{
  "fields": [{"id":"_id","type":"int"},{"id":"No.","type":"text","info":{"notes":"Unique identifier"}},{"id":"Name and Construction Contract Number","type":"text","info":{"notes":"Name and contract number of the project"}},{"id":"Type of Work","type":"text","info":{"notes":"Category of the work involved"}},{"id":"Scope of Work: Detailed Description","type":"text","info":{"notes":"Additional details for the project's statement of work"}},{"id":"Delivery Division","type":"text","info":{"notes":"City division associated with delivering the project"}},{"id":"Project Owner (Division)","type":"text","info":{"notes":"City division associated with owning the project"}},{"id":"Target Sourcing Year","type":"text","info":{"notes":"Target year for sourcing"}},{"id":"Target Award Year","type":"text","info":{"notes":"Target year to award a contract"}},{"id":"Sourcing Type","type":"text","info":{"notes":"Type of sourcing. Values include RFP, RFT, and RFSQ"}},{"id":"Estimated Range","type":"text","info":{"notes":"Estimated range of award associated with the contract"}},{"id":"Estimated Contract Term (Months)","type":"text","info":{"notes":"Estimated number of months of duration of the contract"}}],
  "records": [
    [1,"1","Sewage Pumping Station Planning and Environmental Assessment Study Swansea, Southport, and Ellis Pumping Stations - CWD-26-03","Engineering","Planning and Environmental Assessment study to identify required upgrades at the Swansea, Southport, and Ellis Sewage Pumping Stations to accommodate projected population growth to 2051.","Toronto Water","Toronto Water","2026","2026","RFP","Up to $5M","24"],
    [2,"2","Dufferin Transfer Station - Paving & Dufferin Yard Material Storage - 25SWM-IRM-042CDU","Construction","Dufferin Transfer Station - Paving & Dufferin Yard Material Storage Paving works","Solid Waste Management Services","Solid Waste Management Services","2026","2027","RFT","Up to $5M","12"],
    [3,"3","Dufferin Transfer Station - Compactors Replacement  - 25ECS-MI-02SW","Construction","Compactors Replacement works at Dufferin Transfer Station","Engineering & Construction Services / Solid Waste Management Services","Solid Waste Management Services","2026","2027","RFT","$5M to $50M","18"],
    [4,"4","Dufferin Transfer Station office building Facility - 26ECS-MI-03SW","Construction","New Office building construction at Dufferin Transfer Station","Engineering & Construction Services / Solid Waste Management Services","Solid Waste Management Services","2026","2027","nRFP","Over $50M","41"],
    [5,"5","Basement Flooding Protection Program - 23ECS-LU-02FP","Construction","Basement Flooding Protection Program, Phase 4, Assignment 39-03, 39-04, 39-07 and 39-08: Storm and sanitary sewer upgrades, watermain replacement and other related improvements on Martin Grove Road, Jeffcoat Drive, Bairstow Crescent, Rosefair Crescent, Kearney Drive, Mercury Road, Braddock Road, Porterfield Road, Clearbrooke Circle, Coppermill Drive, Barrhead Crescent, Redcliff Boulevard, Frost Street, Redwater Drive, Circklewood Road, Hardisty Drive and Stavely Crescent (WIM-BFPP4-Area 39-03/04/07/08)","Engineering & Construction Services","Toronto Water","2026","2026","RFSQ Work Assignment/RFT","$5M to $50M","36"],
    [6,"6","Basement Flooding Protection Program Work - 25ECS-LU-01FP","Construction","Basement Flooding Protection Program Phase 5, Assignments 38-15/16/17: Storm and sanitary sewer upgrades, watermain replacement and other related improvements on Etobicoke Valley Park, Westhead Road, Savona Drive, Ecker Drive, Gair Drive, Rufford Road, Helsby Crescent, West Mall, Horner Avenue, Dunning Crescent, Highbury Drive, Fulham Drive, Mitcham Drive, Jellicoe Avenue, Gort Avenue, Albright Avenue, Westleigh Crescent, Foch Avenue, Woodbury Road, Roseland Drive, Burlingame Road, Delma Drive, Eltham Drive, Orianna Drive and Avalon Road.","Engineering & Construction Services","Toronto Water","2026","2026","RFSQ Work Assignment/RFT","Over $50M","36"],
