{"help": "https://ckan0.cf.opendata.inter.prod-toronto.ca/tr/api/3/action/help_show?name=datastore_search", "success": true, "result": {"include_total": true, "limit": 100, "records_format": "objects", "resource_id": "40d94b5a-cbf2-4e04-8d48-24038d163d0c", "total_estimation_threshold": null, "records": [{"_id":1,"OBJECTID":3,"PROJ_NUM":"TS2023-13-049","LAST_UPDATED_DATE":"2024-04-25","PROJECT":"Local Road Rehabilitation","LOCATION":"ST PAUL ST&lt;br&gt; From: [E-W] SACKVILLE ST [LEG]&lt;br&gt; To: RAY LANE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2024 - Q4 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Javier Saborio, Engineering and Construction Services","CONTACT_EMAIL":"jsabori@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3601728114032, 43.65555203136], [-79.3601904349407, 43.6556400591316], [-79.3603190377211, 43.6559653901647], [-79.3603520870802, 43.6560522395732], [-79.3603556852797, 43.6560617043887]]}"},{"_id":2,"OBJECTID":12,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-11","PROJECT":"Laneway Reconstruction","LOCATION":"[45.70 m E] BEECH AVE&lt;br&gt; From: CEDAR AVE&lt;br&gt; To: PINE AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.287593708477, 43.674543323963], [-79.2879796582391, 43.6754832201276], [-79.2883565320521, 43.6764082458593]]}"},{"_id":3,"OBJECTID":26,"PROJ_NUM":"TS2023-11-436","LAST_UPDATED_DATE":"2025-09-05","PROJECT":"Local Road Reconstruction","LOCATION":"BALDWIN ST&lt;br&gt; From: [98 m W] SPADINA AVE&lt;br&gt; To: KENSINGTON AVE (TO) ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4002782277281, 43.6548582997671], [-79.4007089263197, 43.6547691742142]]}"},{"_id":4,"OBJECTID":30,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"KRIS CRES&lt;br&gt; From: CARSBROOKE RD&lt;br&gt; To: [45 m E] CARSBROOKE RD [CUL-DE-SAC] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Completed","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5763675630712, 43.6476550634282], [-79.5757708304254, 43.6477815696374]]}"},{"_id":5,"OBJECTID":255,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Laneway Reconstruction","LOCATION":"[119.70 m W] VIA ITALIA&lt;br&gt; From: AUBURN AVE&lt;br&gt; To: [34.40 m N] AUBURN AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4461915647946, 43.6746277796123], [-79.4463538719082, 43.6750084228117]]}"},{"_id":6,"OBJECTID":293,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"CARLTON ST&lt;br&gt; From: SACKVILLE ST&lt;br&gt; To: WOODSTOCK PL ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3650544592627, 43.6651339514473], [-79.3645021603355, 43.6652537450132]]}"},{"_id":7,"OBJECTID":447,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"CARLTON ST&lt;br&gt; From: WOODSTOCK PL&lt;br&gt; To: BOWMAN ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3645021603355, 43.6652537450132], [-79.3644791353226, 43.6652587854712], [-79.3644459003492, 43.6652660821547], [-79.3638396618719, 43.6654072497246]]}"},{"_id":8,"OBJECTID":490,"PROJ_NUM":"TS2023-10_11-435","LAST_UPDATED_DATE":"2025-09-05","PROJECT":"Local Road Reconstruction","LOCATION":"AUGUSTA AVE&lt;br&gt; From: OXFORD ST (TO)&lt;br&gt; To: COLLEGE ST (TO) ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4026845921798, 43.6560924157577], [-79.4032003101603, 43.6573828821899]]}"},{"_id":9,"OBJECTID":776,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Rehabilitation","LOCATION":"WINONA DR&lt;br&gt; From: AVA RD&lt;br&gt; To: CLOVELLY AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Cherry Chen, Engineering and Construction Services","CONTACT_EMAIL":"cchen9@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4378210778934, 43.6951081303487], [-79.4380314984721, 43.6956078162082]]}"},{"_id":10,"OBJECTID":1157,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-30","PROJECT":"Local Road Reconstruction","LOCATION":"[E-W] RIPLEY AVE [LEG]&lt;br&gt; From: SOUTH KINGSWAY&lt;br&gt; To: RIPLEY AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"&lt;Null&gt; Transportation Roads State of Good Repair","CONTACT_EMAIL":"RoadSOGR@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4752735067663, 43.6367801228756], [-79.4750956403653, 43.6368789644543], [-79.4747420400863, 43.6370114142297], [-79.4746954581377, 43.6370258151413], [-79.4746477322885, 43.6370488931129], [-79.474601858692, 43.6370880749489], [-79.4745885481266, 43.6371459598801], [-79.4745930690629, 43.637182047426]]}"},{"_id":11,"OBJECTID":1921,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-11","PROJECT":"Laneway Reconstruction","LOCATION":"LEADER LANE&lt;br&gt; From: COLBORNE ST&lt;br&gt; To: KING ST E ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3754504279513, 43.6489765546027], [-79.3755293619994, 43.649171232027], [-79.3755633085676, 43.6492526322964], [-79.3757196322858, 43.6496404279949]]}"},{"_id":12,"OBJECTID":2501,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Laneway Reconstruction","LOCATION":"[24.90 m E] HURON ST&lt;br&gt; From: [23.80 m N] DUNDAS ST W&lt;br&gt; To: [44.30 m N] DUNDAS ST W ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3958991799977, 43.6539042939077], [-79.3958250734784, 43.6537224620337]]}"},{"_id":13,"OBJECTID":2572,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Laneway Reconstruction","LOCATION":"[34 m N] FLORENCE AVE&lt;br&gt; From: [54 m E] EILEEN AVE&lt;br&gt; To: EILEEN AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2027 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4949862032113, 43.669597367554], [-79.4946385497765, 43.6699354237542], [-79.4945038551906, 43.6700663867132]]}"},{"_id":14,"OBJECTID":2644,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Laneway Reconstruction","LOCATION":"[79.20 m W] HURON ST&lt;br&gt; From: DUNDAS ST W&lt;br&gt; To: D&apos;ARCY ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3972709038512, 43.6531172591201], [-79.397450075485, 43.6535784964466], [-79.3976430744232, 43.6540753011883]]}"},{"_id":15,"OBJECTID":2645,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Laneway Reconstruction","LOCATION":"[44.50 m N] DUNDAS ST W&lt;br&gt; From: [95.40 m E] HURON ST&lt;br&gt; To: HURON ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3958991799977, 43.6539042939077], [-79.3963577254249, 43.6538134548248]]}"},{"_id":16,"OBJECTID":2722,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-07-14","PROJECT":"Laneway Reconstruction","LOCATION":"[33.50 m W] DUFFERIN ST&lt;br&gt; From: WALLACE AVE&lt;br&gt; To: ARMSTRONG AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4375930489394, 43.6637435715708], [-79.4377521932244, 43.6641522741532], [-79.4379324125262, 43.6646151669866]]}"},{"_id":17,"OBJECTID":3281,"PROJ_NUM":"TS2023-19-335","LAST_UPDATED_DATE":"2026-08-11","PROJECT":"Local Road Rehabilitation","LOCATION":"HAZEL AVE&lt;br&gt; From: BALSAM AVE&lt;br&gt; To: FERNWOOD PARK AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Tony Rodrigues, Engineering and Construction Services","CONTACT_EMAIL":"trodrig@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2896188795919, 43.6714184253652], [-79.2891267682647, 