{"help": "https://ckan0.cf.opendata.inter.prod-toronto.ca/tl/api/3/action/help_show?name=datastore_search", "success": true, "result": {"include_total": true, "limit": 100, "records_format": "objects", "resource_id": "40d94b5a-cbf2-4e04-8d48-24038d163d0c", "total_estimation_threshold": null, "records": [{"_id":1,"OBJECTID":78,"PROJ_NUM":" 1","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"BUCKINGHAM AVE&lt;br&gt; From: WANLESS CRES&lt;br&gt; To: MILDENHALL RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3898757841263, 43.7266959947802], [-79.3861569171003, 43.7274497606314]]}"},{"_id":2,"OBJECTID":292,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Rehabilitation","LOCATION":"BOSWELL AVE&lt;br&gt; From: [240.80 m E] BEDFORD RD [END]&lt;br&gt; To: BEDFORD RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Angela Au, Engineering and Construction Services","CONTACT_EMAIL":"aau2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3959798927594, 43.6726076581763], [-79.3988644329478, 43.6720084809835]]}"},{"_id":3,"OBJECTID":297,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Rehabilitation","LOCATION":"WINONA DR&lt;br&gt; From: LANARK AVE&lt;br&gt; To: EGLINTON AVE W ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Cherry Chen, Engineering and Construction Services","CONTACT_EMAIL":"cchen9@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4387210208475, 43.6972723911113], [-79.4388960360233, 43.6977113965367], [-79.4390546198234, 43.6981091760141]]}"},{"_id":4,"OBJECTID":362,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-07-18","PROJECT":"Local Road Rehabilitation","LOCATION":"HAZEL AVE&lt;br&gt; From: FERNWOOD PARK AVE&lt;br&gt; To: BEECH AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Tony Rodrigues, Engineering and Construction Services","CONTACT_EMAIL":"trodrig@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2884618675573, 43.6714813967029], [-79.2879610368349, 43.6716000333949], [-79.2872199949479, 43.6717511208522]]}"},{"_id":5,"OBJECTID":418,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"CARLTON ST&lt;br&gt; From: PARLIAMENT ST&lt;br&gt; To: BROADCAST LANE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Jessica Orjuela, Engineering and Construction Services","CONTACT_EMAIL":"jorjuel@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3680570983726, 43.6644634364699], [-79.3674857180327, 43.664599388843]]}"},{"_id":6,"OBJECTID":428,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Rehabilitation","LOCATION":"WINONA DR&lt;br&gt; From: AVA RD&lt;br&gt; To: CLOVELLY AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Cherry Chen, Engineering and Construction Services","CONTACT_EMAIL":"cchen9@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4378210778934, 43.6951081303487], [-79.4380314984721, 43.6956078162082]]}"},{"_id":7,"OBJECTID":429,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Rehabilitation","LOCATION":"WINONA DR&lt;br&gt; From: BELVIDERE AVE&lt;br&gt; To: BUDE ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Cherry Chen, Engineering and Construction Services","CONTACT_EMAIL":"cchen9@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4372030906581, 43.6935452763142], [-79.4377070748369, 43.6947908537966]]}"},{"_id":8,"OBJECTID":433,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Rehabilitation","LOCATION":"WINONA DR&lt;br&gt; From: BUDE ST&lt;br&gt; To: AVA RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Cherry Chen, Engineering and Construction Services","CONTACT_EMAIL":"cchen9@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4377070748369, 43.6947908537966], [-79.4378210778934, 43.6951081303487]]}"},{"_id":9,"OBJECTID":693,"PROJ_NUM":"TS2023-10_11-435","LAST_UPDATED_DATE":"2025-09-05","PROJECT":"Local Road Reconstruction","LOCATION":"AUGUSTA AVE&lt;br&gt; From: NASSAU ST&lt;br&gt; To: OXFORD ST (TO) ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4023360063203, 43.6552350637161], [-79.4026845921798, 43.6560924157577]]}"},{"_id":10,"OBJECTID":1271,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-30","PROJECT":"Local Road Reconstruction","LOCATION":"[E-W] RIPLEY AVE [LEG]&lt;br&gt; From: SOUTH KINGSWAY&lt;br&gt; To: RIPLEY AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"&lt;Null&gt; Transportation Roads State of Good Repair","CONTACT_EMAIL":"RoadSOGR@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4752735067663, 43.6367801228756], [-79.4750956403653, 43.6368789644543], [-79.4747420400863, 43.6370114142297], [-79.4746954581377, 43.6370258151413], [-79.4746477322885, 43.6370488931129], [-79.474601858692, 43.6370880749489], [-79.4745885481266, 43.6371459598801], [-79.4745930690629, 43.637182047426]]}"},{"_id":11,"OBJECTID":2762,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Laneway Reconstruction","LOCATION":"[42.70 m E] SPADINA AVE&lt;br&gt; From: D&apos;ARCY ST&lt;br&gt; To: BALDWIN ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3976430744232, 43.6540753011883], [-79.3978420555363, 43.6545627585005], [-79.3980490773241, 43.6550699085557]]}"},{"_id":12,"OBJECTID":2938,"PROJ_NUM":"TS2023-11-145","LAST_UPDATED_DATE":"2026-07-14","PROJECT":"Local Road Reconstruction","LOCATION":"CLIFTON RD&lt;br&gt; From: [73 m S] GLENROSE AVE [END]&lt;br&gt; To: GLENROSE AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Hazel Breton, Engineering and Construction Services","CONTACT_EMAIL":"hbreton@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.383481848753, 43.688549726741], [-79.3835885031877, 43.6885746879966], [-79.383651213714, 43.6885971380767], [-79.3836898413836, 43.6886162331393], [-79.3837153778152, 43.6886441271447], [-79.3837418307788, 43.6886920229647], [-79.3838774970561, 43.6889819036982], [-79.3839793741641, 43.6892205415758]]}"},{"_id":13,"OBJECTID":3002,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Local Road Reconstruction","LOCATION":"WEST HILL DR&lt;br&gt; From: LAWRENCE AVE E&lt;br&gt; To: KINGSTON RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.1798927836686, 43.7698408565419], [-79.1809212501835, 43.7722488434674], [-79.1816823570359, 43.774018334711], [-79.1817310031122, 43.7741562779365], [-79.181742446584, 43.7742377432909], [-79.181755967497, 43.7743163160543]]}"},{"_id":14,"OBJECTID":3008,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-07-14","PROJECT":"Laneway Reconstruction","LOCATION":"[195.70 m N] DAVENPORT RD&lt;br&gt; From: ST CLARENS AVE&lt;br&gt; To: [36.10 m W] ST CLARENS AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.448182713631, 43.6734808147367], [-79.4487804313447, 43.673349970823]]}"},{"_id":15,"OBJECTID":3715,"PROJ_NUM":"TS2023-20-173","LAST_UPDATED_DATE":"2026-03-19","PROJECT":"Local Road Reconstruction","LOCATION":"PARKCREST DR&lt;br&gt; From: HILL CRES&lt;br&gt; To: 126 m S KINGSTON RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q2 2027 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Gabor Szakter, Engineering and Construction