    [7,"7","Basement Flooding Protection Program Work - 25ECS-LU-02FP","Construction","Basement Flooding Protection Program Phase 5, Assignments 38-10/11/12/22: Storm and sanitary sewer upgrades, watermain replacement and other related improvements on Neilor Crescent, Rayside Drive, Stevenharris Drive, Baskerville Crescent, Radway Avenue, Koos Road, Avery Avenue, the West Mall, Neilson Drive, Neiltree Court, Radway Avenue and Rickshaw Avenue. (WIM-BFPP5-B2-Assig. 38-10/11/12/22)","Engineering & Construction Services","Toronto Water","2026","2026","RFSQ Work Assignment/RFT","$5M to $50M","36"],
    [8,"8","North to South Mimico Sanitary Trunk Sewer Rehabilitation works - 25ECS-LU-02TT","Construction","Rehabilitation of North and South Mimico Sanitary Trunk Sewers within the Islington Golf Club and Tom Riley Park. North Mimico Sanitary Trunk Sewer from MH325-017 to MH325-010 and South Mimico STS from MH322-068 to MH322-047, MH322-060 to CN4145","Engineering & Construction Services","Toronto Water","2026","2027","RFT","$5M to $50M","14"],
    [9,"9","Casebridge Stormwater Management Works - 25ECS-LU-03SM","Construction","Stream restoration of Morningside Creek downstream of Casebridge Outfall. Installation of erosion control works including grade controls, bank protection, and bed treatment. 110 metre reach. Includes minor concrete repairs to outfall.","Engineering & Construction Services","Toronto Water","2026","2026","RFT","Up to $5M","6"],
    [10,"10","Black Creek Sanitary Trunk Sewer Relief System (Phase 1) - 26ECS-MI-01MT","Construction","Construction of Black Creek Sanitary Trunk Sewer Relief System, Phase 1: Approximately 13km long and 3.0m diameter new sanitary trunk sewer primarily along Keele St from north of Sheppard Ave to St. Clair Ave., Approximately 4km long and 1.8m diameter new sanitary trunk sewer along Jane-Downsview-Sir William Hearst Ave., Approximately 500m long and 1.8m diameter new CSO storage tunnel and flow diversion structures along Rockcliffe Blvd and Rockcliffe Ct.","Engineering & Construction Services","Toronto Water","2026","2027","RFT","Over $50M","60"],
    [11,"11","Brimorton Drive Road Reconstruction - 25ECS-RD-01RR","Construction","Brimorton Dr-Brimley to Scarborough Golf Club Local Road Resurfacing and Bike Lane Construction","Engineering & Construction Services","Transportation Services/Toronto Water","2026","2027","RFT","$5M to $50M","5"],
    [12,"12","Hillside Drive Watermain Replacement and Road Reconstruction - 25ECS-RD-105LR","Construction","Hillside Dr Watermain replacement and road reconstruction","Engineering & Construction Services","Transportation Services","2026","2026","RFT","$5M to $50M","7"],
    [13,"13","Don Mills Road Bridge Rehabilitation - 26ECS-BE-04PM","Construction","Bridge Rehab - ID 147 801 Don Mills Rd Tara Ave MX 2026 BPMA","Engineering & Construction Services","Transportation Services","2026","2027","RFT","$5M to $50M","12"],
    [14,"14","Overlea Blvd Bridge and Road Rehabilitation - 26ECS-BE-13SB","Construction","Overlea Blvd Bridge and Road Rehabilitation (ID315)","Engineering & Construction Services","Transportation Services","2026","2026","RFT","Over $50M","30"],
    [15,"15","Highway 27 and Grandstand Entrance Road Bridge Rehabilitation - 26ECS-BE-14PM","Construction","Highway 27& Grandstand Entrance Rd Bridge Rehabilitation (ID 426)","Engineering & Construction Services","Transportation Services","2026","2027","RFT","$5M to $50M","12"],