43.6715303322198], [-79.289059313165, 43.6715463831445], [-79.2889869526682, 43.671546735665], [-79.2889265184488, 43.6715480553011], [-79.288821936959, 43.6715423173295], [-79.2887122339102, 43.6715401163179], [-79.2886268184633, 43.6715289587889], [-79.2885766149007, 43.6715232401184], [-79.2884618675573, 43.6714813967029]]}"},{"_id":18,"OBJECTID":3631,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-19","PROJECT":"Local Road Reconstruction","LOCATION":"RIDELLE AVE&lt;br&gt; From: MARWOOD RD&lt;br&gt; To: FERNWOOD RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4352586991205, 43.705352876365], [-79.4364077221742, 43.7051021787966]]}"},{"_id":19,"OBJECTID":3846,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-12-03","PROJECT":"Laneway Reconstruction","LOCATION":"FITZROY TER&lt;br&gt; From: KENSINGTON AVE (TO)&lt;br&gt; To: [50 m W] KENSINGTON AVE (TO) ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4001992261045, 43.6534389242195], [-79.4007953113944, 43.6533083653234]]}"},{"_id":20,"OBJECTID":3863,"PROJ_NUM":"TS2023-10_11-435","LAST_UPDATED_DATE":"2025-09-05","PROJECT":"Local Road Reconstruction","LOCATION":"AUGUSTA AVE&lt;br&gt; From: BALDWIN ST&lt;br&gt; To: NASSAU ST ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4020351709196, 43.6545084150726], [-79.4023360063203, 43.6552350637161]]}"},{"_id":21,"OBJECTID":3865,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Rehabilitation","LOCATION":"WINONA DR&lt;br&gt; From: BELVIDERE AVE&lt;br&gt; To: BUDE ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Cherry Chen, Engineering and Construction Services","CONTACT_EMAIL":"cchen9@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4372030906581, 43.6935452763142], [-79.4377070748369, 43.6947908537966]]}"},{"_id":22,"OBJECTID":3886,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Laneway Reconstruction","LOCATION":"[33.20 m N] DOUGLAS AVE&lt;br&gt; From: JEDBURGH RD&lt;br&gt; To: GREER RD ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2024 - Q3 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4063354943867, 43.7262409379777], [-79.4095119643438, 43.725568889742]]}"},{"_id":23,"OBJECTID":3895,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"GLOS RD&lt;br&gt; From: [217 m E] CRENDON DR&lt;br&gt; To: [102 m E] CRENDON DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Completed","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5710472360338, 43.6461883366375], [-79.5705531345606, 43.6463074246984], [-79.5700184387569, 43.6464403345883], [-79.5696500583489, 43.6465228501257], [-79.5696184821238, 43.6465299174304], [-79.5695556518524, 43.6465332321743], [-79.5695018433243, 43.6465344980888], [-79.5694553119934, 43.6465257770406]]}"},{"_id":24,"OBJECTID":3903,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"ELDERFIELD (W) CRES&lt;br&gt; From: [214 m S] INTERSECTION OF GLOS RD&lt;br&gt; To: INTERSECTION OF GLOS RD (WEST) ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Completed","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5705531345606, 43.6463074246984], [-79.5699644486175, 43.6449820559555], [-79.569950975184, 43.6449503613773], [-79.5699256532528, 43.6448986009911], [-79.5699001594552, 43.6448696231708], [-79.5698584622288, 43.6448490535255], [-79.5698102179532, 43.6448479038179], [-79.5697497136972, 43.644856672079], [-79.5692202089961, 43.6449668736471]]}"},{"_id":25,"OBJECTID":4005,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-07-12","PROJECT":"Local Road Rehabilitation","LOCATION":"HENNING AVE&lt;br&gt; From: EGLINTON AVE W&lt;br&gt; To: [107 m N] EGLINTON AVE W [END] ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4014521157876, 43.7061002196874], [-79.4018118861901, 43.7071266382737]]}"},{"_id":26,"OBJECTID":4136,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-07-22","PROJECT":"Laneway Reconstruction","LOCATION":"[116.70 m W] RONCESVALLES AVE&lt;br&gt; From: GEOFFREY ST&lt;br&gt; To: GRENADIER RD ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4514451805993, 43.6476871556254], [-79.4515951399121, 43.6480977804842], [-79.4517427017002, 43.6485017971034]]}"},{"_id":27,"OBJECTID":4178,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Laneway Reconstruction","LOCATION":"[46.30 m N] DUNDAS ST W&lt;br&gt; From: BEVERLEY ST&lt;br&gt; To: [42.70 m W] BEVERLEY ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3940517146883, 43.6542702749187], [-79.3945509554386, 43.6541713705789]]}"},{"_id":28,"OBJECTID":4180,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-09-27","PROJECT":"Laneway Reconstruction","LOCATION":"[28.60 m W] YORK ST&lt;br&gt; From: [52 m S] RICHMOND ST W&lt;br&gt; To: RICHMOND ST W ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3851110950526, 43.6503416018767], [-79.3848953663775, 43.64980495776]]}"},{"_id":29,"OBJECTID":4200,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2022-08-29","PROJECT":"Laneway Reconstruction","LOCATION":"[30.50 m W] OSSINGTON AVE&lt;br&gt; From: BADEN ST&lt;br&gt; To: [30.20 m N] BADEN ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4216355315554, 43.6500756097822], [-79.421591252616, 43.6500841307132], [-79.4217053489407, 43.6503902461918]]}"},{"_id":30,"OBJECTID":4208,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-08-11","PROJECT":"Laneway Reconstruction","LOCATION":"[30.50 m E] DOVERCOURT RD&lt;br&gt; From: HUMBERT ST&lt;br&gt; To: ARGYLE ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4226077788002, 43.6454677892685], [-79.4229314283841, 43.6463000133691]]}"},{"_id":31,"OBJECTID":4250,"PROJ_NUM":"TS2023-09-011","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"ASCOT AVE&lt;br&gt; From: NAIRN AVE&lt;br&gt; To: HARVIE AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Adrian Viegas, Engineering and Construction Services","CONTACT_EMAIL":"aviegas@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4495473897519, 43.6789139380494], [-79.4507281001739, 43.6786565653648]]}"},{"_id":32,"OBJECTID":4252,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"CASTLEFIELD AVE&lt;br&gt; From: YONGE ST&lt;br&gt; To: DUPLEX AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Ehsan Movahedi, Engineering and Construction Services","CONTACT_EMAIL":"emovahe@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3994765853598, 43.7118389681081], [-79.3999992591552, 43.7117357590166], [-79.4012583561257, 43.7114871495535]]}"},{"_id":33,"OBJECTID":4301,"PROJ_NUM":"TS2023-09-011","LAST_UPDATED_DATE":"2023-02-13","PROJECT":"Local Road Rehabilitation","LOCATION":"ASCOT AVE&lt;br&gt; From: EARLSCOURT AVE&lt;br&gt; To: NAIRN AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2026 - Q2 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Adrian Viegas, Engineering and Construction Services","CONTACT_EMAIL":"aviegas@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.448338203112, 43.67917415708], [-79.4495473897519, 43.6789139380494]]}"},{"_id":34,"OBJECTID":5031,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-10-31","PROJECT":"Laneway Reconstruction","LOCATION":"[30.20 m N] BADEN ST&lt;br&gt; From: [30.50 m W] OSSINGTON AVE&lt;br&gt; To: [67.10 m W] OSSINGTON AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4217053489407, 43.6503902461918], [-79.4221133440851, 43.6503136262731]]}"},{"_id":35,"OBJECTID":5090,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"DANESWOOD RD&lt;br&gt; From: DAWLISH AVE&lt;br&gt; To: GLENALLAN RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3816147983447, 43.7231452442144], [-79.3816913440446, 43.7235596147733], [-79.3817351408656, 43.7236940486788], [-79.3818625936904, 43.7239984765425], [-79.3819177659893, 43.7241363696007]]}"},{"_id":36,"OBJECTID":5117,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"LEWES CRES&lt;br&gt; From: ST LEONARDS AVE&lt;br&gt; To: ST LEONARDS AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3840849904893, 43.7247559652186], [-79.3841050458194, 43.7248343953812], [-79.3840878612609, 43.72495363542], [-79.3840740005087, 43.7250613122282], [-79.3839519999304, 43.7258025937137], [-79.3833269037246, 43.7259424847388], [-79.3832502465853, 43.7259488153497], [-79.3831977290607, 43.7259497608335], [-79.3831326653616, 43.7259366605314], [-79.3830968812741, 43.7259302510601], [-79.3830435490622, 43.7259097456824], [-79.3829742901323, 43.7258711494827], [-79.3829154798024, 43.7258338241178], [-79.3828594302049, 43.7257874733069], [-79.3828143235459, 43.7257434830115], [-79.3827678208164, 43.7256961968118], [-79.3827165346782, 43.7256259435178], [-79.3826783706037, 43.7255671712511], [-79.3826381214641, 43.7254956420708], [-79.3826162405023, 43.7254440514883], [-79.3825885566248, 43.7254021672804], [-79.3825426302295, 43.7253523522294], [-79.3824755570275, 43.7253072770755], [-79.3824204788216, 43.7252787224994], [-79.3823445978032, 43.7252440256408], [-79.3822769680503, 43.7252170872997], [-79.3821241676272, 43.7251647406227]]}"},{"_id":37,"OBJECTID":5156,"PROJ_NUM":"TS2023-19-440","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Rehabilitation","LOCATION":"BARKER AVE (E YK)&lt;br&gt; From: KING EDWARD AVE&lt;br&gt; To: GLEDHILL AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3134045625131, 43.6950339876148], [-79.3122778980235, 43.6952964117161]]}"},{"_id":38,"OBJECTID":5199,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-12","PROJECT":"Major Road Rehabilitation","LOCATION":"DUPONT ST&lt;br&gt; From: DAVENPORT RD&lt;br&gt; To: ST GEORGE ST (TO) ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2027 - Q3 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Shahid Virk, Engineering and Construction Services","CONTACT_EMAIL":"svirk@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4025942469293, 43.6758100175078], [-79.4036003140794, 43.6755947756571]]}"},{"_id":39,"OBJECTID":5321,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-26","PROJECT":"Local Road Reconstruction","LOCATION":"MINUK ACRES&lt;br&gt; From: BEECHGROVE DR&lt;br&gt; To: [193 m S] BEECHGROVE DR [CUL-DE-SAC] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2027 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.1578992594287, 43.7663211801081], [-79.1579477759662, 43.76623142162], [-79.1579588748281, 43.7660470208393], [-79.1579068484269, 43.765920146642], [-79.1573528711963, 43.7646543895528]]}"},{"_id":40,"OBJECTID":5372,"PROJ_NUM":"TS2023-04-089","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Rehabilitation","LOCATION":"EVANS AVE (TO)&lt;br&gt; From: ARDAGH ST&lt;br&gt; To: ANNETTE ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4850005367811, 43.6561965473737], [-79.4853256404639, 43.6569701657164], [-79.4858924421021, 43.6583188823097], [-79.4860496016982, 43.6586927636036]]}"},{"_id":41,"OBJECTID":5383,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Laneway Reconstruction","LOCATION":"BARBARA BARRETT LANE&lt;br&gt; From: BRUNSWICK AVE&lt;br&gt; To: BORDEN ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2024 - Q3 2024","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4073084412112, 43.6654935809231], [-79.4078890544622, 43.6653562307739], [-79.4085026779383, 43.665231830019]]}"},{"_id":42,"OBJECTID":5426,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-07-23","PROJECT":"Local Road Rehabilitation","LOCATION":"BALMORAL AVE&lt;br&gt; From: POPLAR PLAINS RD&lt;br&gt; To: WARREN RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Fernando Eyzaguirre Garcia, Engineering and Construction Services","CONTACT_EMAIL":"feyzagu@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4030980672066, 43.6842575396338], [-79.4032636221751, 43.6842311800091], [-79.4055502660166, 43.6837768789773]]}"},{"_id":43,"OBJECTID":5491,"PROJ_NUM":"TS2023-11-241","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Laneway Reconstruction","LOCATION":"[36.60 m N] BLOOR ST W&lt;br&gt; From: [35.10 m E] MARKHAM ST&lt;br&gt; To: MARKHAM ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2024 - Q3 2024","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4125770137465, 43.6653093065932], [-79.4121105874556, 43.6654042640917], [-79.4120663187757, 43.6654395872989]]}"},{"_id":44,"OBJECTID":5589,"PROJ_NUM":"TS2023-12-009","LAST_UPDATED_DATE":"2024-06-26","PROJECT":"Local Road Rehabilitation","LOCATION":"ARCHER RD&lt;br&gt; From: BROWSIDE AVE&lt;br&gt; To: SPADINA RD (TO) ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2024 - Q3 2024","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4150224213017, 43.6962829755516], [-79.4157924511157, 43.6960867232343]]}"},{"_id":45,"OBJECTID":5744,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-06-28","PROJECT":"Major Road Rehabilitation","LOCATION":"WELLESLEY ST E&lt;br&gt; From: WELLESLEY PL&lt;br&gt; To: HOMEWOOD AVE (TO) ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2026 - Q4 2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Rooban Markandu, Engineering and Construction Services","CONTACT_EMAIL":"rmarkan2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3765008860926, 43.6664289240854], [-79.3763109933683, 43.6664296099067], [-79.3761593377928, 43.6664382670192], [-79.3760344117811, 43.6664551261323], [-79.3758529004957, 43.6664862717973]]}"},{"_id":46,"OBJECTID":5904,"PROJ_NUM":"TS2023-06_07-301","LAST_UPDATED_DATE":"2024-06-21","PROJECT":"Local Road Reconstruction","LOCATION":"SENTINEL RD&lt;br&gt; From: SHEPPARD AVE W&lt;br&gt; To: STILECROFT DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2024 - Q4 2025","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4918501582177, 43.7436491517555], [-79.4919846643781, 43.7439762473666], [-79.4919899394016, 43.7439890834666], [-79.4922405739252, 43.7445986178833], [-79.4922802047787, 43.744702557565], [-79.4923030002387, 43.7448018874779], [-79.4923257833592, 43.7449012083826], [-79.4923445013373, 43.7450410704662], [-79.4923770478825, 43.7452049757021], [-79.4924007103257, 43.7453240362997], [-79.4924013431428, 43.7453272407729], [-79.4925168772557, 43.7459087536129], [-79.4925853317996, 43.7469846546351], [-79.4926105768129, 43.7470666302759], [-79.4926272689012, 43.7471325021969], [-79.4926568590542, 43.7472206979404], [-79.4932497410605, 43.7486062813022], [-79.493603490296, 43.7493576232621], [-79.4938019638052, 