Services","CONTACT_EMAIL":"gszakte@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2160018161236, 43.7326164759918], [-79.2163601434489, 43.7334635169585], [-79.2168030092963, 43.7344996658417], [-79.2168560108698, 43.7346168040492], [-79.2168920709086, 43.7347068966001], [-79.2169281910265, 43.7347789868414], [-79.2169760101483, 43.7348421138179], [-79.2170331397785, 43.7349052548225], [-79.2170709813427, 43.7349413623901], [-79.217120492043, 43.7349774808229], [-79.2171629889811, 43.7350135818786], [-79.2172542146828, 43.7350858173603], [-79.2173153325771, 43.7351219644201], [-79.2174346168745, 43.7351672564791], [-79.2175228665972, 43.7352124807211], [-79.2176344472135, 43.7352487613112], [-79.2177204355849, 43.7352759683683], [-79.2178103219581, 43.7353031939855], [-79.2178677363071, 43.735303326717], [-79.217939116299, 43.7353034938839], [-79.2180096296964, 43.7353216703135], [-79.218097279361, 43.7353308787414], [-79.2181763758251, 43.7353400750145], [-79.218236893647, 43.7353402242139], [-79.2183215118655, 43.7353314225529], [-79.2184014623875, 43.7353226183309], [-79.2185365604216, 43.7353049396433], [-79.2186973276573, 43.73526933053], [-79.2188441836033, 43.7352246857499], [-79.2189389362038, 43.7352068983363], [-79.219049277768, 43.7351711647208]]}"},{"_id":16,"OBJECTID":3805,"PROJ_NUM":"TS2023-10_11-435","LAST_UPDATED_DATE":"2025-09-05","PROJECT":"Local Road Reconstruction","LOCATION":"AUGUSTA AVE&lt;br&gt; From: BALDWIN ST&lt;br&gt; To: NASSAU ST ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4020351709196, 43.6545084150726], [-79.4023360063203, 43.6552350637161]]}"},{"_id":17,"OBJECTID":3853,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"GLOS RD&lt;br&gt; From: [217 m E] CRENDON DR&lt;br&gt; To: [102 m E] CRENDON DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5710472360338, 43.6461883366375], [-79.5705531345606, 43.6463074246984], [-79.5700184387569, 43.6464403345883], [-79.5696500583489, 43.6465228501257], [-79.5696184821238, 43.6465299174304], [-79.5695556518524, 43.6465332321744], [-79.5695018433243, 43.6465344980888], [-79.5694553119934, 43.6465257770406]]}"},{"_id":18,"OBJECTID":3867,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"ELDERFIELD (W) CRES&lt;br&gt; From: [214 m S] INTERSECTION OF GLOS RD&lt;br&gt; To: INTERSECTION OF GLOS RD (WEST) ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5705531345606, 43.6463074246984], [-79.5699644486175, 43.6449820559555], [-79.569950975184, 43.6449503613773], [-79.5699256532528, 43.6448986009911], [-79.5699001594552, 43.6448696231707], [-79.5698584622288, 43.6448490535255], [-79.5698102179532, 43.6448479038179], [-79.5697497136972, 43.644856672079], [-79.5692202089961, 43.6449668736471]]}"},{"_id":19,"OBJECTID":3870,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"CRENDON DR&lt;br&gt; From: RENFORTH DR&lt;br&gt; To: ULVERSTON RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5735472787101, 43.6450960147083], [-79.5734067342066, 43.645183733373], [-79.5726480940779, 43.6456264282527], [-79.5725401743782, 43.6457056368159], [-79.5724136255698, 43.6458069554373], [-79.5722825017378, 43.645928439874], [-79.5721590625895, 43.6460601988693], [-79.5720382815079, 43.6461865462313], [-79.5719765759243, 43.6463008664614], [-79.5719517447579, 43.6463818043856], [-79.5719331878501, 43.6464852597759], [-79.571934293423, 43.6465807185777], [-79.5719553689536, 43.6467076155854], [-79.5719819640141, 43.6468165153791], [-79.5722359350537, 43.6473590385427], [-79.5724221361956, 43.6478042722849], [-79.5724750679686, 43.6478976999113], [-79.5725259658131, 43.6479592729722], [-79.5725810591525, 43.6480151364809], [-79.572626602396, 43.6480563788126], [-79.5726967035134, 43.6481088752199], [-79.57274736223, 43.6481465857148], [-79.5728347010313, 43.6482047869322]]}"},{"_id":20,"OBJECTID":3883,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"CARSBROOKE RD&lt;br&gt; From: RENFORTH DR&lt;br&gt; To: CRENDON DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5750768261459, 43.6455513628171], [-79.5750309328415, 43.6456370139653], [-79.5750186106458, 43.6456660964722], [-79.5749991704386, 43.6457326743468], [-79.5749852050328, 43.6458159551656], [-79.5749805069635, 43.6459055398623], [-79.5749930707301, 43.6460008381047], [-79.575158099437, 43.6463730532908], [-79.5752092252317, 43.6464273969257], [-79.5752746142088, 43.6464881311181], [-79.5753722529475, 43.6465356390083], [-79.5754522768387, 43.6465727528623], [-79.5755503440065, 43.6466058221244], [-79.5757384018772, 43.6466761513824], [-79.5758793483591, 43.6467403006679], [-79.5759263851694, 43.6467656532907], [-79.5759769129701, 43.6468069719982], [-79.5760176257969, 43.6468600619962], [-79.5760649480182, 43.6469248313552], [-79.5761103748911, 43.64701993656], [-79.5763675630712, 43.6476550634282], [-79.5766569860502, 43.648377490269]]}"},{"_id":21,"OBJECTID":3896,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-09-01","PROJECT":"Laneway Reconstruction","LOCATION":"[27.40 m W] BAY ST&lt;br&gt; From: TEMPERANCE ST&lt;br&gt; To: RICHMOND ST W ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2025","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Gabor Szakter, Engineering and Construction Services","CONTACT_EMAIL":"gszakte@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3815384546847, 43.6504649376741], [-79.3817994165711, 43.6510645453407]]}"},{"_id":22,"OBJECTID":4106,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-08-29","PROJECT":"Laneway Reconstruction","LOCATION":"[30.50 m N] WALLACE AVE&lt;br&gt; From: [33.50 m E] EMERSON AVE&lt;br&gt; To: EMERSON AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4425523348517, 43.6631192100523], [-79.4419968763231, 43.6632356139409]]}"},{"_id":23,"OBJECTID":4115,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-08-29","PROJECT":"Local Road Reconstruction","LOCATION":"HOLLAMAN RD&lt;br&gt; From: GLEN PARK AVE&lt;br&gt; To: [40 m N] GLEN PARK AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Matthew McAinsh, Engineering and Construction Services","CONTACT_EMAIL":"mmcains@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4294173872541, 43.7130262491248], [-79.4298163688248, 43.713266387425]]}"},{"_id":24,"OBJECTID":4121,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-08-31","PROJECT":"Local Road Rehabilitation","LOCATION":"FERNWOOD PARK AVE&lt;br&gt; From: FIR AVE&lt;br&gt; To: HAZEL AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2881650445252, 43.6703271470925], [-79.28817907089, 43.6704078969828], [-79.288402242705, 43.6709805696214], [-79.2884127267979, 43.6710213830359], [-79.2883999949919, 43.6710697145906], [-79.2883572749416, 43.6711330318403], [-79.2883355382896, 43.6711677547129], [-79.2883289174626, 43.6711991660805], [-79.2884618675573, 43.6714813967029]]}"},{"_id":25,"OBJECTID":4146,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-09-27","PROJECT":"Laneway Reconstruction","LOCATION":"[28.60 m W] YORK ST&lt;br&gt; From: [52 m