    [16,"16","The Queensway & St. Clair Avenue Bridge Rehabilitation works - 26ECS-BE-15AM","Construction","The Queensway & St. Clair Avenue Bridge Rehabilitation","Engineering & Construction Services","Transportation Services","2026","2026","RFT","$5M to $50M","12"],
    [17,"17","Jane over Black Creek Bridge Replacement - 26ECS-BE-18SB","Construction","Jane over Black Creek Bridge Replacement (ID 091)","Engineering & Construction Services","Transportation Services","2026","2026","RFT","Over $50M","24"],
    [18,"18","Bennett Road Bridge Construction Works - 26ECS-LU-03SM","Construction","Bridge construction and watercourse, sewer, watermain and active transportation upgrades at Bennett Road and the West Hill Watercourse / Thornton Creek in Scarborough","Engineering & Construction Services","Toronto Water","2026","2026","RFT","$5M to $50M","12"],
    [19,"19","Watermain & Sewer Replacement Works - 26ECS-LU-04SU","Construction","Watermain and sewer replacement including road reconstruction, sidewalk installation, green infrastructure, pedestrian improvements, resurfacing on Lawrence Ave. W, Queen Elizabeth Blvd and Victoria Park Ave.","Engineering & Construction Services","Toronto Water/Transportation Services","2026","2026","RFT","$5M to $50M","12"],
    [20,"20","German Mills Creek Stormwater Management Works - 26ECS-LU-05SM","Construction","Construction works will address active erosion along German Mills Creek by stabilizing the corridor and protecting exposed sanitary infrastructure. The scope includes three exposed sanitary manholes, one exposed sanitary sewer, a partially collapsed armourstone retaining wall, and three sanitary sewer crossings.","Engineering & Construction Services","Toronto Water","2026","2026","RFT","$5M to $50M","12"],
    [21,"21","Sewer Replacement and Road Restoration on Humber River Trail - 26ECS-LU-05SU","Construction","Sewer replacement and road restoration on Humber River Tr., Northover St., Olympus Ave., Stanwood Cres., Whitburn Cres., and Wilket Creek Tr.","Engineering & Construction Services","Toronto Water","2026","2027","RFT","$5M to $50M","8"],
    [22,"22","Highland Creek Stormwater Management Works - 26ECS-LU-06SM","Construction","The scope of work includes channel excavation and backfilling, construction of riffle–pool features, and installation of armourstone and vegetated buttresses along eroded banks and areas of exposed, at risk sanitary and stormwater infrastructure within Highland Cr., between Livingstone and Lawrence Ave. East.","Engineering & Construction Services","Toronto Water","2026","2026","RFT","$5M to $50M","30"],
    [23,"23","Sewer Replacement Works on Baby Point Road - 26ECS-LU-09SU","Construction","Sewer replacement on Baby Point Rd., Gail Grv, Mornelle Crt. and Relmar Rd.","Engineering & Construction Services","Toronto Water","2026","2026","RFT","$5M to $50M","12"],
    [24,"24","Keele Valley Landfill Modular Office Building Construction Works - 26ECS-MI-03SW","Construction","Keele Valley Landfill Modular Office Building Construction","Engineering & Construction Services","Solid Waste Management Services","2026","2026","RFT","Up to $5M","12"],
    [25,"25","Major and Local Road Reconstruction - 26ECS-RD-02RR","Construction","Major & Local Road Resurfacing and Bike Lane Construction at Sloane Ave; Victoria Park to Eglinton","Engineering & Construction Services","Transportation Services","2026","2027","RFT","$5M to $50M","7"],