43.7497105624262], [-79.4941939982246, 43.7504412017153]]}"},{"_id":47,"OBJECTID":6145,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-19","PROJECT":"Local Road Reconstruction","LOCATION":"RIDELLE AVE&lt;br&gt; From: OLD PARK RD&lt;br&gt; To: OVERDALE RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4329630666137, 43.7058561014957], [-79.4340824128994, 43.705597533802]]}"},{"_id":48,"OBJECTID":6170,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-04-12","PROJECT":"Laneway Reconstruction","LOCATION":"[30.50 m N] QUEEN ST W&lt;br&gt; From: DOVERCOURT RD&lt;br&gt; To: LISGAR ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.422546741472, 43.643838634987], [-79.4231276294697, 43.6437226573532], [-79.4237534360793, 43.6435962471399]]}"},{"_id":49,"OBJECTID":6214,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-04-11","PROJECT":"Laneway Reconstruction","LOCATION":"CHESTNUT LANE&lt;br&gt; From: [42 m S] CHESTNUT HILLS CRES&lt;br&gt; To: [66 m S] CHESTNUT HILLS CRES ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027 - 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adrian Viegas, Engineering and Construction Services","CONTACT_EMAIL":"aviegas@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.526026898589, 43.6527792115145], [-79.5263376062108, 43.6529222439307]]}"},{"_id":50,"OBJECTID":6289,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Reconstruction","LOCATION":"RIPLEY AVE&lt;br&gt; From: [E-W] RIPLEY AVE [LEG]&lt;br&gt; To: ORMSKIRK AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"&lt;Null&gt; Transportation Roads State of Good Repair","CONTACT_EMAIL":"RoadSOGR@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4745930690629, 43.637182047426], [-79.4745960953706, 43.6372062168095], [-79.4746219613309, 43.6372650825918], [-79.4749660380028, 43.6377761758923], [-79.475268822514, 43.6381989826478], [-79.4756074738367, 43.6385754751277], [-79.4759083900822, 43.6388873377308], [-79.4761854885928, 43.6391341506009]]}"},{"_id":51,"OBJECTID":6317,"PROJ_NUM":"TS2023-24-430","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Major Road Reconstruction","LOCATION":"SCARBOROUGH GOLF CLUB RD&lt;br&gt; From: BRIMORTON DR&lt;br&gt; To: ELLESMERE RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2025 - Q4 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Mehrshad Rahimi, Engineering and Construction Services","CONTACT_EMAIL":"mrahimi@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2186842194236, 43.7698112486013], [-79.2194785911463, 43.7717858786051], [-79.2200726425321, 43.7732636699038], [-79.2206551360403, 43.7747141379738], [-79.2210528104115, 43.7756809876262], [-79.2214293877347, 43.776605838924], [-79.2214704721378, 43.7766988849992], [-79.2222172150957, 43.7785568936147]]}"},{"_id":52,"OBJECTID":6324,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-08-14","PROJECT":"Major Road Rehabilitation","LOCATION":"GREENWOOD AVE&lt;br&gt; From: MILVERTON BLVD&lt;br&gt; To: [34.60 m N] MILVERTON BLVD [CITY LIMITS] ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q2 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Promil Sarkar, Engineering and Construction Services","CONTACT_EMAIL":"psarkar@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.33375881088, 43.6847137030437], [-79.3339042258784, 43.6850841471032]]}"},{"_id":53,"OBJECTID":6333,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Reconstruction","LOCATION":"ST LEONARDS AVE&lt;br&gt; From: CITY LIMIT&lt;br&gt; To: [155 m W] MILDENHALL RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3892506862722, 43.7236794705932], [-79.3887718705558, 43.7237594047772], [-79.3868376928876, 43.7241643264962]]}"},{"_id":54,"OBJECTID":6344,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"CARLTON ST&lt;br&gt; From: RAWLINGS AVE&lt;br&gt; To: SUMACH ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3632393067794, 43.665539086729], [-79.3625174332228, 43.6656921436639]]}"},{"_id":55,"OBJECTID":6345,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"REGENT ST&lt;br&gt; From: SHUTER ST&lt;br&gt; To: SUTTON AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3635196592143, 43.6572869098539], [-79.3636245840741, 43.6575166144818], [-79.3637305759474, 43.6577737383835], [-79.3637847232498, 43.6579141519399]]}"},{"_id":56,"OBJECTID":6429,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-08-14","PROJECT":"Major Road Rehabilitation","LOCATION":"GREENWOOD AVE&lt;br&gt; From: QUEENSDALE AVE&lt;br&gt; To: SAMMON AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q2 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Promil Sarkar, Engineering and Construction Services","CONTACT_EMAIL":"psarkar@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3344095554926, 43.6862689027403], [-79.3346688925937, 43.6868847061672]]}"},{"_id":57,"OBJECTID":6437,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-08-14","PROJECT":"Major Road Rehabilitation","LOCATION":"GREENWOOD AVE&lt;br&gt; From: SPRINGDALE BLVD&lt;br&gt; To: QUEENSDALE AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q2 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Promil Sarkar, Engineering and Construction Services","CONTACT_EMAIL":"psarkar@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.334063761933, 43.6854622175555], [-79.3344095554926, 43.6862689027403]]}"},{"_id":58,"OBJECTID":6553,"PROJ_NUM":"TS2023-10_11-435","LAST_UPDATED_DATE":"2025-09-05","PROJECT":"Local Road Reconstruction","LOCATION":"AUGUSTA AVE&lt;br&gt; From: DENISON SQ&lt;br&gt; To: BALDWIN ST ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4017770609106, 43.6538823474021], [-79.4019129439756, 43.654211967673], [-79.401916142253, 43.6542197295849], [-79.4020351709196, 43.6545084150726]]}"},{"_id":59,"OBJECTID":6575,"PROJ_NUM":"TS2023-11-101","LAST_UPDATED_DATE":"2025-09-05","PROJECT":"Local Road Reconstruction","LOCATION":"KENSINGTON AVE (TO)&lt;br&gt; From: DUNDAS ST W&lt;br&gt; To: FITZROY TER ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3998708242733, 43.6525513283239], [-79.4001832025141, 43.653397900052], [-79.4001992261045, 43.6534389242195]]}"},{"_id":60,"OBJECTID":6576,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Rehabilitation","LOCATION":"COPPERFIELD RD&lt;br&gt; From: MANSE RD&lt;br&gt; To: [550 m E] MANSE RD ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q4 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.1717492025535, 43.7598266896592], [-79.1702954390999, 43.7601015599199], [-79.169086453548, 43.7603231135405], [-79.1678579609302, 43.7605626090377], [-79.1666351856069, 43.7607481009138], [-79.1658636171885, 43.7608898847661], [-79.1645153900769, 43.7611559797411], [-79.1640918013513, 43.7612537575955], [-79.1640467313644, 43.7612626263076], [-79.1636322800481, 43.7613407707396], [-79.1634380210971, 43.7613774097512], [-79.1632032891743, 43.7614202930105], [-79.1627937653417, 43.7614963786478], [-79.1627118031289, 43.7615107457182], [-79.162585225103, 43.761519382294], [-79.1624423530227, 43.7615279616072], [-79.1624092385995, 43.7615264866228], [-79.1621883639978, 