S] RICHMOND ST W&lt;br&gt; To: RICHMOND ST W ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3851110950526, 43.6503416018767], [-79.3848953663775, 43.64980495776]]}"},{"_id":26,"OBJECTID":4208,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"MACPHERSON AVE&lt;br&gt; From: [N] DAVENPORT RD [BRANCH]&lt;br&gt; To: [15.20 m W] DAVENPORT RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4036901154487, 43.6766801405027], [-79.4040959591214, 43.6765933129411]]}"},{"_id":27,"OBJECTID":4234,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"MACPHERSON AVE&lt;br&gt; From: HURON ST&lt;br&gt; To: MADISON AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4051682329097, 43.6763638637588], [-79.4063298357469, 43.6761221369325]]}"},{"_id":28,"OBJECTID":4236,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Laneway Reconstruction","LOCATION":"[25 m N] ADELAIDE ST W&lt;br&gt; From: DUNCAN ST&lt;br&gt; To: [27.40 m W] DUNCAN ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3888050908619, 43.6485070685875], [-79.3892446723688, 43.6484187418791]]}"},{"_id":29,"OBJECTID":4259,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-03-24","PROJECT":"Major Road Reconstruction","LOCATION":"BLOOR ST W&lt;br&gt; From: AVENUE RD&lt;br&gt; To: BEDFORD RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2023 - Q2 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Gabor Szakter, Engineering and Construction Services","CONTACT_EMAIL":"gszakte@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2023","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3941414134514, 43.6687202589369], [-79.3958757476091, 43.6683327872883], [-79.3973807918684, 43.668033224743]]}"},{"_id":30,"OBJECTID":4261,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-05-09","PROJECT":"Major Road Rehabilitation","LOCATION":"DUNCAN ST&lt;br&gt; From: NELSON ST (TO)&lt;br&gt; To: RICHMOND ST W ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.388925478037, 43.6488121518102], [-79.3890432031838, 43.6491094371261], [-79.3891808446975, 43.6494570322239]]}"},{"_id":31,"OBJECTID":4286,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-05-05","PROJECT":"Laneway Reconstruction","LOCATION":"[30 m E] WINNIFRED AVE&lt;br&gt; From: [33.50 m N] EASTERN AVE&lt;br&gt; To: [35.10 m S] QUEEN ST E ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Jennifer Harris, Engineering and Construction Services","CONTACT_EMAIL":"Jennifer.Harris@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3348009845398, 43.6596999376606], [-79.3356450466796, 43.6616500351567]]}"},{"_id":32,"OBJECTID":4332,"PROJ_NUM":"TS2022-03-001","LAST_UPDATED_DATE":"2023-10-05","PROJECT":"Major Road Reconstruction","LOCATION":"THE QUEENSWAY EB&lt;br&gt; From: HUMBER RIVER&lt;br&gt; To: HIGH ST ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Javier Saborio, Engineering and Construction Services","CONTACT_EMAIL":"jsabori@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4754552395316, 43.6334533490097], [-79.4755693876717, 43.6333419092718], [-79.4758617892497, 43.6330631803836], [-79.4758652239016, 43.6330586984172], [-79.4762272235641, 43.6325859493058], [-79.4764116363256, 43.6323474506818], [-79.4766363100689, 43.6321134606808], [-79.4768806923387, 43.631928990865], [-79.4772145186581, 43.6317580224667], [-79.4777113538933, 43.631627600247], [-79.4782023849719, 43.6315376630157], [-79.4784018283628, 43.6315151883912], [-79.4800604441988, 43.631236401582], [-79.4803853633183, 43.631168929353], [-79.4808663401184, 43.631105992123], [-79.4815169179747, 43.6309710512775]]}"},{"_id":33,"OBJECTID":5055,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"STRATHEDEN RD&lt;br&gt; From: MILDENHALL RD&lt;br&gt; To: DANESWOOD RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3838624742361, 43.7217214375686], [-79.3814786554225, 43.7222201350774]]}"},{"_id":34,"OBJECTID":5118,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-12","PROJECT":"Major Road Rehabilitation","LOCATION":"KEELE ST&lt;br&gt; From: FINCH AVE W&lt;br&gt; To: STEELES AVE W ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2028 - Q4 2029","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Adel Roufail, Engineering and Construction Services","CONTACT_EMAIL":"aroufai@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4910534106917, 43.7635021618319], [-79.4916590072426, 43.7657154539496], [-79.4917365780998, 43.7660340923094], [-79.4918108229598, 43.76633904857], [-79.4920120363848, 43.7671656499246], [-79.4920222654122, 43.7672076501293], [-79.492047900111, 43.7673129206751], [-79.493239882162, 43.7719900697569], [-79.4939610215053, 43.7748195549116], [-79.4940388244767, 43.77516887618], [-79.4940486709766, 43.7752130724083], [-79.4940587288638, 43.7752553153938], [-79.4945741214528, 43.7774193374244], [-79.4946234878624, 43.7775764820146], [-79.494644673321, 43.7776642533217], [-79.4946494140464, 43.7777179724668], [-79.4946566120021, 43.7777997663438], [-79.4946727146158, 43.7779103103387], [-79.494673539604, 43.7779930400352], [-79.4946836080556, 43.7780664809643], [-79.4946870671965, 43.7781438190865], [-79.4946807377352, 43.7782137307961], [-79.4946841951784, 43.778310286391], [-79.4946792674925, 43.7784027370656], [-79.4946799162283, 43.7785119301534], [-79.4946774356893, 43.7786062171749], [-79.4946752401325, 43.7787088392807], [-79.4946483309748, 43.7788578882043], [-79.4945988005041, 43.7789927862305], [-79.4945677570928, 43.7791091067226], [-79.4945386905206, 43.7792069659241], [-79.49451858256, 43.7792871832778], [-79.4944932934262, 43.7793745742997], [-79.4944589457507, 43.7794832346104], [-79.4944443892125, 43.7795802213718], [-79.4944246656825, 43.7796651553286], [-79.4944073020011, 43.779755589103], [-79.4943710517996, 43.779879083193], [-79.4943572643785, 43.7799855211886], [-79.4943428945869, 43.7800752620069], [-79.4943343861934, 43.7801901253394], [-79.4943094544153, 43.7803014774016], [-79.4943066133911, 43.7803910297595], [-79.494303645952, 43.7805034630471], [-79.494314355508, 43.7806284176209], [-79.4943282711087, 43.7807454513334], [-79.4943429597538, 43.7808334833586], [-79.4943600083897, 43.7809269972003], [-79.4943742215297, 43.7810523839874], [-79.4944003842973, 43.7811979159398], [-79.4944274198736, 43.7813108097397], [-79.4944517339498, 43.7814327315563], [-79.4945063595238, 43.7815790749568]]}"},{"_id":35,"OBJECTID":5201,"PROJ_NUM":"TS2023-13-001","LAST_UPDATED_DATE":"2024-04-25","PROJECT":"Major Road Reconstruction","LOCATION":"GERRARD ST E&lt;br&gt; From: CENTRAL HOSPITAL LANE&lt;br&gt; To: SEATON ST ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2027 - Q1 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marilia Cimini, Engineering and Construction Services","CONTACT_EMAIL":"mcimini@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3714387971841, 43.6614023333006], [-79.3707022076572, 43.66156440883]]}"},{"_id":36,"OBJECTID":5292,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-12","PROJECT":"Major