    [26,"26","Watermain and Local Reconstruction - 26ECS-RD-03LR","Construction","Watermain replacement and road reconstruction; Woodmere/Trowell/Scott","Engineering & Construction Services","Transportation Services/Toronto Water","2026","2026","RFT","Up to $5M","8"],
    [27,"27","Watermain and Local Road Reconstruction - 26ECS-RD-04LR","Construction","Watermain replacement and road reconstruction; Conacher/Taber/Monogram/Strathburn","Engineering & Construction Services","Transportation Services/Toronto Water","2026","2026","RFT","Up to $5M","8"],
    [28,"28","Streetcar Track and Watermain Replacement - 26ECS-RD-06SW","Construction","Streetcar Track and Watermain Replacement; King St W","Engineering & Construction Services","Transportation Services/Toronto Water","2026","2027","RFT","$5M to $50M","8"],
    [29,"29","Streetcar Track Replacement and Sewer Relining - 26ECS-RD-07SW","Construction","Streetcar Track Replacement and Sewer Relining; Queen St E","Engineering & Construction Services","Transportation Services/Toronto Water","2026","2026","RFT","$5M to $50M","8"],
    [30,"30","Road Reconstruction - 26ECS-RD-102LR","Construction","Road resurfacing and reconstruction;Warwick/Elderwood/Hollaman/Belfield/Denison/Thomas Clarkway","Engineering & Construction Services","Transportation Services","2026","2026","RFT","Up to $5M","10"],
    [31,"31","Watermain Replacement and Road Rehabilitation - 26ECS-RD-104LR","Construction","Multi use trail, watermain installation, road rehabilitation; Copperfield Rd","Engineering & Construction Services","Transportation Services/Toronto Water","2026","2026","RFT","Up to $5M","10"],
    [32,"32","Basement Flooding Protection Program Work - 26ECS-LU-01FP","Construction","Basement Flooding Protection Program Phase 5, Assignments 38-09: Storm and sanitary sewer upgrades, watermain replacement and other related improvements on Bridgetown Drive, Elmcrest Creek South, Mayland Avenue, Mulgrove Drive, Renforth Drive and Sealcove Drive. (WIM-BFPP5-Assignment. 38-09)","Engineering & Construction Services","Toronto Water","2026","2026","RFSQ Work Assignment/RFT","$5M to $50M","24"],
    [33,"33","Basement Flooding Protection Program Work - 26ECS-LU-02FP","Construction","Basement Flooding Protection Program, Phase 4, Assignment 34-01 (Phase 1): Storm and sanitary sewer upgrades, watermain and water service replacement, local road rehabilitation, and other related improvements on Gerrard St E, Kingston Rd, Blantyre Ave, Linton Ave, Audrey Ave, East Road, Clonmore Drive, Cornell Ave, Queensbury Ave, Fallingbrook Road, Swanick Ave, Red Deer Ave, Winston Ave. ( WIM-BFPP4-Area 34-01)","Engineering & Construction Services","Toronto Water","2026","2027","RFSQ Work Assignment/RFT","$5M to $50M","36"],
    [34,"34","Watermain and Sewer Replacement and Road Resurfacing Works - City Wide - 26ECS-LU-02SU","Construction","Watermain and sewer replacement including road resurfacing and laneway reconstruction on various streets across the City","Engineering & Construction Services","Transportation Services/Toronto Water","2026","2026","RFT","$5M to $50M","6"],
    [35,"35","Watermain and Sewer Replacement and Road Resurfacing Works  - 26ECS-LU-06SU","Construction","Watermain and sewer replacement including road resurfacing and sidewalk installation on Bellamy Rd S., Belmuir Pl., Eglinton Ave. E., Kingston Rd, Scarborough Golf Club Rd. and Yonge St.","Engineering & Construction Services","Transportation Services/Toronto Water","2026","2026","RFT","$5M to $50M","12"],
    [36,"36","Sewer Replacement and Road Resurfacing on Brimley Road - 26ECS-LU-08SU","Construction","Sewer replacement and road resurfacing on Brimley Rd., East Ave., Island Rd., John McKenzie Gateway and Prestbury St.","Engineering & Construction Services","Transportation Services/Toronto Water","2026","2026","RFT","$5M to $50M","12"],