43.7615166618192]]}"},{"_id":61,"OBJECTID":6578,"PROJ_NUM":"TS2024-10_11-027","LAST_UPDATED_DATE":"2025-03-19","PROJECT":"Major Road Rehabilitation","LOCATION":"[E] UNIVERSITY AVE [BRANCH]&lt;br&gt; From: DUNDAS ST W&lt;br&gt; To: EDWARD ST ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2027 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Newsha Roshani, Engineering and Construction Services","CONTACT_EMAIL":"nroshan@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3881457916216, 43.6548243888637], [-79.3882868814965, 43.6551417615208], [-79.3884527438773, 43.6555123741572]]}"},{"_id":62,"OBJECTID":6597,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Local Road Rehabilitation","LOCATION":"WALES AVE&lt;br&gt; From: BELLEVUE AVE&lt;br&gt; To: LEONARD AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4029094168243, 43.6530886840643], [-79.403221476101, 43.6530196292322], [-79.4033423468029, 43.6529970300757], [-79.4042150511109, 43.652833894951]]}"},{"_id":63,"OBJECTID":6620,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-31","PROJECT":"Laneway Reconstruction","LOCATION":"[79 m N] O&apos;CONNOR DR&lt;br&gt; From: HOPEDALE AVE&lt;br&gt; To: [35 m W] HOPEDALE AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3525191512779, 43.6936711564173], [-79.3531025293583, 43.6935649092551]]}"},{"_id":64,"OBJECTID":6746,"PROJ_NUM":"TS2023-11-436","LAST_UPDATED_DATE":"2025-09-05","PROJECT":"Local Road Reconstruction","LOCATION":"BALDWIN ST&lt;br&gt; From: SPADINA AVE&lt;br&gt; To: [98 m W] SPADINA AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3989262111511, 43.6551380265815], [-79.4002782277281, 43.6548582997671]]}"},{"_id":65,"OBJECTID":6772,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-18","PROJECT":"Local Road Reconstruction","LOCATION":"MILITARY TRL&lt;br&gt; From: ELLESMERE RD&lt;br&gt; To: EAST HIGHLAND CREEK ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2022 - Q4 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2021","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.2171425869619, 43.7797525911282], [-79.2172054231109, 43.7798897801554], [-79.2172618651669, 43.7800130195448], [-79.2172988800767, 43.7800935003898], [-79.2173281899266, 43.7801560948803], [-79.2173465622082, 43.7802276814674], [-79.2173509875124, 43.7802904214334], [-79.2173631522376, 43.7803532345448], [-79.217363693422, 43.7804071347748], [-79.2173571682355, 43.7804789568231], [-79.2173460391378, 43.7805417663338], [-79.217326417551, 43.7805955716908], [-79.2173114170927, 43.7806494514819], [-79.2172956333036, 43.7807034643502], [-79.217279836596, 43.7807575761964], [-79.2172578276505, 43.780811789687], [-79.2172388999469, 43.7808659477879], [-79.2172160375246, 43.780937801412], [-79.2171947165617, 43.7810094428172], [-79.2171733827846, 43.781081156195], [-79.2171615422584, 43.7811261506452], [-79.2171426645277, 43.7811802098381], [-79.2171345648972, 43.7812433418581], [-79.2171280731657, 43.7812974497034], [-79.2171239299592, 43.7813514553467], [-79.2171236450957, 43.7814145076927], [-79.2171311248896, 43.7814775792555], [-79.2171339213066, 43.7815405852192], [-79.2171382641291, 43.7815944408408], [-79.2171433293577, 43.7816663545543], [-79.2171569664363, 43.7817383704903], [-79.2171721795321, 43.7817923250184], [-79.2171893778909, 43.7818547275337], [-79.2172072972751, 43.7819170418184], [-79.2172370969877, 43.7819707623922], [-79.2172779767934, 43.782024888415], [-79.2173119417115, 43.7820700321761], [-79.2173405515638, 43.7821152796981], [-79.217378526901, 43.7821425030698], [-79.2174474764815, 43.7821878053032], [-79.2174954482687, 43.7822239554838], [-79.2175449539182, 43.7822509822707], [-79.2175834411329, 43.7822777117756], [-79.2176093076736, 43.7823040500395], [-79.2176428898198, 43.7823302993451], [-79.2176824875901, 43.7823929821442], [-79.2177006729781, 43.7824200305062], [-79.2177267546203, 43.7824561265182], [-79.2177400525552, 43.7824921459481], [-79.2177549791368, 43.7825464147243], [-79.2177566352935, 43.7825931437707], [-79.2177474628607, 43.7826388109434], [-79.2177256224113, 43.7826729973695], [-79.217703832437, 43.7826990918845], [-79.2176712122783, 43.782735015899], [-79.2176277659243, 43.7827799143043], [-79.2175847526409, 43.7828251738087], [-79.2175221614293, 43.7828910785477], [-79.2174727102193, 43.7829262498139], [-79.2173183468634, 43.783033593854], [-79.2172000006983, 43.7831249687629], [-79.2171161885595, 43.7832066987883], [-79.2170426411406, 43.7832694077385], [-79.2169586073026, 43.7833137733392], [-79.2168539815298, 43.783385577366], [-79.2167740877602, 43.7834213749942], [-79.2166983141484, 43.7834660219047], [-79.2166161545103, 43.783510661932], [-79.2164667188975, 43.7835920487226], [-79.2163552888671, 43.783654870268], [-79.2162462067663, 43.7837176885321], [-79.2161471429247, 43.7837821427778], [-79.216059960995, 43.78383510499], [-79.2156789478982, 43.7840665583619]]}"},{"_id":66,"OBJECTID":6803,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-09-10","PROJECT":"Local Road Rehabilitation","LOCATION":"WINONA DR&lt;br&gt; From: [E] GLOUCESTER GRV [BRANCH]&lt;br&gt; To: LANARK AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2025","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Cherry Chen, Engineering and Construction Services","CONTACT_EMAIL":"cchen9@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4384007831452, 43.6965537542208], [-79.4387210208475, 43.6972723911113]]}"},{"_id":67,"OBJECTID":6820,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-10-14","PROJECT":"Local Road Reconstruction","LOCATION":"HIGHLAND AVE&lt;br&gt; From: [289.60 m E] HIGHLAND GDNS&lt;br&gt; To: ROXBOROUGH DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q3 2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3785435132965, 43.6817156199135], [-79.3776022587117, 43.681900321977], [-79.3775600049071, 43.681904777381], [-79.3771063514825, 43.681989803011]]}"},{"_id":68,"OBJECTID":6822,"PROJ_NUM":"TS2023-11-436","LAST_UPDATED_DATE":"2025-09-05","PROJECT":"Local Road Reconstruction","LOCATION":"BALDWIN ST&lt;br&gt; From: KENSINGTON AVE (TO)&lt;br&gt; To: AUGUSTA AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4007089263197, 43.6547691742142], [-79.4015134758732, 43.6546146958575], [-79.4020351709196, 43.6545084150726]]}"},{"_id":69,"OBJECTID":6823,"PROJ_NUM":"TS2023-10_11-435","LAST_UPDATED_DATE":"2025-09-05","PROJECT":"Local Road Reconstruction","LOCATION":"AUGUSTA AVE&lt;br&gt; From: DUNDAS ST W&lt;br&gt; To: WALES AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4011469042311, 43.6522746030286], [-79.4012953966375, 43.6526519332204], [-79.401310162027, 43.6526894546233], [-79.4014380266513, 43.6530143608951], [-79.401568830851, 43.653346812673]]}"},{"_id":70,"OBJECTID":6916,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2025-08-21","PROJECT":"Local Road Reconstruction","LOCATION":"ST LEONARDS AVE&lt;br&gt; From: [155 m W] MILDENHALL RD&lt;br&gt; To: LEWES CRES ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3868376928876, 43.7241643264962], [-79.3849823856266, 43.7245527055543], [-79.3840849904893, 