Road Rehabilitation","LOCATION":"DUPONT ST&lt;br&gt; From: MADISON AVE&lt;br&gt; To: [21.30 m E] SPADINA RD (TO) ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2027 - Q3 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Shahid Virk, Engineering and Construction Services","CONTACT_EMAIL":"svirk@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4059769610946, 43.6751085685439], [-79.406863209931, 43.6749142174187]]}"},{"_id":37,"OBJECTID":5312,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-16","PROJECT":"Local Road Rehabilitation","LOCATION":"SEATON ST&lt;br&gt; From: DUNDAS ST E&lt;br&gt; To: GERRARD ST E ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Angela Au, Engineering and Construction Services","CONTACT_EMAIL":"aau2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3695116514755, 43.6586590331536], [-79.3696886692746, 43.6590910476874], [-79.3701539004833, 43.6602263587056], [-79.3705442807723, 43.6611790626332], [-79.3707022076572, 43.66156440883]]}"},{"_id":38,"OBJECTID":5373,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Laneway Reconstruction","LOCATION":"BARBARA BARRETT LANE&lt;br&gt; From: BRUNSWICK AVE&lt;br&gt; To: BORDEN ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2024 - Q3 2024","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4073084412112, 43.6654935809231], [-79.4078890544622, 43.6653562307739], [-79.4085026779383, 43.665231830019]]}"},{"_id":39,"OBJECTID":5719,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-12-12","PROJECT":"Laneway Reconstruction","LOCATION":"LEADER LANE&lt;br&gt; From: WELLINGTON ST E&lt;br&gt; To: COLBORNE ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3751775434567, 43.6483447483396], [-79.3753269649034, 43.6486930841259], [-79.3754504279513, 43.6489765546027]]}"},{"_id":40,"OBJECTID":5779,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-06-28","PROJECT":"Major Road Rehabilitation","LOCATION":"WELLESLEY ST E&lt;br&gt; From: WELLESLEY PL&lt;br&gt; To: HOMEWOOD AVE (TO) ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Rooban Markandu, Engineering and Construction Services","CONTACT_EMAIL":"rmarkan2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3765008860927, 43.6664289240854], [-79.3763109933683, 43.6664296099067], [-79.3761593377928, 43.6664382670192], [-79.3760344117811, 43.6664551261323], [-79.3758529004957, 43.6664862717973]]}"},{"_id":41,"OBJECTID":5907,"PROJ_NUM":"TS2023-06_07-301","LAST_UPDATED_DATE":"2024-06-21","PROJECT":"Local Road Reconstruction","LOCATION":"SENTINEL RD&lt;br&gt; From: SHEPPARD AVE W&lt;br&gt; To: STILECROFT DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2024 - Q4 2025","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4918501582177, 43.7436491517555], [-79.4919846643781, 43.7439762473666], [-79.4919899394016, 43.7439890834666], [-79.4922405739252, 43.7445986178833], [-79.4922802047787, 43.744702557565], [-79.4923030002387, 43.7448018874779], [-79.4923257833592, 43.7449012083826], [-79.4923445013373, 43.7450410704662], [-79.4923770478825, 43.7452049757021], [-79.4924007103257, 43.7453240362997], [-79.4924013431428, 43.7453272407729], [-79.4925168772557, 43.7459087536129], [-79.4925853317996, 43.7469846546351], [-79.4926105768129, 43.7470666302759], [-79.4926272689012, 43.7471325021969], [-79.4926568590542, 43.7472206979404], [-79.4932497410605, 43.7486062813022], [-79.493603490296, 43.749357623262], [-79.4938019638052, 43.7497105624262], [-79.4941939982246, 43.7504412017153]]}"},{"_id":42,"OBJECTID":6045,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-04-11","PROJECT":"Laneway Reconstruction","LOCATION":"CHESTNUT LANE&lt;br&gt; From: [42 m S] CHESTNUT HILLS CRES&lt;br&gt; To: [66 m S] CHESTNUT HILLS CRES ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027 - 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Angela Au, Engineering and Construction Services","CONTACT_EMAIL":"aau2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.526026898589, 43.6527792115145], [-79.5263376062108, 43.6529222439307]]}"},{"_id":43,"OBJECTID":6501,"PROJ_NUM":"TS2023-24-430","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Major Road Reconstruction","LOCATION":"SCARBOROUGH GOLF CLUB RD&lt;br&gt; From: BRIMORTON DR&lt;br&gt; To: ELLESMERE RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Mehrshad Rahimi, Engineering and Construction Services","CONTACT_EMAIL":"mrahimi@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2186842194236, 43.7698112486013], [-79.2194785911463, 43.7717858786051], [-79.2200726425321, 43.7732636699038], [-79.2206551360403, 43.7747141379738], [-79.2210528104115, 43.7756809876262], [-79.2214293877347, 43.776605838924], [-79.2214704721378, 43.7766988849992], [-79.2222172150957, 43.7785568936147]]}"},{"_id":44,"OBJECTID":6512,"PROJ_NUM":"TS2023-11-186","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Local Road Reconstruction","LOCATION":"GLENROSE AVE&lt;br&gt; From: CLIFTON RD&lt;br&gt; To: [E] GLENROSE AVE [END] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3839793741641, 43.6892205415758], [-79.3832170227108, 43.6893831118357]]}"},{"_id":45,"OBJECTID":6518,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Local Road Rehabilitation","LOCATION":"WALES AVE&lt;br&gt; From: BELLEVUE AVE&lt;br&gt; To: LEONARD AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4029094168243, 43.6530886840643], [-79.403221476101, 43.6530196292322], [-79.4033423468029, 43.6529970300757], [-79.4042150511109, 43.652833894951]]}"},{"_id":46,"OBJECTID":6634,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-08-14","PROJECT":"Major Road Rehabilitation","LOCATION":"GREENWOOD AVE&lt;br&gt; From: GLEBEHOLME BLVD&lt;br&gt; To: MILVERTON BLVD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Promil Sarkar, Engineering and Construction Services","CONTACT_EMAIL":"psarkar@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.333418931461, 43.6839276552859], [-79.33375881088, 43.6847137030437]]}"},{"_id":47,"OBJECTID":6641,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-08-14","PROJECT":"Major Road Rehabilitation","LOCATION":"GREENWOOD AVE&lt;br&gt; From: [34.60 m N] MILVERTON BLVD&lt;br&gt; To: SPRINGDALE BLVD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Promil Sarkar, Engineering and Construction Services","CONTACT_EMAIL":"psarkar@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3339042258784, 43.6850841471032], [-79.334063761933, 43.6854622175555]]}"},{"_id":48,"OBJECTID":6659,"PROJ_NUM":"TS2024-10_11-027","LAST_UPDATED_DATE":"2025-03-19","PROJECT":"Major Road Rehabilitation","LOCATION":"[E] UNIVERSITY AVE [BRANCH]&lt;br&gt; From: DUNDAS ST W&lt;br&gt; To: EDWARD ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2027 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Newsha Roshani, Engineering and Construction Services","CONTACT_EMAIL":"nroshan@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3881457916216, 43.6548243888637], [-79.3882868814965, 43.6551417615208], [-79.3884527438773, 