    [37,"37","Ashbridges Bay Treatment Plant Elevator Refurbishment Works","Construction","Construction services for the refurbishment of nine (9) Elevators at various locations across Ashbridges Bay Treatment Plant","Toronto Water","Toronto Water","2026","2026","RFT","$5M to $50M","24"],
    [38,"38","Humber Bay Treatment Plant Primary Digester Cleaning Works","Construction","Supply of services for the cleaning two (2) Primary Digester tanks and associated pipes at Humber Bay Treatment Plant","Toronto Water","Toronto Water","2026","2026","RFQ","Up to $5M","12"],
    [39,"39","Appraisal Reports","Engineering","To complete new appraisal reports for Waste Water Treatment plants, pumping stations and trunk sewers across the City of Toronto","Toronto Water","Toronto Water","2026","2026","RFP","Up to $5M","12"],
    [40,"40","Watermain Structural Lining Program Works","Construction","Multiple contracts to be issued and delivered at various locations City-wide to rehabilitate watermains with liners and replaces substandard water services to extend service life","Toronto Water","Toronto Water","2026","2026","RFT","$5M to $50M","12"],
    [41,"41","Sewer Rehabilitation Program Works","Construction","Multiple contracts to be issued and delivered at various locations City-wide to repair and renew aging sewers using trenchless and open-cut methods to prevent failures","Toronto Water","Toronto Water","2026","2026","RFT","$5M to $50M","12"],
    [42,"42","Garrison Creek Sanitary Separation Study & Strachan Sewage Pumping Station Environmental Assessment Study","Engineering","Feasibility study and conceptual design for separating storm and sanitary flows within the Garrison Creek and Strachan Sewage Pumping Station catchment. The study will identify candidate separation locations, develop cost estimates, and quantify net benefits for each option to inform subsequent capital planning and the Strachan SPS Environmental Assessment.","Toronto Water","Toronto Water","2026","2026","RFP","Up to $5M","30"],
    [43,"43","Smoke and Dye Testing Phase 3","Engineering","Field investigation program using smoke and dye testing on sanitary and storm sewer pipes within the Phase 3 study area to identify sources of inflow and infiltration. Findings will inform downstream rehabilitation prioritization and capital planning for inflow and infiltration reduction.","Toronto Water","Toronto Water","2026","2026","RFQ","Up to $5M","24"],
    [44,"44","Toronto Water Facilities Elevator Refurbishment - Engineering Services","Engineering","Engineering services for the rehabilitation of 12 elevators across 7 Toronto Water facilities, including design, tender support, contract administration, and post-construction services.","Toronto Water","Toronto Water","2026","2026","RFP","Up to $5M","48"],
    [45,"45","Facility Roofing Renovation Works","Construction","Replace roofing for the following locations: 60 Tiffield Road, 150 Disco Road,  and 30 Northline","Toronto Water","Toronto Water","2026","2026","RFP","Up to $5M","36"],
    [46,"46","Humber Treatment Plant South Primary Tank Long and Cross Collector Replacements - 26ECS-MI-02HU","Construction","Replacement of the sludge cross collection systems and rehabilitation of the existing long collector chain and flight scum collection system, together with associated electrical and controls upgrades; Concrete rehabilitation for the South Primary Tanks; installation of new access platforms; and replacement of primary inlet channel aeration piping.","Engineering & Construction Services","Toronto Water","2026","2027","RFT","$5M to $50M","36"]
]}