43.7247559652186]]}"},{"_id":71,"OBJECTID":6961,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-12-03","PROJECT":"Laneway Reconstruction","LOCATION":"FITZROY TER&lt;br&gt; From: [50 m W] KENSINGTON AVE (TO)&lt;br&gt; To: [52 m W] KENSINGTON AVE (TO) [END] ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4007953113944, 43.6533083653234], [-79.4009283435397, 43.6532792262868]]}"},{"_id":72,"OBJECTID":7556,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-02-11","PROJECT":"Local Road Reconstruction","LOCATION":"QUEEN ELIZABETH BLVD&lt;br&gt; From: ROYAL YORK RD&lt;br&gt; To: CANMOTOR AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2026 - Q3 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Nicholas Mah, Engineering and Construction Services","CONTACT_EMAIL":"nmah@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5024114847587, 43.6233242121296], [-79.502388322328, 43.6232314621474], [-79.5023765495012, 43.6231957898276], [-79.5023476743835, 43.6230885206883], [-79.5023915618077, 43.6230560247085], [-79.5024931661381, 43.623023851518], [-79.5059383051704, 43.6222961048907], [-79.5086603410738, 43.621726673163], [-79.5104959098479, 43.6213926571927], [-79.5115732653795, 43.6211650516346], [-79.5117278700206, 43.6211414431896], [-79.5120476135314, 43.62110744763], [-79.5121870687697, 43.6211063526797], [-79.512298842126, 43.6210982664469], [-79.512585697999, 43.6211110442295], [-79.5126262047751, 43.6211211663464], [-79.5127254614435, 43.6211613196212], [-79.5127903502467, 43.6212174991651], [-79.5128860899754, 43.6213817010864], [-79.5129525595682, 43.6215272553277], [-79.5129642816763, 43.6217029524579], [-79.5129053059278, 43.621894383041], [-79.5128157836966, 43.6220136077361], [-79.5126016092305, 43.6222467319541], [-79.512547052074, 43.6223629821079], [-79.5125368349113, 43.6224478304773], [-79.5125415395663, 43.6225485106805], [-79.5125764326865, 43.6226699988132], [-79.5127198845644, 43.6230366191617], [-79.5127314328539, 43.6230950639955], [-79.5127345122172, 43.6231841325487], [-79.512706710181, 43.6232585322483], [-79.5126600544169, 43.6232997548541], [-79.5126288101251, 43.6233273206093], [-79.5125609765846, 43.6233615604222], [-79.5124218218904, 43.6234032881332], [-79.5123754575981, 43.6234171823279], [-79.5114369659292, 43.6236306763488]]}"},{"_id":73,"OBJECTID":7596,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-21","PROJECT":"Laneway Reconstruction","LOCATION":"[46.30 m N] DUNDAS ST W&lt;br&gt; From: [42.70 m W] BEVERLEY ST&lt;br&gt; To: [95.40 m E] HURON ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3945509554386, 43.6541713705789], [-79.3958991799977, 43.6539042939077]]}"},{"_id":74,"OBJECTID":7716,"PROJ_NUM":"TS2024-02-033","LAST_UPDATED_DATE":"2026-01-14","PROJECT":"Major Road Reconstruction","LOCATION":"RATHBURN RD&lt;br&gt; From: ELMCREST RD&lt;br&gt; To: MILL RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Brian Nolan, Engineering and Construction Services","CONTACT_EMAIL":"bnolan3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5868317875613, 43.6475271106999], [-79.5874367619522, 43.6471609060871], [-79.5874991555519, 43.6471217204081], [-79.5894788287678, 43.6458786024529], [-79.5900293973818, 43.6455330847288], [-79.5900630194625, 43.6455117700085]]}"},{"_id":75,"OBJECTID":7738,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-02-18","PROJECT":"Local Road Reconstruction","LOCATION":"LANGTON AVE&lt;br&gt; From: HASLEMERE RD&lt;br&gt; To: BRAESIDE RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027 - 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3920647113751, 43.7297043070483], [-79.392398244456, 43.7305233017995]]}"},{"_id":76,"OBJECTID":7794,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2025-11-17","PROJECT":"Local Road Rehabilitation","LOCATION":"WALES AVE&lt;br&gt; From: DENISON AVE&lt;br&gt; To: BELLEVUE AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Steven Bertolo, Engineering and Construction Services","CONTACT_EMAIL":"sbertol@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4026878065557, 43.6531114670917], [-79.4029094168243, 43.6530886840643]]}"},{"_id":77,"OBJECTID":7891,"PROJ_NUM":"1","LAST_UPDATED_DATE":"2026-05-21","PROJECT":"Local Road Reconstruction","LOCATION":"DAWLISH AVE&lt;br&gt; From: DANESWOOD RD&lt;br&gt; To: BAYVIEW AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2027 - 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"&lt;Null&gt; Transportation Roads State of Good Repair","CONTACT_EMAIL":"RoadSOGR@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3819177659893, 43.7241363696007], [-79.3797066177742, 43.7246178807873]]}"},{"_id":78,"OBJECTID":7925,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-02-18","PROJECT":"Local Road Reconstruction","LOCATION":"BRAESIDE RD&lt;br&gt; From: LANGTON AVE&lt;br&gt; To: [N-S] BRAESIDE RD [BRANCH] ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Ehsan Movahedi, Engineering and Construction Services","CONTACT_EMAIL":"emovahe@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.392398244456, 43.7305233017995], [-79.3914338830123, 43.7307240895429], [-79.3913668857434, 43.730726150179], [-79.3913186972822, 43.7307197134944]]}"},{"_id":79,"OBJECTID":7938,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-04-20","PROJECT":"Local Road Reconstruction","LOCATION":"CHEMICAL CRT&lt;br&gt; From: [305 m S] CORONATION DR [CUL-DE-SAC]&lt;br&gt; To: CORONATION DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Niloufar Mohajerani, Engineering and Construction Services","CONTACT_EMAIL":"nmohaje@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.1620622834549, 43.7627011681241], [-79.1622774270189, 43.7632646925945], [-79.162553098702, 43.7639405949701], [-79.1629828744996, 43.7649679518647], [-79.1632110524219, 43.7655356803347]]}"},{"_id":80,"OBJECTID":7992,"PROJ_NUM":"TS2023-08-114","LAST_UPDATED_DATE":"2026-08-11","PROJECT":"Laneway Reconstruction","LOCATION":"[37 m N] BEDFORD PARK AVE&lt;br&gt; From: AVENUE RD&lt;br&gt; To: GREY RD ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2026 - Q3 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Fulvio Naccarato, Engineering and Construction Services","CONTACT_EMAIL":"fnaccar@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4167171152926, 43.7249710133473], [-79.4195982658871, 43.7243612797743]]}"},{"_id":81,"OBJECTID":8127,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-19","PROJECT":"Local Road Reconstruction","LOCATION":"RIDELLE AVE&lt;br&gt; From: OVERDALE RD&lt;br&gt; To: MARWOOD RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4340824128994, 43.705597533802], [-79.4352586991205, 43.705352876365]]}"},{"_id":82,"OBJECTID":8205,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-07-14","PROJECT":"Local Road Rehabilitation","LOCATION":"MERRILL AVE E&lt;br&gt; From: MOBERLY AVE&lt;br&gt; To: WOODBINE AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3131251750712, 43.6831350216193], [-79.3123878269936, 43.6833013281381], [-79.3118424404499, 43.6834243527039]]}"},{"_id":83,"OBJECTID":8222,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-07-14","PROJECT":"Laneway