43.6555123741572]]}"},{"_id":49,"OBJECTID":6714,"PROJ_NUM":"TS2023-11-436","LAST_UPDATED_DATE":"2025-09-05","PROJECT":"Local Road Reconstruction","LOCATION":"BALDWIN ST&lt;br&gt; From: KENSINGTON AVE (TO)&lt;br&gt; To: AUGUSTA AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4007089263197, 43.6547691742142], [-79.4015134758732, 43.6546146958575], [-79.4020351709196, 43.6545084150726]]}"},{"_id":50,"OBJECTID":6716,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"COPPERFIELD RD&lt;br&gt; From: MANSE RD&lt;br&gt; To: [550 m E] MANSE RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q4 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.1717492025535, 43.7598266896592], [-79.1702954390999, 43.7601015599199], [-79.169086453548, 43.7603231135405], [-79.1678579609302, 43.7605626090377], [-79.1666351856069, 43.7607481009138], [-79.1658636171885, 43.7608898847661], [-79.1645153900769, 43.7611559797411], [-79.1640918013513, 43.7612537575955], [-79.1640467313644, 43.7612626263076], [-79.1636322800481, 43.7613407707396], [-79.1634380210971, 43.7613774097512], [-79.1632032891743, 43.7614202930105], [-79.1627937653417, 43.7614963786478], [-79.1627118031289, 43.7615107457182], [-79.162585225103, 43.761519382294], [-79.1624423530227, 43.7615279616072], [-79.1624092385995, 43.7615264866228], [-79.1621883639978, 43.7615166618192]]}"},{"_id":51,"OBJECTID":6730,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"REGENT ST&lt;br&gt; From: SHUTER ST&lt;br&gt; To: SUTTON AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3635196592143, 43.6572869098539], [-79.3636245840741, 43.6575166144818], [-79.3637305759474, 43.6577737383835], [-79.3637847232498, 43.6579141519399]]}"},{"_id":52,"OBJECTID":6854,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2025-08-21","PROJECT":"Local Road Reconstruction","LOCATION":"ST LEONARDS AVE&lt;br&gt; From: LEWES CRES&lt;br&gt; To: BAYVIEW AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3840849904893, 43.7247559652186], [-79.3821241676272, 43.7251647406227], [-79.3811784960871, 43.7253741475065], [-79.3811055684622, 43.7253902919103], [-79.3802036347488, 43.7255848031466]]}"},{"_id":53,"OBJECTID":7286,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-11-17","PROJECT":"Local Road Rehabilitation","LOCATION":"WALES AVE&lt;br&gt; From: LEONARD AVE&lt;br&gt; To: CARLYLE ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4042150511109, 43.652833894951], [-79.4046340390871, 43.6527447177591], [-79.4046965946901, 43.6527289365414], [-79.4047441872224, 43.652713043807], [-79.4048000409757, 43.6526783991049]]}"},{"_id":54,"OBJECTID":7760,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-02-18","PROJECT":"Local Road Reconstruction","LOCATION":"BRAESIDE RD&lt;br&gt; From: LANGTON AVE&lt;br&gt; To: [N-S] BRAESIDE RD [BRANCH] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.392398244456, 43.7305233017995], [-79.3914338830123, 43.7307240895429], [-79.3913668857434, 43.730726150179], [-79.3913186972822, 43.7307197134944]]}"},{"_id":55,"OBJECTID":7766,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Laneway Reconstruction","LOCATION":"[44.50 m N] DUNDAS ST W&lt;br&gt; From: [95.40 m E] HURON ST&lt;br&gt; To: HURON ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3958991799977, 43.6539042939077], [-79.3963577254249, 43.6538134548248]]}"},{"_id":56,"OBJECTID":7768,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Laneway Reconstruction","LOCATION":"[46.30 m N] DUNDAS ST W&lt;br&gt; From: [42.70 m W] BEVERLEY ST&lt;br&gt; To: [95.40 m E] HURON ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3945509554386, 43.6541713705789], [-79.3958991799977, 43.6539042939077]]}"},{"_id":57,"OBJECTID":7795,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2026-03-11","PROJECT":"Local Road Reconstruction","LOCATION":"BRAESIDE CRES&lt;br&gt; From: BRAESIDE RD&lt;br&gt; To: [1 m E] BRAESIDE RD [CITY LIMITS] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3905438770258, 43.7291351168728], [-79.3904295300146, 43.7291558091729]]}"},{"_id":58,"OBJECTID":7887,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Laneway Reconstruction","LOCATION":"[46.30 m N] DUNDAS ST W&lt;br&gt; From: BEVERLEY ST&lt;br&gt; To: [42.70 m W] BEVERLEY ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3940517146883, 43.6542702749187], [-79.3945509554386, 43.6541713705789]]}"},{"_id":59,"OBJECTID":7888,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Local Road Reconstruction","LOCATION":"ORCHARD PARK DR&lt;br&gt; From: KINGSTON RD&lt;br&gt; To: WEST HILL DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.1793273642884, 43.7746799796424], [-79.1793724937914, 43.7747707119138], [-79.1794136491163, 43.7748287408119], [-79.1794531611877, 43.7748595365825], [-79.1795028849331, 43.7748832500598], [-79.1795664274775, 43.7748966779302], [-79.1796418052101, 43.7748990765158], [-79.1798225575913, 43.7749043986306], [-79.1804253842324, 43.7748996589477], [-79.1810603954493, 43.774904520126], [-79.1817180586851, 43.7749199272084]]}"},{"_id":60,"OBJECTID":7889,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Laneway Reconstruction","LOCATION":"[43.30 m N] DUNDAS ST W&lt;br&gt; From: HURON ST&lt;br&gt; To: [79.20 m W] HURON ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3963577254249, 43.6538134548248], [-79.397450075485, 43.6535784964466]]}"},{"_id":61,"OBJECTID":7946,"PROJ_NUM":"TS2024-02-033","LAST_UPDATED_DATE":"2026-01-14","PROJECT":"Major Road Reconstruction","LOCATION":"RATHBURN RD&lt;br&gt; From: MILL RD&lt;br&gt; To: DEAD END ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Brian Nolan, Engineering and Construction Services","CONTACT_EMAIL":"bnolan3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5900630194625, 43.6455117700085], [-79.5902383795473, 43.6453794556221], [-79.59041793303, 43.6452501351028], [-79.590601556037, 43.6451238625376], [-79.5907616613967, 43.6449710813136], [-79.5909144095462, 43.6448143721142], [-79.591059602473, 43.6446539241551], [-79.5911205103765, 43.6445945655963], [-79.5911747444207, 43.6445318728191], [-79.591221958175, 43.6444662601725], [-79.5912618671904, 43.6443981419552]]}"},{"_id":62,"OBJECTID":7985,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-11","PROJECT":"Laneway Reconstruction","LOCATION":"Alan Borovoy Lane&lt;br&gt; From: [39.3 m E] GRACE ST (TO)&lt;br&gt; To: JERSEY AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4152006202104, 43.6554195698455], [-79.4164095679113, 43.6585765587381], [-79.4163697556904, 43.658595495459]]}"},{"_id":63,"OBJECTID":8037,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-01","PROJECT":"Local Road Rehabilitation","LOCATION":"PENROSE RD&lt;br&gt; From: DE-SAVERY CRES&lt;br&gt; To: MOUNT PLEASANT RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Amran Durrani, Engineering and Construction Services","CONTACT_EMAIL":"adurran2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3895303381268, 43.703038049559], [-79.3881569234653, 