	Active	None	Transportation Services	Tony Rodrigues, Engineering and Construction Services	trodrig@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.2896188758716, 43.6714184253583], [-79.2891267694922, 43.6715303358226], [-79.2890593131808, 43.6715463786438], [-79.2889869514439, 43.6715467311621], [-79.2889265159845, 43.6715480507959], [-79.2888219319829, 43.671542321821], [-79.2887122376462, 43.6715401118242], [-79.2886268209277, 43.6715289632942], [-79.2885766161282, 43.6715232437212], [-79.2884618650676, 43.6714813993987]]}"
313	21843	 	2024-06-28	Major Road Rehabilitation	WELLESLEY ST E&lt;br&gt; From: HOMEWOOD AVE (TO)&lt;br&gt; To: SHERBOURNE ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q1 2026 - Q4 2026	Active	None	Transportation Services	Rooban Markandu, Engineering and Construction Services	rmarkan2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3758529017376, 43.6664862708985], [-79.3757151542148, 43.6665228970707], [-79.3755319095527, 43.6665916101116], [-79.3753480007433, 43.6666700723793], [-79.3751682423503, 43.6667655766081], [-79.3750017079836, 43.66687240519], [-79.3748581028492, 43.6669787284524], [-79.3746839177489, 43.6670945180206]]}"
314	21899	 	2024-04-12	Local Road Rehabilitation	MACPHERSON AVE&lt;br&gt; From: RATHNELLY AVE&lt;br&gt; To: POPLAR PLAINS RD 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2027 - Q4 2027	Active	None	Transportation Services	Promil Sarkar, Engineering and Construction Services	psarkar@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4005591523686, 43.6774046708274], [-79.400639024213, 43.6773717414498], [-79.4021896299504, 43.6770202936808], [-79.4029841859579, 43.6768401828977]]}"
315	21917	TS2023-09-011	2023-02-13	Local Road Rehabilitation	ASCOT AVE&lt;br&gt; From: NAIRN AVE&lt;br&gt; To: HARVIE AVE 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q2 2027	Active	None	Transportation Services	Lucas Da Costa, Engineering and Construction Services	ldacost@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4495473959531, 43.6789139380522], [-79.4507281001754, 43.6786565635646]]}"
316	21938	 	2025-11-17	Local Road Rehabilitation	WALES AVE&lt;br&gt; From: LEONARD AVE&lt;br&gt; To: CARLYLE ST 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q2 2027 - Q4 2028	Active	None	Transportation Services	Steven Bertolo, Engineering and Construction Services	sbertol@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4042150473904, 43.652833895848], [-79.4046340427991, 43.6527447222629], [-79.4046965971638, 43.652728940144], [-79.4047441896975, 43.6527130465095], [-79.4048000422126, 43.6526784009062]]}"
317	21939	TS2023-08-114	2024-06-14	Laneway Reconstruction	[37 m N] BEDFORD PARK AVE&lt;br&gt; From: AVENUE RD&lt;br&gt; To: GREY RD 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2026 - Q3 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Fulvio Naccarato, Engineering and Construction Services	fnaccar@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4167171115665, 43.7249710151449], [-79.4195982671343, 43.7243612752746]]}"
318	21983	 	2025-02-25	Major Road Rehabilitation	DUPONT ST&lt;br&gt; From: [21.30 m E] SPADINA RD (TO)&lt;br&gt; To: SPADINA RD (TO) 	Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.	Q3 2026 - Q3 2027	Active	None	Transportation Services	Shahid Virk, Engineering and Construction Services	svirk@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4068632086908, 43.6749142174177], [-79.4071227701378, 43.6748573134163]]}"
319	21994	 	2026-03-11	Laneway Reconstruction	LEADER LANE&lt;br&gt; From: COLBORNE ST&lt;br&gt; To: KING ST E 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.3754504316776, 43.6489765510062], [-79.3755293657239, 43.6491712293307], [-79.3755633110524, 43.6492526295987], [-79.3757196347688, 43.6496404261973]]}"
320	21999	 	2024-10-28	Laneway Reconstruction	[40.20 m N] NORMAN AVE&lt;br&gt; From: CALEDONIA RD&lt;br&gt; To: GILBERT AVE 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q4 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4559741306975, 43.6782030316494], [-79.4566428105757, 43.6780566539711], [-79.4572603498788, 43.6779214734103]]}"
321	22011	TS2023-13-146	2025-06-13	Laneway Reconstruction	COATSWORTH ST&lt;br&gt; From: ONTARIO ST&lt;br&gt; To: MILAN ST 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q4 2025 - Q3 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Amran Durrani, Engineering and Construction Services	adurran2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.368401138943, 43.6584551892994], [-79.3678113591853, 43.6585849014364]]}"
322	22014	 	2024-08-30	Local Road Reconstruction	DONALD AVE&lt;br&gt; From: SILVERTHORN AVE&lt;br&gt; To: KANE AVE 	Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2026 - Q3 2026	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Matthew McAinsh, Engineering and Construction Services	mmcains@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2026	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4665492412748, 43.6862895180226], [-79.4678915091002, 43.6859965090083], [-79.4681531294418, 43.6859634177877]]}"
323	22022	 	2022-07-22	Laneway Reconstruction	[116.70 m W] RONCESVALLES AVE&lt;br&gt; From: GEOFFREY ST&lt;br&gt; To: GRENADIER RD 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q3 2025 - Q4 2026 (Carry-Over)	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Marfique Ahmed, Engineering and Construction Services	mahmed2@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2025	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4514451805993, 43.6476871556254], [-79.4515951399121, 43.6480977804842], [-79.4517427017002, 43.6485017971034]]}"
324	22164	 	2025-04-12	Laneway Reconstruction	[30.50 m W] DOVERCOURT RD&lt;br&gt; From: MACKENZIE CRES&lt;br&gt; To: [29 m N] MACKENZIE CRES 	Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.	Q2 2027 - Q4 2027	Active	1 - Projects with approved or allocated funding in the Capital Works Program.	Transportation Services	Osa Ehioghiren, Engineering and Construction Services	oehiogh@toronto.ca	https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/	TS_Road_Reconstruction	12	2027	EXTERNAL	"{""type"": ""LineString"", ""coordinates"": [[-79.4245709050488, 43.6477194404793], [-79.4246837411742, 43.6480218086139]]}"