Reconstruction","LOCATION":"[195.70 m N] DAVENPORT RD&lt;br&gt; From: ST CLARENS AVE&lt;br&gt; To: [36.10 m W] ST CLARENS AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2027 - Q4 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Adriana Gomez, Engineering and Construction Services","CONTACT_EMAIL":"AGOMEZ4@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.448182713631, 43.6734808147367], [-79.4487804313447, 43.673349970823]]}"},{"_id":84,"OBJECTID":8306,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2026-03-19","PROJECT":"Local Road Reconstruction","LOCATION":"RIDELLE AVE&lt;br&gt; From: MANITOU BLVD&lt;br&gt; To: LAWNHURST BLVD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2026 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Lucas Da Costa, Engineering and Construction Services","CONTACT_EMAIL":"ldacost@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4285835799934, 43.7067692746395], [-79.4306603407718, 43.7063224609686]]}"},{"_id":85,"OBJECTID":8389,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"CRENDON DR&lt;br&gt; From: RENFORTH DR&lt;br&gt; To: ULVERSTON RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Completed","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5735472787101, 43.6450960147083], [-79.5734067342066, 43.645183733373], [-79.5726480940779, 43.6456264282527], [-79.5725401743782, 43.6457056368159], [-79.5724136255698, 43.6458069554373], [-79.5722825017378, 43.645928439874], [-79.5721590625895, 43.6460601988693], [-79.5720382815079, 43.6461865462313], [-79.5719765759243, 43.6463008664614], [-79.5719517447579, 43.6463818043855], [-79.5719331878501, 43.6464852597759], [-79.571934293423, 43.6465807185777], [-79.5719553689536, 43.6467076155854], [-79.5719819640141, 43.6468165153791], [-79.5722359350537, 43.6473590385427], [-79.5724221361956, 43.6478042722849], [-79.5724750679686, 43.6478976999113], [-79.5725259658131, 43.6479592729722], [-79.5725810591525, 43.6480151364809], [-79.572626602396, 43.6480563788126], [-79.5726967035134, 43.6481088752199], [-79.57274736223, 43.6481465857148], [-79.5728347010313, 43.6482047869322]]}"},{"_id":86,"OBJECTID":8402,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"GLOS RD&lt;br&gt; From: [72 m E] CRENDON DR&lt;br&gt; To: CRENDON DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Completed","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5720382815079, 43.6461865462313], [-79.5719156910238, 43.6461577740349], [-79.5718213309182, 43.6461334576538], [-79.571697486555, 43.6461133183224], [-79.5715806157348, 43.6461095929852], [-79.57148653204, 43.646109129779], [-79.571346218019, 43.646123808654], [-79.5711849748936, 43.6461551349187], [-79.5710472360338, 43.6461883366375]]}"},{"_id":87,"OBJECTID":8469,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-03-24","PROJECT":"Major Road Reconstruction","LOCATION":"BLOOR ST W&lt;br&gt; From: DEVONSHIRE PL&lt;br&gt; To: ST GEORGE ST (TO) ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2023 - Q2 2025 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Gabor Szakter, Engineering and Construction Services","CONTACT_EMAIL":"gszakte@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2023","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3983645780234, 43.6678316276819], [-79.3998364772234, 43.6675168810616]]}"},{"_id":88,"OBJECTID":8534,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2021-04-12","PROJECT":"Local Road Reconstruction","LOCATION":"WINDUST GT&lt;br&gt; From: BURNHAMTHORPE RD&lt;br&gt; To: ALLONSIUS DR ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2020 - Q2 2026 (Carry-Over)","STATUS":"Completed","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Joseph Pellegrini, Engineering and Construction Services","CONTACT_EMAIL":"jpellegr@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2019","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.5746933562852, 43.6437098346937], [-79.5743613415923, 43.6429180114133]]}"},{"_id":89,"OBJECTID":8661,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-05-19","PROJECT":"Local Road Reconstruction","LOCATION":"AMHERST AVE&lt;br&gt; From: WESTMOUNT AVE&lt;br&gt; To: NORTHCLIFFE BLVD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4457500166615, 43.6904886806941], [-79.4468253387284, 43.6902652606882]]}"},{"_id":90,"OBJECTID":8697,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-10-06","PROJECT":"Local Road Rehabilitation","LOCATION":"FOSTER PL&lt;br&gt; From: [57.70 m E] ELIZABETH ST (TO) [END]&lt;br&gt; To: ELIZABETH ST (TO) ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3841195243795, 43.6547368097823], [-79.3848612538421, 43.6545472076393]]}"},{"_id":91,"OBJECTID":8730,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-05-09","PROJECT":"Major Road Rehabilitation","LOCATION":"DUNCAN ST&lt;br&gt; From: NELSON ST (TO)&lt;br&gt; To: RICHMOND ST W ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q1 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.388925478037, 43.6488121518102], [-79.3890432031838, 43.6491094371261], [-79.3891808446975, 43.6494570322239]]}"},{"_id":92,"OBJECTID":8877,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-05-19","PROJECT":"Local Road Reconstruction","LOCATION":"CLOVELLY AVE&lt;br&gt; From: OAKWOOD AVE&lt;br&gt; To: GLENHOLME AVE ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q3 2025 - Q4 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marfique Ahmed, Engineering and Construction Services","CONTACT_EMAIL":"mahmed2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4418148944424, 43.6949869783868], [-79.4422965097184, 43.694883644673], [-79.4443384983477, 43.69444560127]]}"},{"_id":93,"OBJECTID":8980,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-12-06","PROJECT":"Local Road Rehabilitation","LOCATION":"SNOOKER ST&lt;br&gt; From: HANNA AVE&lt;br&gt; To: ATLANTIC AVE ","DETAILS":"Replacement of partial road pavement structure or entire road pavement structure for either partial lane width, full lane width or full road width. This could include the asphalt and underlying support materials. Repair, improvement or replacement of road drainage, damaged sidewalk, boulevards and curbs. Work may include the closure of individual lanes or the entire road.