43.7032932683905]]}"},{"_id":64,"OBJECTID":8118,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-19","PROJECT":"Local Road Reconstruction","LOCATION":"RIDELLE AVE&lt;br&gt; From: LAWNHURST BLVD&lt;br&gt; To: BURMONT RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4306603407718, 43.7063224609686], [-79.4318104813828, 43.7060823778297]]}"},{"_id":65,"OBJECTID":8120,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-07-14","PROJECT":"Laneway Reconstruction","LOCATION":"[34.40 m N] AUBURN AVE&lt;br&gt; From: [45.70 m W] VIA ITALIA&lt;br&gt; To: [143.30 m W] VIA ITALIA ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4465894602968, 43.6749583057522], [-79.4463538719082, 43.6750084228117], [-79.4454613957762, 43.6752205217023]]}"},{"_id":66,"OBJECTID":8134,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-07-14","PROJECT":"Laneway Reconstruction","LOCATION":"[33.50 m W] DUFFERIN ST&lt;br&gt; From: WALLACE AVE&lt;br&gt; To: ARMSTRONG AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4375930489394, 43.6637435715708], [-79.4377521932244, 43.6641522741532], [-79.4379324125262, 43.6646151669866]]}"},{"_id":67,"OBJECTID":8158,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-07-14","PROJECT":"Laneway Reconstruction","LOCATION":"[40 m S] ST CLAIR AVE W&lt;br&gt; From: [39 m E] LANSDOWNE AVE (TO)&lt;br&gt; To: LANSDOWNE AVE (TO) ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4503959589611, 43.6758632675313], [-79.4499284293042, 43.6759758592464]]}"},{"_id":68,"OBJECTID":8159,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-07-14","PROJECT":"Laneway Reconstruction","LOCATION":"[87.20 m N] DAVENPORT RD&lt;br&gt; From: GREENLAW AVE&lt;br&gt; To: ST CLARENS AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4464401812318, 43.6729095345887], [-79.4464681359274, 43.6728510030618], [-79.4465036880802, 43.6728113868685], [-79.4465549637254, 43.6727870172607], [-79.4471822098812, 43.6726508216981], [-79.4478080640224, 43.6725149190985]]}"},{"_id":69,"OBJECTID":8220,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-20","PROJECT":"Local Road Reconstruction","LOCATION":"CHEMICAL CRT&lt;br&gt; From: [305 m S] CORONATION DR [CUL-DE-SAC]&lt;br&gt; To: CORONATION DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.1620622834549, 43.7627011681241], [-79.1622774270189, 43.7632646925945], [-79.162553098702, 43.7639405949701], [-79.1629828744996, 43.7649679518647], [-79.1632110524219, 43.7655356803347]]}"},{"_id":70,"OBJECTID":8262,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-07-14","PROJECT":"Local Road Rehabilitation","LOCATION":"MERRILL AVE E&lt;br&gt; From: MOBERLY AVE&lt;br&gt; To: WOODBINE AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3131251750712, 43.6831350216193], [-79.3123878269936, 43.6833013281381], [-79.3118424404499, 43.6834243527039]]}"},{"_id":71,"OBJECTID":8346,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-03-24","PROJECT":"Major Road Reconstruction","LOCATION":"BLOOR ST W&lt;br&gt; From: MADISON AVE&lt;br&gt; To: SPADINA RD (TO) ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2023 - Q2 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Gabor Szakter, Engineering and Construction Services","CONTACT_EMAIL":"gszakte@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2023","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.402707177037, 43.6669054424105], [-79.4038707378977, 43.6666572968676]]}"},{"_id":72,"OBJECTID":8385,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"MONET AVE&lt;br&gt; From: CRENDON DR&lt;br&gt; To: [106 m N] CRENDON DR [CUL-DE-SAC] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.576161991601, 43.64850164389], [-79.5763104720179, 43.6491863955975], [-79.576304693467, 43.6492632530899], [-79.5762401209301, 43.6493415720227], [-79.5761833521316, 43.6493956900553], [-79.576199125061, 43.6494583020211]]}"},{"_id":73,"OBJECTID":8393,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"ENDWOOD RD&lt;br&gt; From: HERNSHAW CRES&lt;br&gt; To: CARSBROOKE RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5744847640319, 43.6473063416176], [-79.5750229731508, 43.6471893769751], [-79.5751702051006, 43.6471444264485], [-79.5752968173529, 43.6471052861951], [-79.5754251607403, 43.6470430381521], [-79.5755554509572, 43.6469815447924], [-79.5756538246005, 43.6469224217669], [-79.5757335629652, 43.6468698549968], [-79.5758793483591, 43.6467403006679]]}"},{"_id":74,"OBJECTID":8425,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"MACPHERSON AVE&lt;br&gt; From: SPADINA RD (TO)&lt;br&gt; To: WALMER RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4074931331621, 43.675869175016], [-79.4080897418853, 43.6757501997433], [-79.4086770688533, 43.6756331312206]]}"},{"_id":75,"OBJECTID":8554,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"CASTLEFIELD AVE&lt;br&gt; From: YONGE ST&lt;br&gt; To: DUPLEX AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3994765853598, 43.7118389681081], [-79.3999992591552, 43.7117357590166], [-79.4012583561257, 43.7114871495535]]}"},{"_id":76,"OBJECTID":8590,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-05-05","PROJECT":"Laneway Reconstruction","LOCATION":"[30.50 m S] QUEEN ST E&lt;br&gt; From: WINNIFRED AVE&lt;br&gt; To: CAROLINE AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Jennifer Harris, Engineering and Construction Services","CONTACT_EMAIL":"Jennifer.Harris@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3361505131173, 43.661535372578], [-79.3356450466796, 43.6616500351567], [-79.3351735929746, 43.6617449235912]]}"},{"_id":77,"OBJECTID":8608,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-05-09","PROJECT":"Local Road Rehabilitation","LOCATION":"ROSLIN AVE&lt;br&gt; From: RONAN AVE&lt;br&gt; To: [230 m E] RONAN AVE [END] ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3956034387069, 43.7309998740782], [-79.3930131069614, 43.7315380028924], [-79.3928150263147, 43.731587846165], [-79.3927290919417, 43.7316280010566]]}"},{"_id":78,"OBJECTID":8631,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"MACPHERSON AVE&lt;br&gt; From: WALMER RD&lt;br&gt; To: KENDAL AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4086770688533, 43.6756331312206], [-79.4092068145149, 43.6755228459601], [-79.4095428699455, 43.675452857072], [-79.4096177186593, 43.6754334014128], [-79.4096551328811, 43.67542628394], [-79.409678105805, 43.6754229716053], [-79.4097122214199, 43.6754239526964]]}"},{"_id":79,"OBJECTID":8694,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-05-19","PROJECT":"Local Road Reconstruction","LOCATION":"AMHERST AVE&lt;br&gt; From: GLENHOLME AVE&lt;br&gt; To: LAUDER AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4434416205023, 43.6907768725402], [-79.4445525376391, 43.6905352909096]]}"},{"_id":80,"OBJECTID":8718,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-05-19","PROJECT":"Local Road Reconstruction","LOCATION":"AMHERST AVE&lt;br&gt; From: LAUDER AVE&lt;br&gt; To: NORTHCLIFFE BLVD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4446388173265, 43.6907330372263], [-79.4457500166615, 43.6904886806941]]}"},{"_id":81,"OBJECTID":8975,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"LEWES CRES&lt;br&gt; From: ST LEONARDS AVE&lt;br&gt; To: ST LEONARDS AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3840849904893, 43.7247559652186], [-79.3841050458194, 43.7248343953812], [-79.3840878612609, 43.7249536354199], [-79.3840740005087, 43.7250613122282], [-79.3839519999304, 43.7258025937137], [-79.3833269037246, 43.7259424847388], [-79.3832502465853, 43.7259488153497], [-79.3831977290607, 43.7259497608335], [-79.3831326653616, 43.7259366605314], [-79.3830968812741, 43.7259302510601], [-79.3830435490622, 43.7259097456824], [-79.3829742901323, 43.7258711494827], [-79.3829154798024, 43.7258338241178], [-79.3828594302049, 43.7257874733069], [-79.3828143235459, 43.7257434830115], [-79.3827678208164, 43.7256961968118], [-79.3827165346782, 43.7256259435178], [-79.3826783706037, 43.7255671712511], [-79.3826381214641, 43.7254956420708], [-79.3826162405023, 43.7254440514883], [-79.3825885566248, 43.7254021672804], [-79.3825426302295, 43.7253523522294], [-79.3824755570275, 43.7253072770755], [-79.3824204788216, 43.7252787224994], [-79.3823445978032, 43.7252440256408], [-79.3822769680503, 43.7252170872997], [-79.3821241676272, 43.7251647406227]]}"},{"_id":82,"OBJECTID":9156,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-05","PROJECT":"Local Road Rehabilitation","LOCATION":"EUCLID AVE (TO)&lt;br&gt; From: ROBINSON ST&lt;br&gt; To: DUNDAS ST W ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Angela Au, Engineering and Construction Services","CONTACT_EMAIL":"aau2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4083232916074, 43.6480868943883], [-79.4083917312743, 43.6482331044052], [-79.4092085891003, 43.6502714755365], [-79.4093284593465, 43.6505709019254], [-79.4097223501886, 43.6515546842261]]}"},{"_id":83,"OBJECTID":9256,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"ROTHMERE DR&lt;br&gt; From: BRAESIDE RD&lt;br&gt; To: MILDENHALL RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3902974325337, 43.728442046429], [-79.3902137740732, 43.7284405619134], [-79.3886777086639, 43.7287698536664], [-79.3885095242974, 43.7288058117051], [-79.3883398247123, 43.7288421280654], [-79.3881624247943, 43.7288873928696], [-79.3879871415136, 43.7289490237201], [-79.3878278974914, 43.7290094008682], [-79.3868903124324, 43.7293062828007]]}"},{"_id":84,"OBJECTID":9411,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"DANESWOOD RD&lt;br&gt; From: GLENALLAN RD&lt;br&gt; To: STRATHEDEN RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3814786554225, 43.7222201350774], [-79.3814653408105, 43.7222627961818], [-79.3814612286698, 43.7223466475317], [-79.3814808420112, 43.7224708580688], [-79.3815234363396, 43.7226921078535], [-79.3815864330029, 43.7229965322592], [-79.3816147983447, 43.7231452442143]]}"},{"_id":85,"OBJECTID":9578,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Laneway Reconstruction","LOCATION":"[30.50 m E] JONES AVE&lt;br&gt; From: [23.20 m N] QUEEN ST E&lt;br&gt; To: [115.10 m N] QUEEN ST E ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2023 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Jessica Orjuela, Engineering and Construction Services","CONTACT_EMAIL":"jorjuel@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2023","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3324316797541, 43.6631086278506], [-79.332737304553, 43.6638731180819]]}"},{"_id":86,"OBJECTID":9695,"PROJ_NUM":"TS2023-13-001","LAST_UPDATED_DATE":"2024-04-25","PROJECT":"Major Road Reconstruction","LOCATION":"GERRARD ST E&lt;br&gt; From: SHERBOURNE ST&lt;br&gt; To: CENTRAL HOSPITAL LANE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2027 - Q1 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marilia Cimini, Engineering and Construction Services","CONTACT_EMAIL":"mcimini@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3722361278757, 43.6612269179245], [-79.3714387971841, 43.6614023333006]]}"},{"_id":87,"OBJECTID":9699,"PROJ_NUM":"TS2023-13-001","LAST_UPDATED_DATE":"2024-04-25","PROJECT":"Major Road Reconstruction","LOCATION":"GERRARD ST E&lt;br&gt; From: [N] GERRARD ST E [BRANCH]&lt;br&gt; To: PARLIAMENT ST ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2027 - Q1 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marilia Cimini, Engineering and Construction Services","CONTACT_EMAIL":"mcimini@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3681759569219, 43.6621129637347], [-79.3670355368209, 43.6619503748952]]}"},{"_id":88,"OBJECTID":9711,"PROJ_NUM":"TS2023-15-006","LAST_UPDATED_DATE":"2024-06-28","PROJECT":"Local Road Reconstruction","LOCATION":"BRIDLE PATH THE&lt;br&gt; From: [350 m E] BAYVIEW AVE&lt;br&gt; To: BAYVIEW AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2024 - Q2 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Matthew McAinsh, Engineering and Construction Services","CONTACT_EMAIL":"mmcains@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3822969055552, 43.7385257348016], [-79.3809399627229, 43.7388084709475], [-79.3781692763501, 43.7393685596219], [-79.3780820753161, 43.7393863340636]]}"},{"_id":89,"OBJECTID":9719,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"GLENALLAN RD&lt;br&gt; From: MILDENHALL RD&lt;br&gt; To: DANESWOOD RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3842067691312, 43.722607167525], [-79.3816147983447, 43.7231452442143]]}"},{"_id":90,"OBJECTID":9739,"PROJ_NUM":"TS2023-11-447","LAST_UPDATED_DATE":"2024-06-28","PROJECT":"Local Road Reconstruction","LOCATION":"RAMSDEN PARK RD&lt;br&gt; From: YONGE ST&lt;br&gt; To: [126 m W] YONGE ST [END] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2024 - Q3 2024","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3895728256234, 43.6770385979586], [-79.3900593443853, 43.6769302949809], [-79.3911833569015, 43.6766801076844]]}"},{"_id":91,"OBJECTID":9741,"PROJ_NUM":"TS2023-11-029","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Rehabilitation","LOCATION":"HERRICK ST&lt;br&gt; From: MARKHAM ST&lt;br&gt; To: PALMERSTON BLVD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2024 - Q3 2024","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4114576674163, 43.6624292946305], [-79.4126645565832, 43.6621692831635]]}"},{"_id":92,"OBJECTID":9742,"PROJ_NUM":"TS2023-04-089","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Rehabilitation","LOCATION":"EVANS AVE (TO)&lt;br&gt; From: COLBECK ST&lt;br&gt; To: ARDAGH ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4838654338598, 43.6534273781889], [-79.4850005367811, 43.6561965473737]]}"},{"_id":93,"OBJECTID":9745,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"DAWLISH AVE&lt;br&gt; From: FIDELIA AVE&lt;br&gt; To: DANESWOOD RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3873757513116, 43.7229736511852], [-79.3870839389788, 