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"None","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.421012790974, 43.6394728638148], [-79.4205072927907, 43.6395829333292], [-79.4201913818388, 43.639651717781], [-79.4201884569909, 43.6396515537142], [-79.4200008357756, 43.639685636808]]}"},{"_id":94,"OBJECTID":9055,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-04-05","PROJECT":"Laneway Reconstruction","LOCATION":"Reggae LN ([30 m S] EGLINTON AVE W)&lt;br&gt; From: [48 m W] ALAMEDA AVE&lt;br&gt; To: OAKWOOD AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2025 - Q3 2025","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Christy Manoharan, Engineering and Construction Services","CONTACT_EMAIL":"cmanoha@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4426455670981, 43.6969425141823], [-79.4419622426455, 43.6970910325683], [-79.4419478240541, 43.6970551731194], [-79.4407554329638, 43.6973174709258]]}"},{"_id":95,"OBJECTID":9095,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-12-08","PROJECT":"Laneway Reconstruction","LOCATION":"[36.60 m N] DUNDAS ST W&lt;br&gt; From: BEATRICE ST&lt;br&gt; To: MONTROSE AVE ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2025 - Q2 2026 (Carry-Over)","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Amran Durrani, Engineering and Construction Services","CONTACT_EMAIL":"adurran2@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2024","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4150964877307, 43.6509001365185], [-79.4155810510112, 43.6508007963187], [-79.4161380915938, 43.6506865920015]]}"},{"_id":96,"OBJECTID":9137,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-01-17","PROJECT":"Laneway Reconstruction","LOCATION":"ALEXANDER PL&lt;br&gt; From: ALEXANDER ST&lt;br&gt; To: MAITLAND ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q2 2027 - Q4 2027","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Osa Ehioghiren, Engineering and Construction Services","CONTACT_EMAIL":"oehiogh@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3794628353415, 43.6638277558552], [-79.3796143502986, 43.6641775725259], [-79.3798773209635, 43.6647847463803]]}"},{"_id":97,"OBJECTID":9289,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2023-09-11","PROJECT":"Laneway Reconstruction","LOCATION":"DOUGLAS CAMPBELL LANE&lt;br&gt; From: [57.90 m W] SPADINA AVE&lt;br&gt; To: ROBERT ST ","DETAILS":"Replacement of the entire laneway pavement structure, including the asphalt, concrete and underlying support materials. Repair, improvement, or replacement of laneway drainage, curbs, and associated areas. Work may include the closure of individual lanes or the entire laneway. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"2026","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Augustine Anifowose, Engineering and Construction Services","CONTACT_EMAIL":"aanifow@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2026","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.4012453630662, 43.6582724156016], [-79.4020235971561, 43.6581118081028]]}"},{"_id":98,"OBJECTID":9306,"PROJ_NUM":" ","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"DANESWOOD RD&lt;br&gt; From: GLENALLAN RD&lt;br&gt; To: STRATHEDEN RD ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3814786554225, 43.7222201350774], [-79.3814653408104, 43.7222627961818], [-79.3814612286698, 43.7223466475317], [-79.3814808420112, 43.7224708580688], [-79.3815234363396, 43.7226921078535], [-79.3815864330029, 43.7229965322592], [-79.3816147983447, 43.7231452442144]]}"},{"_id":99,"OBJECTID":9498,"PROJ_NUM":"TS2023-15-290","LAST_UPDATED_DATE":"2024-03-14","PROJECT":"Local Road Reconstruction","LOCATION":"[E] WANLESS CRES [BRANCH]&lt;br&gt; From: BUCKINGHAM AVE&lt;br&gt; To: LAWRENCE AVE E ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q4 2027 - Q1 2030","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Harry Persaud, Engineering and Construction Services","CONTACT_EMAIL":"hpersau3@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2027","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3898692267705, 43.7268063976698], [-79.3898606732866, 43.7268139414683], [-79.3898435033766, 43.7268295060684], [-79.3898263219364, 43.7268445845878], [-79.3898086785103, 43.7268611478637], [-79.3897915132128, 43.7268809520442], [-79.389776690857, 43.7269023787044], [-79.3897282049946, 43.7269650975817], [-79.3896618779833, 43.7270370344883], [-79.38961405376, 43.7271110865146], [-79.3895651232925, 43.7272061823481], [-79.3895301411238, 43.7273029568697], [-79.3895110709689, 43.7273865509452], [-79.3895042060296, 43.7274950632429], [-79.3895074426657, 43.7275844846755], [-79.389522291939, 43.7276701188087], [-79.3895314541369, 43.7277907172529]]}"},{"_id":100,"OBJECTID":9510,"PROJ_NUM":"TS2023-13-001","LAST_UPDATED_DATE":"2024-04-25","PROJECT":"Major Road Reconstruction","LOCATION":"[N] GERRARD ST E [BRANCH]&lt;br&gt; From: GERRARD ST E&lt;br&gt; To: PARLIAMENT ST ","DETAILS":"Replacement of the entire road pavement structure, including the asphalt and underlying support materials. Repair, improvement, or replacement of: road drainage, curbs, boulevards and sidewalks. Work may include the closure of individual lanes or the entire road.  Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well. Also, includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.","DURATION/ Construction Timeline":"Q1 2027 - Q1 2028","STATUS":"Active","INV_PRIORITY":"1 - Projects with approved or allocated funding in the Capital Works Program.","OWNER":"Transportation Services","CONTACT_NAME":"Marilia Cimini, Engineering and Construction Services","CONTACT_EMAIL":"mcimini@toronto.ca","INV_WEB_SITE":"https://www.toronto.ca/services-payments/streets-parking-transportation/road-maintenance/road-sidewalk-repair/","INV_DISPLAY_PROGRAM":"TS_Road_Reconstruction","INV_DISPLAY_SYMBOL":"12","START_YEAR":"2025","CONTR_NUMBER":"EXTERNAL","geometry":"{\"type\": \"LineString\", \"coordinates\": [[-79.3681759569219, 43.6621129637347], [-79.3671914128856, 43.6623343372957]]}"}], "fields": [{"id": "_id", "type": "int"}, {"id": "OBJECTID", "type": "int4", "info": {"notes": "Unique row identifier"}}, {"id": "PROJ_NUM", "type": "text", "info": {"notes": ""}}, {"id": "LAST_UPDATED_DATE", "type": "date", "info": {"notes": "The most recent date on which the project information was revised or updated"}}, {"id": "PROJECT", "type": "text", "info": {"notes": "Road Construction"}}, {"id": "LOCATION", "type": "text", "info": {"notes": "The name, beginning and end of the street where the road reconstruction project is located"}}, {"id": "DETAILS", "type": "text", "info": {"notes": "Project scope summary"}}, {"id": "DURATION/ Construction Timeline", "type": "text", "info": {"notes": "The year in which the project begins and ends"}}, {"id": "STATUS", "type": "text", "info": {"notes": "The status of the project"}}, {"id": "INV_PRIORITY", "type": "text", "info": {"notes": ""}}, {"id": "OWNER", "type": "text", "info": {"notes": "Owner of all road reconstruction projects is Transportation Services"}}, {"id": "CONTACT_NAME", "type": "text", "info": {"notes": "Contact person information"}}, {"id": "CONTACT_EMAIL", "type": "text", "info": {"notes": "Contact email address"}}, {"id": "INV_WEB_SITE", "type": "text", "info": {"notes": ""}}, {"id": "INV_DISPLAY_PROGRAM", "type": "text", "info": {"notes": ""}}, {"id": "INV_DISPLAY_SYMBOL", "type": "text", "info": {"notes": ""}}, {"id": "START_YEAR", "type": "text", "info": {"notes": "The year in which the project begins"}}, {"id": "CONTR_NUMBER", "type": "text", "info": {"notes": ""}}, {"id": "geometry", "type": "text", "info": {"notes": ""}}], "_links": {"start": "/api/action/datastore_search?resource_id=40d94b5a-cbf2-4e04-8d48-24038d163d0c", "next": "/api/action/datastore_search?resource_id=40d94b5a-cbf2-4e04-8d48-24038d163d0c&offset=100"}, "total": 335, "total_was_estimated": false}}