43.7230690285251], [-79.3865960503019, 43.7231698185283], [-79.384601398725, 43.7235922398672], [-79.3819177659893, 43.7241363696007]]}"},{"_id":94,"OBJECTID":9752,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"PEMBURY AVE&lt;br&gt; From: ST LEONARDS AVE&lt;br&gt; To: LAWRENCE BAYVIEW S [RAMP] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3811784960871, 43.7253741475065], [-79.3813193297277, 43.7259049620102], [-79.3813273725289, 43.7259176621106], [-79.3813346701105, 43.7259306134715], [-79.38134109844, 43.7259437709581], [-79.3813467815133, 43.7259571977079], [-79.3813516079766, 43.7259707135806], [-79.3813556521597, 43.7259843906634], [-79.3813589887124, 43.7259981390215], [-79.3813613196016, 43.7260120303555], [-79.3813628932819, 43.7260259569084], [-79.3813636104205, 43.7260399365797], [-79.3813635826901, 43.7260539874878], [-79.3813626863777, 43.7260679024758], [-79.3813609211275, 43.726081861568], [-79.3813582872407, 43.7260957117436], [-79.3813549087492, 43.7261094981376], [-79.3813515309491, 43.7261229334837], [-79.3813473529078, 43.7261393384085]]}"},{"_id":95,"OBJECTID":9767,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"WANLESS CRES&lt;br&gt; From: ST IVES AVE&lt;br&gt; To: [E] BUCKINGHAM AVE [CITY LIMITS] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3904034001557, 43.7265557765058], [-79.3903233015367, 43.7265842966165], [-79.3902424601454, 43.726611699804], [-79.3901487571157, 43.7266540326325], [-79.3900433497555, 43.7267028350178], [-79.3899831159807, 43.7267351005106], [-79.3899295504965, 43.7267657521699], [-79.3898944086842, 43.7267875103252], [-79.3898762510853, 43.7268001935821], [-79.3898692267705, 43.7268063976698]]}"},{"_id":96,"OBJECTID":9770,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"CHELTENHAM AVE&lt;br&gt; From: ST IVES AVE&lt;br&gt; To: [20.30 m E] ST IVES AVE [CITY LIMITS] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3900333592237, 43.725609705729], [-79.3898172073601, 43.7256413709687], [-79.3896602348663, 43.7256736510194]]}"},{"_id":97,"OBJECTID":9772,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"BAYVIEW WOOD&lt;br&gt; From: MILDENHALL RD&lt;br&gt; To: [65.97 m N/E] ST AUBYNS CRES [END] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"MultiLineString\", \"coordinates\": [[[-79.3847640639279, 43.7267010730059], [-79.384138200005, 43.726861895553]], [[-79.384138200005, 43.726861895553], [-79.3840794627758, 43.726863024163], [-79.3839893134784, 43.7268687745063], [-79.3838939619531, 43.7268817024836], [-79.3838133665053, 43.7269021524152], [-79.3837559843495, 43.7269149928489], [-79.3836793135847, 43.7269213327337], [-79.3833170314394, 43.7274539628478]], [[-79.3861569171003, 43.7274497606314], [-79.3860389352604, 43.7274833797049], [-79.3860152524096, 43.7274898819883], [-79.3858896956212, 43.7275251855863], [-79.3857917707012, 43.7275398948213], [-79.3856926003849, 43.727563288922], [-79.3855810779135, 43.7275810447984], [-79.3854543417122, 43.7275901801369], [-79.3853566340288, 43.727581990066], [-79.3852439251424, 43.7275579516734], [-79.3851618859225, 43.7275282462032], [-79.3850870334993, 43.7274920940113], [-79.3850174204961, 43.7274487820549], [-79.3849447330767, 43.7273905339062], [-79.3848806660257, 43.7273291439594], [-79.384824267731, 43.7272624419714], [-79.3847689025478, 43.7271943007981], [-79.3847220141521, 43.7271266722161], [-79.3846866645541, 43.7270744833795], [-79.3846479290482, 43.7270338757094], [-79.3845997778328, 43.7269905581485], [-79.3845474823424, 43.726952988173], [-79.3844854151108, 43.7269235994263], [-79.3844204562971, 43.7269068994696], [-79.3843534191599, 43.7268930597673], [-79.3843136901914, 43.7268851254772], [-79.3842554805997, 43.7268765153704], [-79.3841699504768, 43.7268620087434], [-79.3841499797502, 43.7268616554582], [-79.384138200005, 43.726861895553]]]}"},{"_id":98,"OBJECTID":9822,"PROJ_NUM":"TS2023-04-089","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Rehabilitation","LOCATION":"EVANS AVE (TO)&lt;br&gt; From: ARDAGH ST&lt;br&gt; To: ANNETTE ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4850005367811, 43.6561965473737], [-79.4853256404639, 43.6569701657164], [-79.4858924421021, 43.6583188823097], [-79.4860496016982, 43.6586927636036]]}"},{"_id":99,"OBJECTID":9831,"PROJ_NUM":"TS2023-12-009","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Rehabilitation","LOCATION":"ARCHER RD&lt;br&gt; From: BROWSIDE AVE&lt;br&gt; To: SPADINA RD (TO) ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2024 - Q3 2024","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4150224213017, 43.6962829755516], [-79.4157924511157, 43.6960867232343]]}"},{"_id":100,"OBJECTID":9852,"PROJ_NUM":"TS2023-04-223","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Rehabilitation","LOCATION":"MARGDON RD&lt;br&gt; From: KENNEDY PARK RD&lt;br&gt; To: GLENDONWYNNE RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4732038824349, 43.6527118116551], [-79.4732867761136, 43.6526117989681], [-79.4733498884419, 43.6525856737559], [-79.4734186867408, 43.6525690642662], [-79.4743810547998, 43.652361793689]]}"}], "fields": [{"id": "_id", "type": "int"}, {"id": "OBJECTID", "type": "int4", "info": {"notes": "Unique row identifier"}}, {"id": "PROJ_NUM", "type": "text", "info": {"notes": ""}}, {"id": "LAST_UPDATED_DATE", "type": "date", "info": {"notes": "The most recent date on which the project information was revised or updated"}}, {"id": "PROJECT", "type": "text", "info": {"notes": "Road Construction"}}, {"id": "LOCATION", "type": "text", "info": {"notes": "The name, beginning and end of the street where the road reconstruction project is located"}}, {"id": "DETAILS", "type": "text", "info": {"notes": "Project scope summary"}}, {"id": "DURATION/ Construction Timeline", "type": "text", "info": {"notes": "The year in which the project begins and ends"}}, {"id": "STATUS", "type": "text", "info": {"notes": "The status of the project"}}, {"id": "INV_PRIORITY", "type": "text", "info": {"notes": ""}}, {"id": "OWNER", "type": "text", "info": {"notes": "Owner of all road reconstruction projects is Transportation Services"}}, {"id": "CONTACT_NAME", "type": "text", "info": {"notes": "Contact person information"}}, {"id": "CONTACT_EMAIL", "type": "text", "info": {"notes": "Contact email address"}}, {"id": "INV_WEB_SITE", "type": "text", "info": {"notes": ""}}, {"id": "INV_DISPLAY_PROGRAM", "type": "text", "info": {"notes": ""}}, {"id": "INV_DISPLAY_SYMBOL", "type": "text", "info": {"notes": ""}}, {"id": "START_YEAR", "type": "text", "info": {"notes": "The year in which the project begins"}}, {"id": "CONTR_NUMBER", "type": "text", "info": {"notes": ""}}, {"id": "geometry", "type": "text", "info": {"notes": ""}}], "_links": {"start": "/api/action/datastore_search?resource_id=40d94b5a-cbf2-4e04-8d48-24038d163d0c", "next": "/api/action/datastore_search?resource_id=40d94b5a-cbf2-4e04-8d48-24038d163d0c&offset=100"}, "total": 333, "total_was_estimated": false}}